Cantonment MRT station

Cantonment MRT station is a future underground Mass Rapid Transit (MRT) station on the Circle line, situated in Bukit Merah planning area, Singapore. This station is part of Stage 6 of the Circle line which will "close the circle" between HarbourFront MRT station and Marina Bay MRT station and it will be located along Everton Road near the junction of Spottiswoode Park Road.

 CC31 
Cantonment
广东民
கெண்டொன்மன்
Cantonment
Mass Rapid Transit (MRT) station
Location100 Everton Road
Singapore 089395
Coordinates1.272814°N 103.836659°E / 1.272814; 103.836659
Operated bySMRT Trains Ltd (SMRT Corporation)
Line(s)
Platforms2 (1 island platform)
Tracks2
ConnectionsBus, Taxi
Construction
Structure typeUnderground
Platform levels1
ParkingYes
Bicycle facilitiesYes
Disabled accessYes
History
Opening2025 (2025)
ElectrifiedYes
Previous namesOld Railway Station, Spottiswoode Park[1]
Services
Preceding station   Mass Rapid Transit   Following station
clockwise / outer
Circle Line
Future service
anticlockwise / inner
Location
Cantonment
Cantonment station in Singapore

Cantonment station will be built underneath the historic Tanjong Pagar railway station which ceased operations on 1 July 2011.[2] Once construction is completed in 2025, this station will provide MRT access to the future Greater Southern Waterfront development.

History

External image
Artist impression of Cantonment station Source: LTA

The station was first announced on 29 October 2015 as part of the Stage 6 of the Circle line.[3]

The Contract 883 for the construction of Cantonment station was awarded to China State Construction Engineering Corporation Limited (Singapore Branch) at a sum of S$205 million in November 2017. Construction began in 2017, with completion in 2025.[4][5][6]

As of March 2018, the Land Transport Authority (LTA) has temporarily dismantled part of the platforms in Tanjong Pagar railway station to make way for the construction of Cantonment MRT station.[7][8]

References

  1. "LTA | News Room | News Releases | Vote for Names of Circle Line 6 Stations". www.lta.gov.sg. Retrieved 15 July 2020.
  2. "Closing the loop on Circle Line in 2025 with 3 new stations: Keppel, Cantonment, Prince Edward, Transport News & Top Stories - The Straits Times". web.archive.org. 20 September 2019. Archived from the original on 20 September 2019. Retrieved 20 September 2019.
  3. "Joint Release by the Land Transport Authority (LTA) & SLA - Circle Line 6 – Becoming A Full Circle | Press Room | Land Transport Authority". 20 September 2019. Archived from the original on 20 September 2019. Retrieved 20 September 2019.
  4. "Circle Line's Cantonment MRT station contract goes to China State Construction for $205m, Transport News & Top Stories - The Straits Times". 20 September 2019. Archived from the original on 20 September 2019. Retrieved 20 September 2019.
  5. "LTA Awards Final Construction Contract for Circle Line 6 | Press Room | Land Transport Authority". 20 September 2019. Archived from the original on 20 September 2019. Retrieved 20 September 2019.
  6. "Circle Line 6". Archived from the original on 20 September 2019. Retrieved 20 September 2019.
  7. "With final 3 stations, Circle Line will come 'full circle' by 2025". Channel NewsAsia. 29 October 2015. Archived from the original on 9 August 2016. Retrieved 15 September 2016.