Tunnel hole-through, also called breakthrough, is the time, during the construction of a tunnel built from both ends, when the ends meet,[1] and the accuracy of the survey work becomes evident. Many tunnels report breakthroughs with an error of only a few inches, for example:
- the 1858 Blue Ridge Tunnel – 6 inches (150 mm)
- the 1944 Blue Ridge Tunnel replacement – 4 feet (1.2 m) - 1944
- the Lötschberg Base Tunnel – 10 cm[2]