G Line (Los Angeles Metro)
The G Line is a bus rapid transit line in the Metro Busway network in Los Angeles, California. It operates between Chatsworth and North Hollywood stations in the San Fernando Valley. The 18-mile (29 km) G Line uses a dedicated, exclusive right-of-way for the entirety of its route with stations located at approximately one-mile intervals; fares are paid via TAP cards at vending machines on station platforms before boarding to improve performance. It is one of the two lines in the Metro Busway system and is operated by the Los Angeles County Metropolitan Transportation Authority (Metro).
G Line | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Metro Liner traveling on the exclusive busway near Chatsworth | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Overview | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Other name(s) | Orange Line (2005–2020) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Type | Bus rapid transit | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
System | Los Angeles Metro Busway | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Status | In service | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Termini | North Hollywood Chatsworth | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stations | 17 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Daily ridership | 22,469 (July 2016)[1] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line number | 901 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Website | Orange Line | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operation | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | October 29, 2005 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator(s) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Character | At-grade exclusive right-of-way | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Depot(s) | Division 8 (West San Fernando Valley) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Rolling stock | New Flyer Xcelsior XE60 NABI 60-BRT & 65-BRT | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | 18 mi (29.0 km)[2] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The line, which opened on October 29, 2005, follows part of the Southern Pacific Railroad's former Burbank Branch Line which provided passenger rail service from 1904 to 1920; it was subsequently used by Pacific Electric streetcars from 1911 to 1952. At North Hollywood station, the G Line connects with the B Line subway which offers service to Downtown Los Angeles via Hollywood. The Metro Orange Line bicycle path runs alongside part of the route.
In 2020, the line was renamed from Orange Line to the G Line while retaining its route number and the color orange in its square icon.[3][4][5][6]
The Institute for Transportation and Development Policy (ITDP), under its BRT Standard, has given the Orange Line corridor a Bronze ranking.[7]
Service description
Because of its many differences from a standard bus service, Metro has branded the G Line as part of the region's network of light and heavy rail lines and it appears on the same system map as the rail lines. The buses are painted in the silver-and-gray color scheme of Metro Rail vehicles. The G Line is rarely referred to by its line number (901), but it sometimes appears on documents and destination signage.
The G Line's icon color, and former Orange Line name, were inspired by the many citrus trees that once blanketed the San Fernando Valley. In the planning stages the G Line was known as the San Fernando Valley East-West Transitway, and later the Metro Rapidway.
Operation
G Line buses operate 24 hours a day.[8] At peak hours (between 6am and 7pm eastbound, 5am and 6pm westbound), every other bus is a short turn, only operating between North Hollywood and Canoga station.
Station list
Current Stations
Stations | Date Opened | City/ Neighborhood | Major connections and notes[9][10] |
---|---|---|---|
North Hollywood | October 29, 2005 | North Hollywood | Connects with Park and ride: 1,085 stalls |
Laurel Canyon | Valley Village | ||
Valley College | Valley Glen | ||
Woodman | |||
Van Nuys | Van Nuys | Park and ride: 307 stalls | |
Sepulveda | Park and ride: 260 stalls | ||
Woodley | |||
Balboa | Lake Balboa | Park and ride: 273 stalls | |
Reseda | Tarzana | Park and ride: 442 stalls | |
Tampa | |||
Pierce College | Winnetka | Park and ride: 392 stalls | |
De Soto | |||
Canoga | December 27, 2006[11] | Canoga Park | Park and ride: 246 stalls |
Sherman Way | June 30, 2012 | Park and ride: 207 stalls | |
Roscoe | |||
Nordhoff | Chatsworth | ||
Chatsworth | Connects with Amtrak and Metrolink Park and ride: 609 stalls |
Former Stations
Stations | City/ Neighborhood | Date Opened | Date Closed |
---|---|---|---|
Warner Center | Woodland Hills | October 29, 2005 | June 24, 2018[12] |
Ridership
Maximum recorded average weekday boardings were 31,904 during September 2013.[1] While usage initially fell during the Great Recession with average weekday boarding running at 22,669 in 2010, it has since rebounded, averaging 28,263 weekday boardings so far in 2015.[1]
Year | Weekday boardings |
---|---|
2010 | 22,669 |
2011 | 24,152 |
2012 | 27,233 |
2013 | 29,220 |
2014 | 27,977 |
2015 | 27,023 |
2016 | 24,857 |
History
The majority of the Orange Line is built on part of the former Southern Pacific Railroad, which was later taken over for Pacific Electric Red Car service; passenger service on this segment ended in 1952, but the right-of-way remained undeveloped, and was acquired by Metro in 1991. As the Metro Rail system was being designed in the 1990s, initial plans were to build an extension of the Metro Red Line there, since the purchased right-of-way's eastern terminus was at the site of the planned North Hollywood station. However, political developments stymied these plans: community objections to surface transit along the route resulted in a 1991 law mandating that any line along the route be built as a deep-bore tunnel,[13][14] but a 1998 ballot measure driven by perceptions of mismanagement banned the use of county sales tax to fund subway tunneling.[15][16][17] Prevented from using the route for rail, Metro proceeded to create its first bus rapid transit line along the corridor, and despite further lawsuits from area residents,[18] the line opened on October 29, 2005, at a final cost of $324 million ($23 million per mile).[19]
On June 23, 2009 construction began on a four-mile (6 km) extension from Canoga northward along the Southern Pacific trackbed[20] to the Metrolink station in Chatsworth. Metro's board approved the plan on September 28, 2006, and it was completed in 2012 at a cost of $215 million.[21][22][23] This created two branches at the western end of the line beyond Canoga station; the older branch proceeded outside the busway on city streets to Warner Center. In 2018, this branch was eliminated and replaced with a frequent service local shuttle, leaving the entirety of the Orange Line on dedicated right-of-way.[24]
Proposed developments
Electrification
In July 2017, Metro voted to begin a transition to an all-electric bus fleet. While the entire fleet will probably not be replaced until 2030, the transition on the two Metro Busway lines will begin much sooner. A contract was signed to purchase 35 60-foot articulated zero emission New Flyer XE60 buses for the Orange Line, with all-electric service on the line expected by 2020.[25]
Grade separation and crossing gates
Collisions with automobiles occurred weekly during the first several months of operations. Metro has noted that the Orange Line had about the same accident rate as other bus lines in the city on a per-mile basis,[26][27] and has stated that the line's accident rate is "less than half" of Metro's entire fleet of buses.[28] The A Line also had a significant number of collisions in its early years and currently has the highest fatality rate in North America.[29]
Metro issued slow orders after two collisions in November 2005 involving a critically injured driver. Buses were required to slow to 10 mi/h (16 km/h) vs. 25–30 mi/h (40–50 km/h).[30][31]
In December 2005, Metro called for the installation of red-light cameras at most intersections.[32]
As part of the package of enhancement to the LA Metro system approved by voters in 2016 with Measure M, in October 2017 Metro recommended a series of improvements to the Orange Line. These include quad crossing gates at 34 intersections, and the construction of a mile-long elevated section between Sepulveda and Van Nuys Boulevard. These improvements would eliminate much of the time Orange Line buses spend waiting at red lights, and would cut end-to-end travel time along the entire route by 29%. Projected construction costs are $283 million.
The project is currently in the pre-construction, planning, and public outreach phase, but the goal is to begin full construction in 2019 and complete it by 2025.[33][34] The pre-construction phase of the Metro Orange Line grade-separation has already begun, starting with the LADWP undergrounding the overhead power lines at Sepulveda Blvd and Orange Line in Van Nuys.
Possible Burbank extensions
Two possible extensions of the Orange Line to Burbank have been proposed. One possible extension proposed by transit advocates, including members of The Transit Coalition,[35] is an extension from North Hollywood station to Hollywood Burbank Airport, which would run north on Vineland Avenue and east on Vanowen Street to the airport, to connect with the Metrolink station.
Another extension proposed is from the North Hollywood Station along Chandler Boulevard that would connect to the Burbank Downtown Metrolink Station.[36] The 3.9 mile long arrangement would provide increased access to commuter rail as well as transit access to the pedestrian-friendly entertainment and retail district of Downtown Burbank at the proposed new terminus. Proponents of this expansion also argue that the extended line could eventually serve as the beginning of a San Fernando Valley / Orange Line to Pasadena / Gold Line connection.
As of October 2011, both the Bob Hope Airport and Downtown Burbank extension options are being studied, in addition to other potential BRT routes in Los Angeles County. The abandoned roadbed east of North Hollywood Station was converted into the Chandler Bikeway rail trail.[37]
Conversion to light rail
When purchased in 1991, Metro originally considered the route for use as either light rail or a Red Line extension: both ideas have been discussed repeatedly by train advocates. A railroad route would allow longer vehicles and higher operating speeds. The conversion back to a railroad would be relatively inexpensive: former mayor Richard Riordan described it as the "least expensive rail alternative" of the lines under consideration.[38] However, there are several legal and political challenges. Until 2014, Metro was prohibited by law from converting the Orange Line to any form of rail other than a subway. Due to a 1998 proposition, Metro also cannot spend the sales tax revenue from previously passed propositions, but can use revenue from subsequent tax increase propositions such as Measure R funds (conversion of Orange Line to rail is not included in any Measure R projects, but does include the "subway to the sea" along Wilshire Boulevard and other subway proposals) and other sources of revenue on subways.
Metro has been criticized for dismantling existing railroad infrastructure for bus usage. In October 2013, Los Angeles City 4th District Councilman Tom LaBonge introduced a motion to support the repeal of Public Utilities Code section 130265 (1991's SB 211, or Robbins Bill) and support of any legislative and/or administrative action by Metro which would prioritize the development of rail-based transit. The motion was passed by the City Council on October 29, 2013 and approved by the Mayor on November 6, 2013.[39]
In April 2015, a report prepared for Metro estimated that conversion of the Orange Line to light rail would take two to three years and cost between $1.2 and $1.7 billion. This price would include both upgraded infrastructure and corresponding rail vehicles. Improvements to the busway to improve capacity, including more and larger buses and grade separation at busy intersections, could be implemented for $230 to $350 million. The report noted that if not upgraded in some way in the near future, the Orange Line would soon reach capacity at rush hours.[40]
As the above projects are phased in, long term plans in 2018 had full conversion planned to take place by 2050.[34]
Capacity enhancements
There is concern that the Orange Line will soon reach its engineered capacity, and has exceeded its designed capacity during peak periods.[41] During peak hours, the signaling system is designed to balance the Orange Line buses with vehicle cross traffic. Adding more buses requires platooning, or bunching, which is the running of convoys of two or more buses together, similar to what rail achieves in having multiple cars per train. Greater signal prioritization is also an option, and comes at the cost of decreasing cross street travel times and capacity. Another alternative requires the changing of state law or the granting of a Caltrans exemption from state law and the purchasing of 80-foot-long (24 m) buses.[42]
Incidents
On October 27, 2005, two days before the line's official opening, a motorist driving with a suspended license ran a red light and collided with an eastbound bus at Vesper Avenue. There were no injuries.[43]
During November 2005 there were two collision-caused injuries. In the first, a fare inspector on the bus was taken to a hospital for minor injuries after a 65-year-old female driver made an illegal right turn against a red light and struck an Orange Line bus near the crossing at Corbin Avenue in Reseda.[44] In the second, one person was seriously injured and 14 others hospitalized after an elderly motorist apparently ran a red light while using a mobile phone.[45] After the second collision, Metro instructed all buses to slow down at intersections[30] and installed white strobe lights on the sides of the buses to improve visibility. They said that they would review any and all ideas to improve safety on the line.[31]
In October 2006, a delivery truck hit the side of a bus. One person was seriously injured and 16 received minor injuries.[46]
Fleet
The G Line currently uses NABI 60-BRT buses. The large buses, which have been dubbed "Metro Liners" by Metro, are twenty feet longer than the standard forty-foot bus, and carry up to 57 passengers, which is about 50% more passengers. (A prototype 65-foot bus is also used for the G Line.) The buses are articulated in the center due to this longer length and have three doors for faster boarding and alighting. Vehicles have no fareboxes because the Metro G Line operates on a proof-of-payment system, like the Metro Rail network. These buses are scheduled to be replaced by battery electric New Flyer XE60 buses, starting in July 28, 2020 and finish by December 2020.
See also
- List of Los Angeles County Metro Liner BRT Stations
References
- "Metro Ridership interactive tool". LA County Metro.
- "Facts At A Glance". Los Angeles County Metropolitan Transit Authority. December 17, 2013. Retrieved December 26, 2013.
- metro changes its mind: letters come first now. https://laist.com/2019/09/25/la_metro_blue_line_will_reopen_as_the_a_line.php Archived September 26, 2019, at the Wayback Machine
- Scauzillo, Steve (December 13, 2018). "Because they're out of colors, LA Metro will rename all its train lines and rapid busways with letters in 2019". Los Angeles Daily News. Retrieved December 14, 2018.
- Newton, Damien (November 20, 2018). "Metro Moves Ahead with Changes to How They Name Rail/BRT". Streetsblog LA. Retrieved December 14, 2018.
- "Meet the Line Letters: Information for Metro Employees" (PDF). LACMTA. December 2019. Retrieved January 7, 2020.
- "BRT Rankings". Institute for Transportation and Development Policy. 2020. Retrieved April 26, 2020.
- "Orange line timetable" (PDF). Los Angeles County Metropolitan Transit Authority. June 24, 2018. Retrieved June 24, 2018.
- "Metro B Line (Red)". www.metro.net. Retrieved July 23, 2020.
- "Metro Parking Lots by Line". www.metro.net. Retrieved July 23, 2020.
- "New Canoga Station, Park & Ride Lot Opens on Western Terminus of Metro Orange Line". Metro.net December 27, 2006.
- "Warner Center Bus Service Improvements". Warner Center. Los Angeles County Metropolitan Transportation Authority. Retrieved June 24, 2018.
- "Is a Busway the Valley Way?; The region's Orange Line is ready to roll but some wonder if it will do much to curtail traffic.", by Amanda Covarrubias, The Los Angeles Times, page A1, October 18, 2005
- "Hahn Tiptoes in Front of Buses, Is Flattened.", by Steve Lopez, The Los Angeles Times, July 27, 2001
- Broverman, Neal (February 4, 2014). "State Could be About to Repeal Ban on Light Rail in the Valley". LA Curbed. Retrieved October 16, 2015.
- "Legal arguments against the busway".
- "Public utilities code section 130250-130265". Archived from the original on December 12, 2012. Retrieved October 6, 2010.
- Liu, Caitlin; and Times Staff Writers (March 13, 2003). "Valley Busway Opponents Told to Reimburse MTA". Los Angeles Times.
- "Crashes Heighten Busway Concerns", by Amanda Covarrubias, Caitlin Liu, and Times Staff Writers, Los Angeles Times, November 3, 2005
- "Item 44 Program Management Project Budget and Schedule Status" (PDF). Metro. January 18, 2012. p. 3. Retrieved December 26, 2013.
- Guccione, Jean. "MTA to Run Orange Line Busway to Chatsworth". Los Angeles Times. September 29, 2006. B1.
- extension diagram
- "Canoga Park-Chatsworth busway construction kickoff Wednesday" Archived June 28, 2011, at the Wayback Machine, Sue Doyle, Daily News, Retrieved June 23, 2008
- https://thesource.metro.net/2018/02/08/service-council-approves-new-warner-center-circulator-connecting-with-orange-line/
- https://thesource.metro.net/2017/07/27/as-metro-pursues-electric-bus-fleet-by-2030-three-bus-contracts-go-to-board-on-thursday/
- "Similar bumpy roads for transit in L.A., Houston – Crashes raised safety concerns for light rail here and California's Bus Rapid Transit".
- Liu, Caitlin. "Six Hurt in Latest Orange Line Crash". Los Angeles Times.December 8, 2005.
- LA Times – Orange Line bus crash hurts 17
- Wells, John V (July 18, 2000). "Train Whistle at Rail Grade Crossings". Congressional Testimony.
- Liu, Caitlin and Amanda Covarrubias. "Orange Line Model Beset by Crashes". Los Angeles Times. November 4, 2005.
- Liu, Caitlin. "Orange Line Buses May Get Strobe Light Signals". Los Angeles Times. November 18, 2005.
- Liu, Caitlin. "After Crashes, Red-Light Cameras to Be Installed at 12 Orange Line Crossings" Los Angeles Times. December 15, 2005. B1.
- http://thesource.metro.net/2017/10/16/new-orange-line-bridge-and-crossing-gates-recommended-to-reduce-busway-travel-times/
- Olga, Grigoryants (July 17, 2018). "LA's Metro says improvements are in the works for the Orange Line, with light rail in mind". Los Angeles Daily News. Retrieved July 17, 2018.
- "The National Transit Coalition". thetransitcoalition.us. Archived from the original on February 16, 2009. Retrieved April 26, 2020.
- Sotero, Dave (October 18, 2011). "Orange Line Bridges: Are they strong enough for light rail?". The Source. Metro. Retrieved May 31, 2015.
- "Los Angeles County Bus Rapid Transit Corridors" (PDF). Metro. October 19, 2011. Retrieved May 31, 2015.
- "Legal Arguments Against the Busway". San Fernando Valley Transit Insider. Retrieved May 31, 2015.
- "Council File: 13-0002-S100". LACityClerkConnect. City of Los Angeles. Retrieved May 31, 2015.
- Nelson, Laura J. (April 10, 2015). "Report: Converting Metro's Orange Line to rail could cost $1.7 billion". Los Angeles Times. Retrieved May 31, 2015.
- "Busway so popular, it's nearing capacity" (PDF).
- "Bus System Design Features That Significantly Improve Service Quality And Cost Efficiency".[broken link]
- Liu, Caitlin. "Car Hits Bus on Transitway Test Run, Raising Concerns for Safety", Los Angeles Times, October 28, 2005.
- "Car Collides With Orange Line Bus". ABC7. November 2, 2005. Retrieved December 26, 2013.
- "Busway Safety Controls Boosted 10 MPH Speed Ordered Entering Intersections".
...in the aftermath of Wednesday's collision that sent 15 people to the hospital, one with a severe injury. The collision, one of two Wednesday, was caused by a 78-year-old motorist who ran a red light, possibly while talking on a cell phone.
- Silverstein, Stuart (October 24, 2006). "Orange Line bus crash hurts 17". Los Angeles Times.
A crowded Orange Line bus collided with a delivery truck in the east San Fernando Valley on Monday afternoon, leaving one person seriously hurt and 16 others apparently with minor injuries, authorities said.
External links
Wikimedia Commons has media related to LACMTA Orange Line. |
- LA Metro: Orange Line map and stations – route map and station addresses and features
- LA Metro: Orange Line Timetable – schedules
- LA Metro: Orange Line Extension – 4 miles (6.4 km) extension under construction from Canoga Station north to Chatsworth Metrolink Station (2012).
- Orange Line history
- LA Metro: official (countywide) website – operator of the Orange Line
- Light Rail Now: "A Bus by Any Other Name Is Still ... a Train ? " – by The Light Rail Now project.