Busan Metro Line 1

Busan Metro Line 1 is the north-south route of the Busan Metro. It is 40.4 kilometres (25.1 mi) long with 40 stations, and is considered the second longest line of the Busan Metro system, just behind Line 2. But with Line 1 going to regions such as Jagalchi Station, Busan Station, Seomyeon Station, Dongnae Station, and Nopo Station, it is deemed as the most popular line of all of the Busan Metro system. Line 1 uses 8-car trains. The line color is orange.

Line 1
The 45th subway train for Line 1 (Train no. 1045) bound for Nopo Station
Overview
Native name1호선(1號線)
Il Hoseon
TypeRapid transit
SystemBusan Metro
StatusOperational
TerminiDadaepo Beach
Nopo
Stations40
Services1
Operation
OpenedJuly 19, 1985
Operator(s)Busan Transportation Corporation
Rolling stockHyundai Seiko / Korean Shipbuilding BTC Class 1000 (based on design by Nippon Sharyo)
Technical
Line length40.5 km (25.2 mi)
Number of tracks2
Track gauge1,435 mm (4 ft 8 12 in)

History

Plans to create this line began in 1979. In 2009, Busan Transportation Corporation planned to complete the fifth section extension of the metro line by late 2013, but later on postponed it to November 2016.[1][2]

1980s

  • June 13, 1981: Constructed the first section from Beomnaegol Station (118) to Nopo Station (134).
  • July 28, 1983: Constructed the second section from Jungang Station (112) to Beomnaegol Station (118).
  • August 14, 1984: Constructed the third section from Seodaesin Station (107) to Jungang Station (112).
  • July 19, 1985: Opened the first section service from Beomnaegol Station (118) to Beomeosa Station (133).
  • December 19, 1986 : Opened the first section service for Nopo Station (134).
  • May 15, 1987: Opened the second section service from Jungang Station (112) to Beomnaegol Station (118).
  • May 19, 1988: Opened the third section service from Toseong Station (109) to Jungang Station (112).

1990s

  • February 28, 1990: Opened the third section service from Seodaesin Station (107) to Toseong Station (109).
  • July 24, 1990: Constructed the fourth section from Sinpyeong Station (101) to Seodaesin Station (107).
  • June 23, 1994: Opened the fourth section from Sinpyeong Station (101) to Seodaesin Station (107).

2000s

  • November 20, 2009: Began construction for the fifth section from Dadae Station to Sinpyeong Station (101).

2010s

  • February 24, 2010: Seodaesin (107), Dongdaesin (108), Toseong (109), Nampo (111), Jungang (112), Choryang (114), Jwacheon (116), Beomil (117), Bujeon (120), Yeonsan (123), Myeongnyun (126), Jangjeon (129), Guseo (130), Namsan (132), and (134) Nopo stations were renamed by removing the 'dong' at the end.
  • April 20, 2017: Opened the fifth section service from Dadaepo Beach Station (095) to Sinpyeong Station (101).

Hours of operation

The hours of operation of Line 1 start at 5:05 for the ride from Sinpyeong to Nopo at Sinpyeong Station and 5:10 for Nopo to Sinpyeong at Nopo Station. The hours end with the last trains arriving in Sinpyeong at 00:35 and Nopo at 00:30. A ride through the entire line takes about 1 hour 2 minutes.

List of stations

Station
Number
Station name Transfer Distance
in km
Total
distance
Location
English Hangul Hanja
095 Dadaepo Beach
(Morundae)
다대포해수욕장
(몰운대)
海水浴場
()
- 0.0 Busan Saha
096 Dadaepo Harbor 다대포항 1.6 1.6
097 Natgae 낫개낫개 1.3 2.9
098 Sinjangrim 신장림 0.8 3.7
099 Jangrim 장림 1.1 4.8
100 Dongmae 동매동매 1.5 6.3
101 Sinpyeong 신평 1.6 7.9
102 Hadan 하단 1.6 9.5
103 Dangni 당리
(사하구청)
0.8 10.3
104 Saha 사하 0.9 11.2
105 Goejeong 괴정 0.9 12.1
106 Daeti 대티
(동주대학)
0.8 12.9
107 Seodaesin 서대신西 1.4 14.3 Seo
108 Dongdaesin 동대신 0.7 15.0
109 Toseong 토성 1.2 16.2
110 Jagalchi 자갈치자갈치 1.0 17.2 Jung
111 Nampo 남포 0.7 17.9
112 Jungang 중앙
(그린손해보험)
0.9 18.8
113 Busan Station 부산역 Gyeongbu
Gyeongbu HSR
Saemaeul-ho services
Mugunghwa-ho services
1.1 19.9 Dong
114 Choryang 초량 0.8 20.7
115 Busanjin 부산진 Saemaeul-ho services
Mugunghwa-ho services
0.8 21.5
116 Jwacheon 좌천
(일산기독병원)
1.0 22.5
117 Beomil 범일 0.9 23.4
118 Beomnaegol 범내골범내골 0.8 24.2 Busanjin
119 Seomyeon 서면西 1.2 25.4
120 Bujeon 부전  Donghae 
Saemaeul-ho services
Mugunghwa-ho services
0.6 26.0
121 Yangjeong 양정
(동의과학대학·부산여자대학)
1.4 27.4
122 City Hall 시청
(연제)
0.8 28.2 Yeonje
123 Yeonsan 연산 0.9 29.1
124 Busan Nat'l Univ. of Edu 교대  Donghae  1.0 30.1
125 Dongnae 동래 1.2 31.3 Dongnae
126 Myeongnyun 명륜 0.8 32.1
127 Oncheonjang 온천장
(우리들병원)
1.0 33.1
128 Pusan Nat'l Univ. 부산대 1.1 34.2 Geumjeong
129 Jangjeon 장전
(부산가톨릭대학교)
1.0 35.2
130 Guseo 구서 1.1 36.3
131 Dusil 두실 1.0 37.3
132 Namsan 남산 1.0 38.3
133 Beomeosa 범어사 0.9 39.2
134 Nopo 노포
(종합버스터미널)
1.2 40.4

References

  1. "건설완료". 부산교통공사 (in Korean).
  2. "건설진행". 부산교통공사 (in Korean).
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.