Chengzhui line

The Chengzhui line (Chinese: 成追線; pinyin: Chéngzhuī Xiàn) is a line of the Taiwan Railways Administration connecting the Taichung line at Chenggong station to the West Coast line at Zhuifen station, forming a wye. It is currently a single-track railway. As part of the "Greater Taichung Yamanote Line" plan by the Ministry of Transportation and Communication, the line is currently being upgraded to a double-track to allow for increased traffic between downtown Taichung and its coastal towns. The construction was completed in 2020.[1][2][3]

Chengzhui Line
Overview
Native name成追線
TerminiChenggong
Zhuifen
Stations2
Operation
Opened11 October 1922 (1922-10-11)
OwnerTaiwan Railways Administration
Technical
Line length2.2 km (1.4 mi)
Track gauge1,067 mm (3 ft 6 in)
ElectrificationEntire line, 25 kV

Currently, only local services run through the Chengzhui Line.[4]

Stations

NameChineseTaiwaneseHakkaTransfers and NotesLocation
Chenggong成功Sêng-kongSṳ̀n-kûng Taichung line WuriTaichung City
Zhuifen追分Tui-hunTûi-fûn West Coast line Dadu
gollark: No. The error is bad. It should use ANY MEANS NECESSARY to obtain the site's content.
gollark: Errors imply you made a mistake. Thus, removing errors makes your program mistakeless and perfect.
gollark: Æ.
gollark: See? osmarksmalloc™ *would not* have this issue.
gollark: (To lyric)

References

  1. "成功到追分鐵路雙軌化 中央全數補助". 自由時報. Retrieved 7 January 2019.
  2. "破除謠言 中市府:山手線已動工、成追線雙軌明年完成". 新頭殼. Retrieved 7 January 2019.
  3. "台鐵成追線雙軌化 首航列車明10:20成功站開出". 自由時報. Retrieved 2 January 2020.
  4. "成追線火車時刻表". 臺灣鐵路管理局. Retrieved 7 January 2019.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.