Antelope Valley Solar Ranch

The Antelope Valley Solar Ranch 1 (AVSR1) is a 230 megawatt (MWAC) photovoltaic power plant near Lancaster within Antelope Valley, in the western Mojave Desert, Southern California. It uses cadmium telluride modules made by the US thin-film manufacturer First Solar. The project was developed by First Solar and later bought by Exelon Corporation in 2011. The solar facility was fully commissioned in April 2014. [3] [4] [5]

Antelope Valley Solar Ranch
CountryUnited States
LocationAntelope Valley, California
Coordinates34°46′30″N 118°25′30″W
StatusOperational
Construction beganAugust 2011
Commission dateApril 2014 [1]
Construction cost$1.36 billion[2]
Owner(s)Exelon
Solar farm
TypeFlat-panel PV
Site area2,100 acres (8.50 km2)
Power generation
Units operational3,800,000
Nameplate capacity230 MWAC
Capacity factor30.5% (average 2015-2017)
Annual net output614 GW·h, 290 MW·h/acre

Overview

In September 2011, the U.S. Department of Energy issued a $646 million loan guarantee to support the project's construction.[1] This loan guarantee was part of the American Recovery and Reinvestment Act of 2009.[6] The project is expected to create 350 construction jobs and 20 permanent jobs.[1]

On February 20, 2013, the first 100 MWAC came online.[7] The plant will use approximately 3.8 million solar panels,[5] about 20% of which will be mounted on single-axis tracking racks.[1] When fully operational, the plant is expected to generate enough energy for 75,000 homes, displacing 140,000 tons of CO2.[7] The power generated by AVSR1 is being purchased by Pacific Gas and Electric Company (PG&E) under a 25-year Power Purchase Agreement.[1][7]

Electricity Production

Generation (MW·h) of AV Solar Ranch One [8]
YearJanFebMarAprMayJunJulAugSepOctNovDecTotal
2014 60,93356,92952,59342,93330,309 243,697
2015 37,01844,00554,69558,28062,28357,80861,72461,79053,92747,61443,42636,838 619,408
2016 32,93546,20853,43655,09762,37561,86864,53561,77056,08146,49141,61431,884 614,294
2017 32,47035,96454,11255,95961,98061,83960,94458,50055,39853,00539,89337,885 607,949
2018 36,27944,37948,60457,76463,41461,89158,38559,40655,42048,90638,40533,382 606,235
2019 29,88935,096---------- -
Average Annual Production (2015-2018)612,000
gollark: *But* he made Go, which is a cosmic crime.
gollark: The most I know about OS dev is mostly just some small amounts about Linux internals, some stuff about how CPUs work and assembly, and random stuff I shoved into potatOS, personally.
gollark: There's the trusting trust thing too.
gollark: See, he's quite cool.
gollark: They said stupid things like "no syntax highlighting" and designed much of go.

See also

References

  1. "Exelon (Antelope Valley Solar Ranch)". US Department of Energy (DOE). Retrieved 3 July 2014.
  2. "First Solar shares jump after Antelope Valley construction OKd". Los Angeles Times. Retrieved 3 July 2014.
  3. GreenTechMedia.com, Herman K. Trabish, First Solar Cleared to Resume Construction in Antelope Valley, 19 May 2013
  4. GreenTechMedia.com, Herman K. Trabish, Antelope Valley Solar Ranch One: The Solar Power Plant That Could, 5 March 2012
  5. "Antelope Valley Solar Ranch One". Exelon. Retrieved 3 July 2014.
  6. "American Recovery and Reinvestment Act (ARRA) Loans - Award Summary: AV Solar Ranch 1, LLC". Recovery.gov. The Recovery Accountability and Transparency Board. Archived from the original on 14 July 2014. Retrieved 3 July 2014.
  7. "AV Solar Ranch One Solar Power Plant Achieves 100 MW Milestone". First Solar. Archived from the original on 12 July 2014. Retrieved 3 July 2014.
  8. "AV Solar Ranch One, Monthly". Electricity Data Browser. Energy Information Administration. Retrieved May 23, 2019.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.