Chongming line

The Chongming line (Chinese: 崇明线; pinyin: Chóngmíng xiàn) is a rapid transit line on the Shanghai Metro that is part of the 2018–2023 Shanghai Metro plan.[2] The Chongming line was previously treated as the last phase of Line 9, and was Line 19 until 2016, when it was renamed the Chongming line.

Chongming line
 Chongming 
Overview
TypeRapid transit
StatusPlanned
LocaleShanghai, China
TerminiJinji Road
Yu'an
Stations8
Operation
Rolling stock6-car Type A[1]
Technical
Line length42.8 km
Operating speed120 km/h[1]

The Chongming line will start at Jinji Road in Pudong and end at Yu'an in Chongming District,[3] and will interchange with Lines 9 and 12.[3] It will be 42.8 kilometres (26.6 mi) long, including a 40.7-kilometre (25.3 mi) underground section.

Planned stations

Station names according to an April 2019 planning document.[3]

Station name Connections Distance
km
Location
English Chinese
Jinji Road 金吉路  9 
Shenjiang Road 申江路  12 
Gaobao Road 高宝路
North Lingkong Road 凌空北路
Changxing Island 长兴岛
Chenjia Town 陈家镇
Dongtan 东滩
Yu'an 裕安

References

  1. "上海市轨道交通崇明线工程环境影响评价咨询项目招标公告". 2019-05-27. Archived from the original on 2019-05-27. Retrieved 2019-09-15.
  2. "国家发展改革委关于上海市城市轨道交通第三期建设规划(2018~2023年)的批复". Archived from the original on 2018-12-19. Retrieved 2018-12-19.
  3. "上海市轨道交通崇明线选线专项规划(草案公示)" (PDF). Archived (PDF) from the original on 2019-04-27. Retrieved 2019-04-27.

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.