Istanbul–Kapıkule railway

The Istanbul–Kapıkule railway is a 229 km (142 mi) long rail line under construction from Halkalı, at Istanbul suburbs to Kapıkule, Turkey at the Bulgarian border. The construction is being financed about half with EU IPA funds (275M€ out of ~550M€) and should strengthen and increase the capacity of rail transport link between Europe and Turkey.[1]

Istanbul–Kapıkule railway
Overview
TypeHeavy rail
SystemTCDD
StatusUnder construction
LocaleWestern Thrace
TerminiHalkalı, Turkey
Kapıkule, Turkey
Operation
OwnerTurkish State Railways
CharacterMainline
Depot(s)Halkalı Yard, Edirne Yard, Kapıkule Yard
Technical
Line length229 km (142 mi)
Number of tracksDouble track
Track gauge1,435 mm (4 ft 8 12 in) standard gauge
Electrification25 kV 50 Hz
Operating speed200 km/h (120 mph)

Route description

From Halkalı, the line follows approximately the same corridor as line to Pythio until reaching Çerkezköy but with a smoother and shorter geometry. From Çerkezköy it gets south of the O-3 motorway and parallels it until Edirne. From Edirne onwards, it follows the same corridor as Pehlivanköy–Svilengrad until Kapıkule. The line will be passing through Lüleburgaz and Babaeski and short-cutting Çorlu and Pehlivanköy, both currently located on the main line. The Istanbul–Pythio and Pehlivanköy–Svilengrad lines will as a consequence be partly replaced (in sections where they overlap with the line), partly disused and partly become branch lines of this new main line.

Consequences on freight transport

As part of environmental/logistical policies of EU and Turkey, there are continuous efforts in transferring freight transports from TIR to rail. In this logic and for cost effectiveness, it has been decided to upgrade/rebuild the old railways to allow freight train services instead of building a high-speed railway from scratch. This should also unclog the saturation of road freight transport at Kapıkule border checkpoint.

It is also planned to connect the line to the Muratlı–Tekirdağ railway with the construction of an extra new section between Büyükkarıştıran and Muratlı in order to allow freight trains to reach Terkidağ port.

gollark: [EXPUNGEMENT EXPUNGED]
gollark: Specifically for temporary transference into apioformic entities or the training of GPT-██, though.
gollark: By the way, clause 4.7 *does* permit me to repurpose your soul temporarily.
gollark: I don't think you understand how PotatOS privacy policies work.
gollark: No comment.

References


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.