Donabate railway station

Donabate railway station (Irish: Stáisiún Dhomhnach Bat) serves Donabate in Fingal. It is the first station from Dublin not served by DART services.

Donabate

Domhnach Bat
The historic station building at Donabate, built in 1844
LocationBeaverstown, Donabate, County Dublin, K36 H973
Republic of Ireland
Coordinates53.4855°N 6.1512°W / 53.4855; -6.1512
Owned byIarnród Éireann
Operated byIarnród Éireann
Line(s)Belfast–Dublin
Platforms2
Tracks2
Construction
Structure typeAt-grade
Other information
Station codeDBATE
Fare zoneSuburban 3
History
Opened1844
Services
Preceding station   Iarnród Éireann   Following station
Malahide   Commuter
Northern Commuter
  Rush & Lusk
  Future  
Malahide   DART
Line 2
  Rush and Lusk

Description

The station has two platforms, one for each of the two lines which run through the station. Built in the mid-19th century, the station has a traditional appearance. The booking office has a small waiting area and toilet facilities. There are two ticket-issuing machines and one part-time manned window for the purchase of tickets. The station is located in the centre of the town.

When the station was opened there was no footbridge built. When CIÉ closed Midleton station in Cork, the GS&WR iron footbridge was moved to Donabate. This footbridge was subsequently removed in 2011 and replaced by a new bridge with steps and lifts for increased accessibility. In 2013, a new building was built on the platform containing ticket barriers. Whilst Midleton has since been reopened.

Donabate is served by 22000 Class and 29000 Class diesel railcars. However 201 Class locomotives + DeDietrich rolling stock pass through on Enterprise services as do 071 Class locomotives + Tara Mines Wagons with mineral ore trains from Boliden Tara Mines near Navan.

The linespeed in Donabate is 90 mph, the highest on the Dublin - Belfast Mainline and the highest permittable speed of the DeDietrich coaches.

The station has two lifts and a footbridge connecting Platforms 1 and 2.

Future and plans to extend the DART

Under Transport 21, there were plans to continue the DART from Malahide railway station, through Donabate railway station and up to Drogheda railway station by 2015. However, this was delayed due to the Great Recession and was shelved in 2015 to make way for the development of the MetroLink[1]. Current long-term expansion plans have ambitions to electrify the station by 2040[2].

gollark: ffmpeg -i thing -i thing thing
gollark: Bridge failures will be addressed when I can fix them.
gollark: No.
gollark: They are mere pawns of memetic evolution.
gollark: The "COVID-19 variants" are just airborne vaccines.

See also

References


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.