Webuild
Webuild SpA (formerly Salini Impregilo SpA)[2] (Italian pronunciation: [saˈlini impreˈd͡ʒiːlo]) is an Italian industrial group specialised in the construction and civil engineering business headquartered in Milan. The company was formally founded in 2014 as the result of the merger by incorporation of Salini into Impregilo. Salini Impregilo is the largest Italian engineering and general contractor group and a global player in the construction sector.
Società per azioni | |
Traded as | BIT: SAL |
ISIN | IT0003865570 |
Industry | Construction, civil engineering |
Founded | 2014 - 1959 (as Impregilo) |
Headquarters | , Italy |
Key people |
|
Products | Infrastructure and industrial plant construction and engineering; motorway operating concessions |
Revenue | €5,965 million (2018)[1] |
€248 million (2018)[1] | |
€180 million (2018)[1] | |
Number of employees | 35,000 |
Website | www |
The company is active in over 50 countries of 5 continents (Africa, America, Asia, Europe, Oceania) with 35,000 employees. Its experience ranges from the construction of dams, hydroelectric plants and hydraulic structures, water infrastructures and ports, to roads, motorways, railways, metro systems and underground works, to airports, hospitals and public and industrial buildings, to civil engineering for waste-to-energy plants and environmental protection initiatives. It takes first place in the water sector of the Engineering News-Record rankings, the benchmark for the entire construction industry.[3]
The company is listed on the Milan Stock Exchange. It is directed by Pietro Salini.
History
The company was founded as Impregilo in 1959 and expanded following a merger with Cogefar-Impresit S.p.A., Girola S.p.A. and Lodigiani S.p.A. in 1990.[4]
In 2011 Salini, privately held, began its acquisition of Impregilo with an initial purchase of shares, reaching 25% the following year. The acquisition set a precedent in Italy because it was the first proxy fight for control of a company to occur in the country. Despite the opposition it faced from a group of investors, Salini managed to convince enough shareholders at an assembly in July 2012 to approve its proposal to replace Impregilo’s board of directors with its own list of candidates. Once in place, these new members of the board approved Salini’s offer to buy the rest of Impregilo. Pietro Salini became chief executive. A few months later, the board approved Salini’s plan.[5]
In 2013, Salini launched a tender offer to buy the remaining ordinary shares in Impregilo. In January 2014 the transaction was completed forming Salini Impregilo.[6]
On 18 December 2018, Marco Bucci, the mayor of Genoa and commissioner overseeing the reconstruction of the bridge over the Polcevera River announced the selection of Salini Impregilo and Fincantieri Infrastructure, via a new company called PERGENOVA, for the reconstruction of the bridge according to a design by Renzo Piano.[7][8][9]
On 4 May 2020, the company changed his name into "WeBuild".[10]
Operations
The company undertakes the following types of works: dams, hydroelectric power plants, railways, tunnels, undergrounds, bridges, viaducts, highways, roads, ports, airports and prestigious residential and office complexes.[11] The Group operates in more than 50 countries on 5 continents and has 35,000 employees. It is organised into four business areas: Dams, hydroelectric plants and hydraulic works; Motorways and airports; Railways and undergrounds; Civil and industrial buildings.[12]
With more than a century of engineering experience among the two founding companies, Salini and Impregilo, The company's track record includes 257 dams and hydroelectric plants; 6,830 kilometres (4,240 miles) of railway lines; 1,450 kilometres (900 miles) of underground works, 400 of which subway lines; 51,660 kilometres (32,100 miles) of roads and highways; and 350 bridges and viaducts.[13]
Major projects
Projects in which the company has been involved include buildings, public utilities, motorways, underground works, airports, water supply systems, waste disposals, hospitals and land development. Some major examples include:
- the Kariba Dam, Zimbabwe/Zambia, 1959[14]
- the Dez Dam, Iran, 1963[15]
- the Akosombo Dam, Ghana, 1966[16]
- the salvage of the Abu Simbel temples, Egypt, 1968[17]
- the bay of Fontvieille, Monaco, 1973[18]
- the Tarbela Dam, Pakistan, 1976[19]
- the Fréjus Road Tunnel, France/Italy, 1980[20]
- the Trans-Gabon Railway, Gabon, 1982 [21]
- the San Roque González de Santa Cruz Bridge, Argentina/Paraguay, 1990 [22]
- the New Hemicycle of European Parliament, France, 1997[23]
- the Lesotho Highlands Water Project, 1998[24]
- extensions to the Rodovia dos Imigrantes, Brazil, 2002[25]
- the Ghazi Barotha Dam, Pakistan, 2002[26]
- the Nathpa Jhakri Hydroelectric Power Project, India, 2003[27]
- the Sheikh Zayed Mosque, United Arab Emirates, 2003[28]
- the Desalination plant Jebel Ali l1, United Arab Emirates, 2005[29]
- the Kárahnjúkar Hydropower Plant, Iceland, 2008[30]
- the Turin–Milan and Bologna–Florence high-speed railways, Italy, 2009[31]
- the expansion of the Churchill Hospital in Oxford, 2009[32]
- the Grand Ethiopian Renaissance Dam, 2011[33]
- the expansion of the Panama Canal – third set of locks, 2016[34]
- the Cityringen, new subway circular urban line in Copenhagen, 2019[35]
- the Texas Central Railway, due to complete in 2025[36]
- the Rogun Dam, Tajikistan, due to complete in 2025[37]
Salini Impregilo is also working on the Gotthard Base Tunnel. The Group is also leading a consortium for Red Line North, a part of the Doha Metro project in Qatar, which is expected to be completed in 2019.[38]
Corporate Affairs
The Salini Impregilo Board of Directors is as follows:[39]
Position | Name |
---|---|
Vice-Chairman | Nicola Greco |
Chief Executive Officer | Pietro Salini |
Independent Director | Marina Brogi |
Independent Director | Giuseppina Capaldo |
Independent Director | Mario Giuseppe Cattaneo |
Director | Roberto Cera |
Independent Director | Raffaella Leone |
Independent Director | Geert Linnebank |
Independent Director | Giacomo Marazzi |
Independent Director | Ferdinando Parente |
Independent Director | Franco Passacantando |
Deputy Chairperson | Laudomia Pucci |
Director | Grazia Volo |
Director | Alessandro Salini |
See also
References
- "Annual Results 2018". Salini Impregilo S.p.A. Retrieved 15 March 2019.
- "Salini Impregilo". Salini Impregilo. Retrieved 2020-05-04.
- "ENR Classification – Water Sector: The Salini Impregilo Group takes first place".
- Rickard, Carmel (4 September 2006). "Water project trial targets Italian giant". Business Day. Retrieved 14 July 2013.
- "Italian Investors Feud Over Biggest Builder Impregilo". Bloomberg. 12 July 2012. Retrieved 10 August 2016.
- Flak, Agnieszka (12 September 2013). "Impregilo shareholders approve merger with Salini". Reuters. Retrieved 1 March 2014.
- Press, The Associated (2018-12-18). "Genoa Announces $229M Project to Replace Collapsed Bridge". The New York Times. ISSN 0362-4331. Retrieved 2018-12-19.
- "Genoa Bridge - Salini Impregilo". www.salini-impregilo.com. Retrieved 2018-12-19.
- "Fincantieri | SALINI IMPREGILO, FINCANTIERI TO REBUILD GENOA BRIDGE WITH NEW "PERGENOVA" COMPANY". www.fincantieri.com. Retrieved 2018-12-19.
- "Salini Impregilo cambia nome: da oggi nasce Webuild - la Repubblica". Repubblica.it. Retrieved 2020-05-04.
- Projects: works Salini Impregilo
- Projects: expertise Salini Impregilo
- Track Record Salini Impregilo
- Spurwing facts Archived 2009-11-05 at the Wayback Machine
- Ilisu Dam campaign
- VRA honours Italy contractors of Akosombo Kpong dams
- Abu Simbel Archived 2010-01-02 at the Wayback Machine
- Lavori marittimi nella Baia di Fontvieille Archived 2013-10-29 at the Wayback Machine
- Ilisu
- Fréjus, Tir trains: falls on the last alibi for the Turin-Lyon
- Ferrovia transgabonese Archived 2013-10-29 at the Wayback Machine
- Ponte Posadas - encarnacion sul fiume Paranà
- A much discussed chamber
- Corner House
- "Brazil, Serro do Mar - br/18 - Highway". Tunnelbuilder Ltd. Retrieved 23 September 2015.
- Riaa Law
- Nathpa Jhakri Hydroelectric Power Project
- Grand Mosque Abu Dhabi Archived 2010-03-06 at the Wayback Machine
- Financing agreed for Jebel Ali L Power Plant
- Karahnjukar website - Impregilo Archived 2005-06-22 at the National and University Library of Iceland
- Italians set national rail speed record in tunnel
- "Alfred McAlpine JV wins £125m hospital contract". Building. 19 December 2005. Retrieved 30 April 2018.
- "Grand Ethiopian Renaissance Dam Project, Benishangul-Gumuz".]
- "Salini Impregilo CEO outlines solutions to Panama Canal dispute". Reuters. 8 January 2014. Retrieved 3 March 2018.
- "Copenhagen Metro deal for Salini Impregilo". Construction Europe. 29 October 2014. Retrieved 2019-04-16.
- "High Speed Rail Continues its Slow Speed Move Toward Construction | Mobility". coveringkaty.com. 2019-09-14. Retrieved 2019-10-02.
- "Italians Picked for Rogun Dam Contract". Eurasianet. 1 July 2016. Retrieved 3 March 2018.
- "Italian-led group wins $2bn contract to build north Doha Metro line". Doha News. 19 May 2013. Retrieved 13 June 2015.
- "Board of Directors - Salini Impregilo". www.salini-impregilo.com. Retrieved 2018-12-19.