Bakreshwar Thermal Power Station

Bakreshwar Thermal Power Station of West Bengal Power Development Corporation Limited is a power station with an installed capacity of 1050 MW (5x210 MW) and it is proposed for capacity expansion of another 500 MW.

Bakreshwar
Thermal Power Station
CountryIndia
LocationChinpai and Bhurkuna gram panchayats, Birbhum district, West Bengal
Coordinates23°50′00″N 87°27′00″E
StatusOperational
Commission date1999
Owner(s)West Bengal Power Development Corporation Limited
Operator(s)
Power generation
Units operational5 x 210 MW
Nameplate capacity1,050 MW

Location

Bakreshwar Thermal Power Station is located at 23°50′N 87°27′E in Chinpai and Bhurkuna gram panchayat areas of Birbhum district in the Indian state of West Bengal.[1] It is located off the Panagarh–Morgram Highway, on the bank of Bakreshwar River some distance downstream from the hot springs and temple at Bakreshwar. Chinpai railway station on the Andal-Sainthia Branch Line and Bakreswar Thermal Power Plant Township are located nearby.

Capacity

Five units of 210 MW each were commissioned in 1999, 2001, 2008 and 2010.[2][3] For the first three units Japan Bank for International Cooperation gave a loan of 80.8 million yen or around Rs. 25.25 billion.[1] The first unit was completed in a record time of 37 months and commissioned on 17 July 1999. The yardstick of Central Electricity Authority for construction of power units of 200250 MW is 48 months.[1]

Bakreshwar power project stage II involves installation of two units of 210 mW each at an estimated cost of Rs 20 billion.[4]

Neel Nirjan

The reservoir formed by erecting a dam in Bakreshwar River named Neel Nirjan (meaning blue solitude), for providing water to the thermal power plant, is gaining in popularity as a tourist spot.[5]

Political imbroglio

Bakreshwar Thermal Power Station was embroiled in political tussle for many years. It was initially proposed to be set up with central assistance but central funding was not forthcoming, in spite of the best efforts of the West Bengal leadership. Once the Left Front formed its government in 1977, Bakreshwar was in deeper political trouble. The delays over providing central funds for the project were cited by the Marxist leaders as another instance of the Centre’s "step-motherly" attitude to West Bengal. For several years, the Bakreshwar project was held up because the Soviet Union was requested to provide financial assistance. The Soviet funds never came even after several years of wait and negotiations. It was finally built by the state government.[3]

gollark: ???
gollark: Maybe make it `rand % 16` or something so it'll only have an effect rarely, for extra confusion.
gollark: And yet its type system is a thin layer on top of the JS one.
gollark: ... is this using JS's type system?
gollark: Why did you use some lambda-based thing instead of booleans?

See also

References

  1. Sarajit Pramanick, Birbhumer Ahankar:Bakreshwar Tapbidyut Kendra, Paschim Banga, Birbhum special issue, pp. 189192, (in Bengali), February 2006, Information and Culture Department, Government of West Bengal
  2. "West Bengal Power Development Corporation Limited". Archived from the original on 10 April 2009. Retrieved 10 April 2009.
  3. Bhattacharya, AK. "Bakreshwar, Haldia and Singur". Business Standard, 24 September 2008. Retrieved 10 April 2009.
  4. "Bakreshwar unit-V may be put off". Archived from the original on 30 January 2010. Retrieved 10 April 2009.
  5. Sarkar, Joydeep, Paryatan Boichitre Birbhum Jela, Paschim Banga, p. 200
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.