The Cruas Nuclear Power Station is a nuclear power plant located in Cruas and Meysse communes, Ardèche next to the Rhône River in France. The site is 35 km north of Tricastin Nuclear Power Center and near the town of Montélimar.

Cruas Nuclear Power Plant
Cruas Nuclear Power Plant
Official nameCentrale Nucléaire de Cruas
CountryFrance
LocationCruas and Meysse, Ardèche
Coordinates44°37′59″N 4°45′24″E
StatusOperational
Construction began1978
Commission dateApril 29, 1983 (April 29, 1983)
Operator(s)EDF
Nuclear power station
Reactor typePWR
Reactor supplierFramatome
Power generation
Units operational4 x 956 MW
Make and modelAlstom
Nameplate capacity3824 MW
Capacity factor69.4%
Annual net output23,241 GW·h
External links
Websitewww.edf.com
CommonsRelated media on Commons

The site contains 4 pressurized water reactors of 900 MW each, totaling 3600 MW total. The construction began in 1978, the reactors were built between 1983 and 1984.

The power station accounts for 4 to 5% of the electric energy production in France, and 40% of the annual usage by the Rhone-Alps area. The site employs about 1,200 workers and has an area of 148 hectares. Cooling water comes from the Rhône river.

Incidents

On 1 December 2009 reactor 4 was shut down after vegetation blocked the intake of the cooling system. The nuclear safety authority Autorité de sûreté nucléaire (ASN) classified the incident as level 2 on the International Nuclear Event Scale.[1][2][3]

On December 5, 2011, two anti-nuclear campaigners breached the perimeter of the Cruas Plant, escaping detection for more than 14 hours, while posting videos of their sit-in on the internet.[4]

A 4.8M earthquake in the Ardeche region on 11 November 2019 meant that Électricité de France was required to halt production and check equipment at the plant. This period offline will mean that EDF will not meet its annual power production projection.[5]

Mural

Cooling tower mural on right. Art by Jean-Marie Pierret

In 1991 it was decided by the owners of the plant to carry out a Mural project on the cooling towers focusing on the topic of ecology. Author of the mural on the Tignes Dam, Jean-Marie Pierret was selected to design the painting, 9 mountaineers helped to actually paint the structure. The painting reflects the basics of Water and Air and is titled Aquarius, and was inaugurated in 2005. It took 8,000 working hours and 4,000 liters of paint to complete the project.

gollark: Well, with other stuff they can be.
gollark: There are mods for computers and robots.
gollark: I have both cable management issues *and* vast quantities of dust in my computer, yay.
gollark: There are mods for it. I don't know if you can do it on 1.14.4 with the mess going on with that.
gollark: The Minecraft one.

References

  1. "Emergency at French nuclear power plant". Radio France Internationale. 2009-12-02. Retrieved 2009-12-04.
  2. "Centrale nucléaire de Cruas arrêt à titre préventid de l'unité de procduction n°4" (PDF) (in French). Electricité de France. 2009-12-02. Retrieved 2009-12-04.
  3. Evangelia Petit (2009-12-02). "Levée du plan d'urgence interne à la centrale nucléaire de Cruas (Ardèche)" (in French). Autorité de Sûreté Nucléaire. Archived from the original on 2009-12-05. Retrieved 2009-12-04.
  4. Tara Patel (December 16, 2011). "Breaches at N-plants heighten France's debate over reactors". Seattle Times.
  5. France's EDF cuts nuclear output forecast after quake, SpaceWar.com, 2019-11-14
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.