Fruitvale Bridge

The Fruitvale Bridge and the Fruitvale Avenue Bridge (the latter officially the Miller-Sweeney Bridge at Fruitvale Avenue) are parallel bridges that cross the Oakland Estuary, linking the cities of Oakland and Alameda in California. The Fruitvale Bridge is a vertical-lift railroad moveable bridge, while the Fruitvale Avenue Bridge is a road bascule bridge that connects Fruitvale Avenue in Oakland with Tilden Avenue in Alameda.

Fruitvale Bridge
Fruitvale Avenue vertical-lift railroad bridge. The Fruitvale Avenue Miller-Sweeney bridge is directly behind the raised span of the railroad bridge.
Coordinates 37°46′08″N 122°13′48″W
Carriesrailroad
CrossesOakland Estuary
LocaleSan Francisco Bay Area
Characteristics
DesignVertical-lift bridge
Materialsteel
Height175 ft (53 m)
Clearance below65 ft (20 m) (raised)
History
Closed2000
Fruitvale Bridge
Location in Oakland, California
Fruitvale Bridge
Fruitvale Bridge (San Francisco Bay Area)
Fruitvale Bridge
Fruitvale Bridge (California)
Fruitvale Avenue Bridge
Partially raised bascule on road bridge, immediately behind rail bridge.
Coordinates 37°46′08″N 122°13′48″W
Carriescars and trucks on Fruitvale (Oakland) and Tilden Avenues (Alameda)
Official nameMiller-Sweeney Bridge
Characteristics
DesignSingle leaf bascule bridge
Materialsteel, concrete
Total length215 ft (66 m)
Width52 ft (16 m) roadway
6 ft 1 in (1.85 m) sidewalks
Clearance below15 ft (4.6 m) (high tide)
21 ft (6.4 m) (low tide)
No. of lanes4
History
DesignerMcCreary-Koretsky International
Constructed byHensel Phelps
Fabrication byKaiser Steel
Statistics
Daily traffic15,300

Rail bridge

The rail bridge is immediately west of the Miller-Sweeney road bridge. The rail bridge connected Fruitvale Avenue in Oakland with Tilden Way in Alameda. It has been out of service since 2000.

History

This lift bridge was constructed in 1951 to replace an earlier bridge that originally served the SP interurban trains from San Francisco (SP's Interurban Electric Railway discontinued service in 1941). From 1951 until September 11, 1996, the Southern Pacific Railroad operated freight service across the bridge to serve shippers in Alameda and to connect with the Alameda Belt Line railroad. After SP was acquired by Union Pacific on September 11, 1996, UP provided infrequent service to Alameda until service was discontinued in 2000.

Design

The right-of-way still exists through the East Bay, however, the tracks on both sides of the bridge have been severed and the span remains raised at 65 feet above water level, except when operated for maintenance and testing. The bridge is owned by the U.S. Army Corps of Engineers and is operated by the County of Alameda. The Miller-Sweeney bridge tender, a county employee, operates the railroad bridge from controls in the Miller-Sweeney control house. The last train across the bridge ran in 2000.

Road bridge

The road bridge is officially named the Miller-Sweeney Bridge at Fruitvale Avenue.[1] It has no overhead steel structure like the other road bridges between Alameda and Oakland (the High Street Bridge and the Park Street Bridge) so tall vehicles should use the Miller-Sweeney Bridge.[1] Miller-Sweeney opens approximately 1,600 times per year to accommodate marine traffic.[1]

History

A bridge at this location initially opened in 1894, initially carrying rail traffic.[1] It was regraded to accommodate road traffic, and the train tracks were removed in 1951 with the completion of the dedicated vertical-lift rail bridge.[1] The present Miller-Sweeney Bridge was completed in 1973 by the US Army Corps of Engineers and turned over to Alameda County in 1975.[1] Miller-Sweeney won a prize bridge award for movable spans from the American Institute of Steel Construction in 1974.[2]

The Miller-Sweeney Bridge was damaged in the 1989 Loma Prieta earthquake and was damaged again in 1991 when a fully loaded barge hit the span.[1]

Design

The Miller-Sweeney Bridge is normally opened by two 75-horsepower (56 kW) motors, which take 66 seconds to fully open the bridge to 79°.[1] The motors typically operate in tandem, drawing electricity from Alameda Municipal Power. Under emergency conditions, a portable generator may be used to power the single backup 5-horsepower (3.7 kW) motor, which takes 20 minutes to fully open the bridge.[1]

References

  1. "Miller-Sweeny [sic] Bridge". Alameda County Public Works Agency. Retrieved 3 May 2017.
  2. "Prize Bridges 1974" (PDF). American Institute of Steel Construction. 1974. pp. 16–17. Retrieved 3 May 2017.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.