At the end of 2015 the wind power in Bulgaria had production capacity of 691MW .[1] That capacity generated 1,436 GWh for 2015 which represented 3.23% of the whole power generated in the country for that period. The capacity factor for wind power in Bulgaria in 2015 was about 23.7%. We can get to this number knowing that at the end of 2015 the wind power capacity was 0.6912GW and during 2015 there was no new wind capacity installed. For 8766 hours in one year that capacity could generate 0.6912GW * 8766 = 6059.0592GWh power, but it generated only 1436GWh power which is (1436/ 6059) * 100 = 23.7%

Installed capacity growth

The table shows an annual increase in installed wind power capacity.

Year Nameplate capacity (MW)
2003 10
2004 10
2005 14
2006 36
2007 57
2008 158
2009 177
2010 500
2011 503
2012 674
2013 681
2014 691
2015 [2]691

List of the wind farms in Bulgaria

This is the list of wind farms in Bulgaria at the end of 2015

Ajtos 1,100 kW 3  turbines
Ajtos E 400 kW 1  turbine
Ajtos N 875 kW 4  turbines
Ajtos SW 700 kW 2  turbines
Balchik NE 1,000 kW 4  turbines
Balchik 10,000 kW 5  turbines
Dabovo
Dobric Sth 1,050 kW 3  turbines
Dryankovetz
Elhovo Sth 975 kW 4  turbines
Gulyantsi NE 1,355 kW 3  turbines
Gurkovo 2,000 kW 1  turbine
Hrabrovo 14,000 kW
Hrabrovo 2 3,000 kW 1  turbine
Kaliakra Wind 35,000 kW 35  turbines
Kardam 12,600 kW 6  turbines
Kavarna 134,000 kW 15  turbines
Kavarna E 4,950 kW 7  turbines
Kavarna N 5,000 kW 6  turbines
Kavarna NE 8,500 kW 13  turbines
Kavarna NW 156,000 kW 52  turbines
Kavarna W 14,100 kW 17  turbines
Krapelit 12,000 kW 6  turbines
Krupen 12,000 kW 4  turbines
Milkovitza
Mogilishte 3,000 kW 3  turbines
Mogilishte-Zapad 17,600 kW 10  turbines
Nej|Kovo 4,000 kW 2  turbines
Omurtag 750 kW 1  turbine
Ruen
Shabla N 1,600 kW 2  turbines
Shabla NW 1,990 kW 2  turbines
Shabla S 2,400 kW 3  turbines
Shabla SE 400 kW 1  turbine
Shabla SW 6,100 kW 11  turbines
Shabla W 1,200 kW 3  turbines
Sliven 5,000 kW 6  turbines
Sliven E 1,400 kW 3  turbines
Sliven N 6,850 kW 8  turbines
Somovit 2,500 kW 1  turbine
Straldza Sth 750 kW 3  turbines
Sungurlare
Suvorovo 60,000 kW 30  turbines
Targoviste 500 kW 1  turbine
Vetrocom 72,500 kW 29  turbines
Vranino 18,000 kW 9 turbines
Yambol 400 kW 1  turbine [3]
gollark: [] is function call, essentially.
gollark: It parses things like `Bee[the, apioforms * Apinate[NearbyMuons[]]]`.
gollark: This is desirable. I just don't know how it'd work.
gollark: I mean that the syntax would translate oddly to RPN.
gollark: I could probably implement two parsers, but no.

See also

References

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.