Eryaman YHT railway station
Eryaman YHT railway station (Turkish: Eryaman YHT garı), previously known as Ankara West YHT railway station (Turkish: Ankara Batı YHT garı), is a railway station in Ankara, Turkey. Once Başkentray commuter rail service begins in April, the station will become a transfer point between YHT high-speed trains and local commuter trains, replacing Sincan station.[1] Eryaman station also replaced Emirler station, located about 175 m (574 ft) east of the station, which was demolished in July 2016.[2]
ERYAMAN YHT | |||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
TCDD Taşımacılık high-speed rail station | |||||||||||||||||||||||||||
Location | İstasyon Cd. Etiler Mah. 06796 Etimesgut, Ankara Turkey | ||||||||||||||||||||||||||
Coordinates | 39.9556°N 32.6304°E | ||||||||||||||||||||||||||
Owned by | Turkish State Railways | ||||||||||||||||||||||||||
Operated by | TCDD Taşımacılık | ||||||||||||||||||||||||||
Line(s) | |||||||||||||||||||||||||||
Platforms | 3 (2 island platforms, 1 side platform) | ||||||||||||||||||||||||||
Tracks | 6 | ||||||||||||||||||||||||||
Connections | |||||||||||||||||||||||||||
Construction | |||||||||||||||||||||||||||
Parking | Yes | ||||||||||||||||||||||||||
Disabled access | Yes | ||||||||||||||||||||||||||
Architectural style | Modernism | ||||||||||||||||||||||||||
History | |||||||||||||||||||||||||||
Opened | 15 March 2018 | ||||||||||||||||||||||||||
Services | |||||||||||||||||||||||||||
|
Eryaman YHT station consists of two island platforms serving four tracks, with two more tracks for bypassing trains. A large station building houses a waiting lounge, cafes and ticket offices. Next to the station is the Etimesgut Yard, opened in February 2016, which is a large maintenance facility and train yard for YHT train-sets.[1]
Station Layout
Street | Station house | Entrances/Exits |
Tracks | ||
Track 1 | ← Başkentray toward Sincan | |
Island platform (Platform 1), doors will open on the left | ||
Track 2 | Başkentray toward Kayaş → | |
Track 3 | ← Yüksek Hızlı Tren toward Pendik or Konya, does not stop here | |
Track 4 | ← Yüksek Hızlı Tren toward Pendik or Konya | |
Island platform (Platform 2), doors will open on the left | ||
Track 5 | Yüksek Hızlı Tren toward Ankara → | |
Track 6 | Yüksek Hızlı Tren toward Ankara, does not stop here → |
References
- "Ankara YHT Gar Kompleksi 2016'da tamamlanacak". rayhaber.com (in Turkish). 7 February 2015. Retrieved 31 October 2017.
- "Başkentray Yıl Sonu Hizmete Girecek". rayhaber.com (in Turkish). 23 June 2016. Retrieved 31 October 2017.