AIDAmar

AIDAmar is a Sphinx class cruise ship, built at Meyer Werft for AIDA Cruises. She is the sixth Sphinx series ship, preceded by sisters AIDAdiva, AIDAbella, AIDAluna, AIDAblu, AIDAsol and followed by AIDAstella. AIDAmar was delivered to the shipping company by Meyer Werft on 3 May 2012.[3]

AIDAmar at Hamburg Cruise Center Altona, 2015.
History
Italy
Name: AIDAmar
Owner: Costa Crociere S.p.A.[1]
Operator: AIDA Cruises
Port of registry: Genoa,  Italy
Ordered: 19 December 2007
Builder: Meyer Werft
Yard number: S.690
Laid down: 20 October 2008[1]
Launched: 1 April 2012[1]
Completed: 3 May 2012[1]
Identification:
Status: In service
General characteristics [1]
Class and type: Sphinx-class cruise ship
Tonnage:
Length: 253.22 m (830.77 ft)
Beam: 32.2 m (105.64 ft)
Draught: 7.3 m (23.95 ft)
Installed power: 36,000 kW (combined)[2]
Propulsion:
  • Diesel-electric; two shafts (2 × 12,500 kW)
  • Fixed-pitch propellers
  • Two bow thrusters
  • Two stern thrusters
Speed: 21 knots (39 km/h; 24 mph)
Capacity: 2,686
Crew: 620

AIDAmar was christened in Hamburg on May 12, 2012.[4]

Concept and Construction

AIDAmar during construction.

AIDAmar was ordered on 13 December 2007, together with AIDAsol, at Meyer Werft by Carnival Corporation & plc, the parent company of AIDA.[5]

On 1 April 2012 AIDAmar was floated to Meyer Werft in Papenburg. Fifth in a series of six ships ordered by the German company AIDA Cruises, the ship measuring 252 meters long and 32.2 meters wide. Displaying a gauge 71,300 tons, it has 1,096 cabins. Facilities included are an additional deck, an onboard brewery and a 2,300-m spa facility. The AIDAmar is a sistership of AIDAblu and AIDAsol, delivered in 2010 and 2011 respectively. These ships are slightly larger than the first three series units, the AIDAdiva, AIDAbella and AIDAluna (68,500 tons, 1,025 cabins), completed in 2007, 2008 and 2009 by Meyer Werft. After leaving the hall building covered in Papenburg, the AIDAmar went down the river Ems in mid-April to reach the North Sea and to conduct its tests before its release in May of the same year. The last ship of the class Sphinx, the AIDAstella, was delivered by Meyer Werft in late 2013.[6]

gollark: Real programmers travel back in time to the start of the universe and alter its initial conditions such that a program they want is simply created later.
gollark: ```mrustc works by compiling assumed-valid rust code (i.e. without borrow checking) into a high-level assembly (currently using C, but LLVM/cretonne or even direct machine code could work) and getting an external code generator to turn that into optimised machine code. This works because the borrow checker doesn't have any impact on the generated code, just in checking that the code would be valid.```
gollark: Mostly designed to stop trusting trust attacks and allow porting, but it could work.
gollark: https://github.com/thepowersgang/mrustc
gollark: There's a Rust→© compiler.

References

  1. "Aidamar (114576)". DNV GL Vessel Register. Germanischer Lloyd. Retrieved 11 May 2013.
  2. AIDAmar. Meyer Werft. Retrieved 2013-05-11.
  3. M/S AIDAmar, Fakta om fartyg (in Swedish)
  4. "Germany: AIDAmar Christening to Take Place at Hamburg Port Anniversary". World Maritime News. Retrieved 12 February 2018.
  5. CARNIVAL CORPORATION & PLC ORDERS TWO NEW 71,000-TON CRUISE SHIPS FOR AIDA CRUISES BRAND; INCREASES CAPACITY OF A PREVIOUSLY ORDERED VESSEL (PDF). Meyerwerft website. 13 December 2007. Retrieved 9 May 2010
  6. http://www.meretmarine.com/article.cfm?id=119187. Retrieved 28 March 2012

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.