Tunghsiao Power Plant
The Tunghsiao Power Plant or Tongxiao Power Plant (Chinese: 通霄發電廠; pinyin: Tōngxiāo Fādiànchǎng) is a gas-fired power plant in Tongxiao Township, Miaoli County, Taiwan.[3][4] With the installed capacity of 1,815 MW,[2] the plant is Taiwan's second largest gas-fired power plant after Tatan Power Plant.[5]
Tunghsiao Power Plant | |
---|---|
Official name | 通霄發電廠 |
Country | Republic of China |
Location | Tongxiao, Miaoli, Taiwan |
Coordinates | 24°29′23.7″N 120°40′16″E |
Status | Operational |
Commission date | 28 March 1983 (Unit 1) 30 March 1983 (Unit 2) 31 March 1983 (Unit 3) 22 March 1992 (Unit 4) 1 May 1992 (Unit 5) 30 May 2000 (Unit 6) |
Owner(s) | Taipower[1] |
Operator(s) | Taipower |
Thermal power station | |
Primary fuel | Liquid natural gas |
Secondary fuel | Fuel oil |
Power generation | |
Units operational | 6 |
Nameplate capacity | 2 X 258.5 MW 1 X 246.8 MW 358.0 MW 372.0 MW 321.2 MW[2] |
External links | |
Commons | Related media on Commons |
History
In the early 1960s,Taipower Company (TPC) was decided to set up a power plant in Tongxiao. Initially, Tongxiao Power Plant was fueled with diesel. In 1978, TPC rebuilt the power units with three combined cycle units (the fuel remained diesel, these units also called old #1~#3), they were the first combined cycle units in Taiwan. In 1990, TPC established #4 and #5 units, and #6 (fueled natural gas) was built in 1997. Later, TPC decided to renew old #1~#3 units (3 old units generate 763 MW electricity). The New Combined Cycle units started commercial operation on 27 February 2018 (New #1 Unit), 30 May 2019 (New #2 Unit), and 26 May 2020 (New #3 Unit).[6][7] The new power units are established on the area of removed oil tanks.
On 30 May 2018, power outage occurred at the power plant at 3:12 p.m. due to the tripping of high voltage transmission line. A total of 70,391 households were left without power. The power was then restored at 4:38 p.m.[8]
Technical description
The new power units have the electricity capacity 892.6 MW each (3 new units are 2677.8 MW), and its heat efficiency is 60.7%.
Tunghsiao Power Plant is accessible within walking distance West from Tongxiao Station of Taiwan Railways.
See also
References
- "Gibsin Engineers, Ltd. : Combined-cycle plant - Project name ~: Tunghsiao Combined-cycle" (PDF). Gibsin.com. Retrieved 2013-10-05.
- 各火力發電廠簡介 (in Chinese). Taipower.com.tw. Retrieved 2013-10-05.
- "Reference - gas turbine power plant, Tung Hsiao, Taiwan". Innospin. Retrieved 2013-10-05.
- http://www.taipeitimes.com/News/biz/archives/2015/05/29/2003619385
- "Tunghsiao CCGT Power Plant Taiwan - GEO". Globalenergyobservatory.org. 2010-02-15. Retrieved 2013-10-05.
- "Taiwan Power Company Sustainability Report 2013" (PDF). 20 December 2013. Archived from the original (PDF) on 17 May 2016. Retrieved 2014-08-22.
- Gao, Pat (1 January 2017). "New Energy Model". Taiwan Today. Retrieved 3 March 2017.
- Kuan, Jui-pin; Yen, William (30 May 2018). "Blackout hits more than 70,000 households in Miaoli, Taichung". Focus Taiwan. Retrieved 31 May 2018.
Wikimedia Commons has media related to Tunghsiao Power Plant. |