A6182 road

The A6182 is a dual carriageway in Doncaster that runs west and north from Doncaster Sheffield Airport to junction 3 of the M18 and then on to Doncaster town centre.

A6182
White Rose Way towards Doncaster
Route information
Length4.9 mi[1] (7.9 km)
Major junctions
South endA638 road
  M18
A18
A638
North endDoncaster
Location
Primary
destinations
Rossington, Doncaster
Road network

The road is named "White Rose Way" north of the M18, and "Great Yorkshire Way" south of the M18.

The road's purpose is to link the town centre with the M18, from which drivers can reach the A1 and M1, and Doncaster Sheffield Airport.

21st century extensions

Underpass for the new road near Rossington under construction (2015)

The upgrade of the part of the road from Lakeside Village Outlet to the M18 to dual carriageway was completed in June 2013.

Great Yorkshire Way

The Great Yorkshire Way (formerly Finningley and Rossington Regeneration Route Scheme (FARRRS)) is a new road scheme[2] running between the M18 at Junction 3 and Doncaster Sheffield Airport, improving access primarily to the airport, Rossington and the new Doncaster iPort. Work started in 2013 and the first phase of the road between M18 junction 3 and the A638 road became operational in February 2016.[3] Work on the second and final phase connecting the A638 and the airport began in June 2017[4] and was completed in June 2018.[5]

Industrial estates

Due to the nature of the road, a large number of industrial estates line the A6182, as well as the Lakeside Village and the main Royal Mail sorting office for Doncaster and most of East Yorkshire. British Telecom, Royal Bank of Scotland, Tesco Insurance and Direct Line possess large call centres situated just off the road. There is a new iPort near Rossington.

gollark: I thought it was +-30 million.
gollark: It should just use doubles everywhere.
gollark: Floating Point Uncertainty Principle.
gollark: Minecraft runs on quantum physics, clearly.
gollark: I'm sure the farlands have been patched for ages anyway.

References

  1. "Directions to White Rose Way/A6182". Google Maps. Google. Retrieved 4 May 2013.
  2. "Work on £56m Doncaster road project complete | Highways Magazine: Industry News, Services, Conferences and Exhibitions". highwaysmagazine.co.uk. 18 March 2016. Archived from the original on 23 September 2017. Retrieved 23 December 2018.
  3. "New £56m Robin Hood Airport to M18 link road opens". BBC News. Retrieved 23 December 2018.
  4. "Work starts on second phase of Great Yorkshire Way link road to Doncaster Airport". Doncaster Free Express. Doncaster Free Express. Retrieved 23 December 2018.
  5. "Second phase of 'hugely significant' Great Yorkshire Way in Doncaster completed". BDaily News. BDaily News. Retrieved 23 December 2018.
KML is from Wikidata

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.