Qinghe railway station

Qinghe railway station (Chinese: 清河站; pinyin: Qīnghé zhàn) is a railway station in Beijing. The old station began its construction in 1905 and opened in 1906. The station closed on October 31, 2016, to be rebuilt into a new high-speed railway station on the Beijing-Baotou Passenger-Dedicated Line opened on December 30, 2019.[2]

Qinghe[note 1]

清河

New Qinghe railway station (Dec 2019)
LocationQinghe Subdistrict, Haidian District, Beijing
Operated by Tongzhou Train Operation Depot, China Railway Beijing Group
Beijing Subway
Line(s)
Platforms4 island platforms (China Railway)
1 island platform (Line 13 of Beijing Subway)
Construction
Structure typeElevated (railway)
Other information
Station code12707 (TMIS)
QIP (telegram)
QHE (pinyin)
History
Opened
Closed31 October 2016 (2016-10-31) (old railway station)
Traffic
Passengers16 million per year (estimated)[1]
Services
Preceding station China Railway Following station
Beijing North
Terminus
Beijing–Zhangjiakou intercity railway Shahe
Preceding station Beijing Suburban Railway Following station
Terminus Huairou–Miyun line Changping North
towards Gubeikou

The new station occupies an area of 146,000 m2 (1,570,000 sq ft), and the waiting hall is near 23,000 m2 (250,000 sq ft). It has four island platforms and eight railway lines, including two main lines (Screen doors are set on the main line platforms). The station together with Beijing North railway station is the terminal of Beijing–Zhangjiakou intercity railway, which is the vital supporting infrastructure of 2022 Winter Olympics.

Design

AREP collaborated with China Railway Engineering Consulting Group designed this station in 2016.[3] The overall design philosophy is to blend the ancient and the modern, and the sea refuses no rivers. The curved roof and overhang eave represent the ancient style. The angled bents supporting frame and the simple and powerful geometric shape are full of modern technology.[4]

Many cultural elements are used in the station. On the roof, seven west-to-east sloping ridges are like seven ski runs. Equipment rooms in the waiting hall are decorated with mural and relievo reflecting the geographical and cultural features of Beijing.[4]

Structure

Old station building built in 1906, preserved on the southeast of the current station

The station has total five floors, three overground and two underground.[5]

B2 floor is the subway platform floor for      Changping line and      Line 19 branch line.

B1 floor is the transfer floor, on which are the railway exit 1-2 and underground railway entrance, railway integrated service center 1, railway automatic ticketing area 1-2, the Suburban Railway entrance and exit, the subway hall (subway entrance, exit and service center), parking area, passageway to East and West Plaza.

As a feature of this station, the security checks of different transportations are mutual recognized. Passengers do not need to take repetitive security checks when transfer among subway, railway and suburban railway.[5]

F1 (Ground Floor) is the railway platform floor with east and west plazas. East Plaza links to Anningzhuang 2nd West Tiao Road and north public transportation hubs (PTH). West Plaza has railway entrance 1, railway automatic ticketing area 3-4, west PTH, taxi stand, and links to Shangdi East Road.

F2 is the railway waiting hall floor with north and south elevated drop-off platforms. In the waiting hall, there are check-in gate 1-8A/B, 12306 service center, and four characteristic waiting areas (military waiting area, children playing area, business travel leisure area, and multi-function service area). On the north drop-off platform, there are drop-off area, railway entrance 3, railway integrated service center 3, railway automatic ticketing area 6, and business waiting room 2, and links to Anningzhuang North Road. On the south drop-off platform, there are drop-off area, railway entrance 2, railway integrated service center 2, railway automatic ticketing area 5, business waiting room 1, and links to G7.

F3 is the shopping floor. Some specialties shops and restaurants are on F3.

3F Mezzanine Shops, Restaurants
2F North Drop off area (Not open) Drop-off area, railway entrance 3, railway integarated service center 3, railway automatic ticketing area 6, business waiting room 2, links to Anningzhuang North Road.
Waiting hall Gates 1-8A/B, 12306 service center
South drop off area (Not open) Railway entrance 2, railway integarated service center 2, railway automatic ticketing area 5, business waiting room 1, and links to G7.
G West plaza Railway entrance 1, railway automatic ticketing area 3-4, west PTH, taxi stand, and links to Shangdi East Road
Westbound      Line 13 towards Xizhimen (Shangdi)
Island platform, doors open on the left
Eastbound      Line 13 towards Dongzhimen (Xi'erqi)
Platform 1 Beijing–Zhangjiakou intercity railway towards Zhangjiakou (Shahe)
Island platform
Platform 2 (with platform screen door) Beijing–Zhangjiakou intercity railway towards Zhangjiakou (Shahe)
Platform 3 Beijing–Zhangjiakou intercity railway towards Zhangjiakou (Shahe)
Island platform
Platform 4 Beijing–Zhangjiakou intercity railway towards Zhangjiakou (Shahe)
Platform 5 Beijing–Zhangjiakou intercity railway towards Beijing North railway station (Terminus)
Island platform
Platform 6 Beijing–Zhangjiakou intercity railway towards Beijing North railway station (Terminus)
Platform 7 (with platform screen door) Beijing–Zhangjiakou intercity railway towards Beijing North railway station (Terminus)
Island platform
Platform 8 Beijing–Zhangjiakou intercity railway towards Beijing North railway station (Terminus)
B1 West plaza Railway integrated service center 1, railway automatic ticketing area 1-2
Exits railway exit 1-2
Subway concourse Faregates, Station Agent
Parking (Not open)
East plaza North Transportation Hub
B2 Subway platform (under construction)      Changping line
     Line 19


Beijing Subway

Qing He

清河
The platform in 2020
LocationQinghe Subdistrict, Haidian District, Beijing
China
Operated byBeijing Mass Transit Railway Operation Corp., Ltd.
Line(s)     Line 13
     Changping line (South extension, under construction)
     Line 19 (branch line, under planning)
Platforms1 island platform (Line 13)
Construction
Structure typeAt-grade (Line 13)
Underground (Changping line & Line 19)
Disabled accessYes
History
OpenedDecember 30, 2019 (Line 13)
2021 (Changping line)
Services
Preceding station   Beijing Subway   Following station
towards Xizhimen
Line 13
towards Dongzhimen
Xiaoying Xilu
towards Jimenqiao
Changping line
under construction
Zhufanglu
towards Xingong
Line 19
branch line
under planning
Terminus

An infill station on Line 13 of Beijing Subway opened on December 30, 2019.[6] The station for Line 13 is at-grade.

The southern extension of Changping line of Beijing Subway will also stop at this station, which will be opened in 2021. The station for Changping line is underground.

In long-term planning, the branch line of the north extension of Line 19 will stop there as well. The station for Line 19 (branch) is underground.[7][8][9]

Exits

    Exit Destination
North Qinghe Station Underpass
South Qinghe Station Underpass
East Station Entrance
West China Railway Station

Name and location


Qinghe station
Qinghe (settlement)
Shangdi station
Shangdi (settlement)
SIIP
Qinghe railway station (central Beijing)

As the subway station Qinghe is named after the homonym railway station without including "railway station" in its proper name (unlike the subway Huangcun railway station), and as the railway naming prefer upper-level administrative divisions, Qinghe is closer to Shangdi station while the Shangdi Information Industry Park (SIIP) is closer to Qinghe station.

See also