Chord link line (Kolkata Suburban Railway)

The Chord link line (Kolkata Suburban Railway) is also known as Calcutta Chord link (CC Link) which is the Branch line of the Kolkata Suburban Railway which comes under the jurisdiction of Eastern Railway's Sealdah Division & Howrah Division. Its termini are Sealdah (SDAH) and Dankuni Junction on the Sealdah-Dankuni route where it meets Howrah–Bardhaman chord line with the length of 22km with 9 stations. Which is an important link for both Divisions of Eastern Railway zone and has an direct connectivity with South Eastern Railway.

Calcutta Chord link line
Dankuni railway station, terminal station in Chord Link line
Overview
TypeCommuter rail
SystemKolkata Suburban Railway
StatusOperational
LocaleWest Bengal
TerminiSealdah
Dankuni Junction
Stations14 (9 mainline, 5 branch line)
Daily ridership0.291 Million
WebsiteEastern Railway
Operation
Opened1865 (1865)
OwnerIndian Railway
Operator(s)Eastern Railway
CharacterAt grade, elevated
Depot(s)Sealdah
Technical
Line length22 km (14 mi)
Number of tracks2
Track gauge1,676 mm (5 ft 6 in) Broad gauge
Electrification25 kV overhead line
Operating speedup to 100 km per hour

From Sealdah to Dum Dum Junction it shares a line with the Eastern line's Sealdah section mainline. After Dum Dum Junction, It Splits into two lines and starts elevation and runs parallel with the Beleghoria Expressway by Passing through Baranagar after which it crosses the Hooghly through the Vivekananda Setu and onto Bally Ghat and also Elevates over the Howrah–Bardhaman main line at Bally and Ends at Dankuni Junction. Additional Chord Connector has two wing which meets at Rajchandrapur before proceeding to Sealdah & other wing proceed to Dankuni. The Additional Chord link line which connects to the Santragachi–Amta branch line with the length of 13 Km to Andul which it lies at the South Eastern main line to Kharagpur is totally a single line. which stretches parallel to the NH-6 popularly Bombay Road. In the middle of ACCL there is Bhattanagar RPF post where 4 track exist for Goods Train. Towards Andul, it crosses Kona bridge and meets with Howrah-Amta Line at Baltikuri Halt where no train stops at present.

This line was opened in 1865 and converted to electrification in 1965,[1] On that time the Freight Services was passed on this line which was profitable for railways and the EMU trains also runs on this line for connecting to Chord line to Howrah Jn for plying long-distance trains. But due to Passenger Demand was Increased for Long Distance trains Start from Sealdah to pass through to this line and connects to the rest of India. for that purpose A Duronto Train to Puri from Sealdah was Started on 12 February 2012 for direct connectivity to Puri from Sealdah.[2]

Routes and Stations

Main line

Kolkata Chord Link line
 Chord Main line 
Sealdah metro
Sealdah Main
Sealdah South
to Namkhana  SDAH-NMKA Main 
Circular Canal
Narkeldanga Shed
Kankurgachi Road
Kankurgachi Road Cabin
Bidhannagar Road
Keshtopur Canal
Bidhannnagar Road
to Majerhat  DDJ-MJT Circular 
Jessore Road
to Kavi Subhash
Dum Dum Road
Dum Dum metro(left)
Dum Dum Jn. (right)
to Bangaon Jn.  SDAH-BNJ Main 
Keshtopur Canal
Noapara
to Ranaghat Jn.  SDAH-RHA Main 
Belghoria Expressway
B.T. Road
Dakshineshwar
PWD Road
 Hooghly River 
Bally Ghat
PWD Road
Belghoria Expressway
to Howrah  HWH-BWN Chord 
Bally Halt
Belanagar (left)
Rajchandrapur (right)
to Andul  SDAH-DKAE Branch 
Dankuni Electric Loco Factory
Dankuni Jn.
 Chord Main line Branch 
Dankuni Jn.
Rajchandrapur
to Sealdah  SDAH-DKAE Chord 
Bhattanagar
Benaras Road
to Amta  SRC-AMZ Branch 
Baltikuri Cabin
Bankra Nayabaz
Kona Expressway
to Howrah  HWH-MDN Main 
Maurigram
Andul
Chord link line
# Distance from Sealdah (km) Station Name Station Code Connections
10SealdahSDAHEastern line / South lines
24Bidhannnagar RoadBNXREastern line / Circular line
37Dum Dum JunctionDDJEastern line / Circular line
412BaranagarBARNNone
513DakshineswarDAKENone
615Bally GhatBLYGNone
716Bally HaltBLYHNone
817RajchandrapurRCDNone
922Dankuni JunctionDKAEEastern line

Main line Branch

Chord link line Branch
# Station Name Station Code Connections
1Dankuni JunctionDKAEEastern line
2RajchandrapurRCDEastern line
3BhattanagarBTNGNone
4BankranayabazBKNMSouth Eastern line
5AndulADLSouth Eastern line

Future Development

Recently there is Doubling work of Dakuni - Andul (Additional Kolkata Chord link) line is going on to introduce more passenger train. If doubling work completes, a lot of trains would start from Sealdah or Chitpur Kolkata Terminal by which passengers of Kolkata would get convenience. It will alleviate pressure on Howrah. Besides Sealdah will get direct EMU train towards Kharagpur South Eastern mainline section.[3]

gollark: Also, unable to use search engines somehow.
gollark: I think the nice thing about Linuxen is that once you know some things the rest comes reasonably easily from there; unlike with Windows, where you can do the basic stuff easily but struggle to do complex things.
gollark: Probably mount configs, I think.
gollark: I mean, I think you can muck around with some option somewhere to not require chmod +x (or 755 or whatever), but you probably shouldn't.
gollark: If someone doesn't know the all the arcane lore of Windows, not their fault.

References

  1. Electrifiaction of Railways, irfca.org, 10 December 2018
  2. Introduction of Sealdah Puri Duronto Express, East Coast Railway,
  3. New Projects of Eastern Railway, Eastern Railway, 10 December 2018
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.