Tuas Crescent MRT station

Tuas Crescent MRT station is an above-ground Mass Rapid Transit (MRT) station along the East West Line in Tuas, Singapore. This station is named after a road in the vicinity.

 EW31 
Tuas Crescent
大士弯
துவாஸ் கிரசண்ட்
Tuas Crescent
Mass Rapid Transit (MRT) station
View of the platform level of Tuas Crescent station.
Location90 Pioneer Road
Singapore 639608
Coordinates1°19′16.1″N 103°38′56.4″E
Operated bySMRT Trains (SMRT Corporation)
Line(s)
Platforms2 (1 island platform)
Tracks2
ConnectionsBus, Taxi
Construction
Structure typeElevated
Platform levels1
ParkingNo
Bicycle facilitiesYes
Disabled accessYes
History
Opened18 June 2017 (2017-06-18)[1][2]
ElectrifiedYes
Previous namesTuas
Services
Preceding station   Mass Rapid Transit   Following station
towards Pasir Ris
East West Line
towards Tuas Link
Location
Tuas Crescent
Tuas Crescent station in Singapore

History

It was first announced on 11 January 2011 by then-Transport Minister Mr Raymond Lim in a speech while visiting Bedok when new platform screen doors opened there. It was expected to be completed by 2016 and would benefit an estimated 100,000 commuters daily.

According to Lianhe Zaobao, this station and the tracks linking it are built in the middle of a vehicular viaduct, a historical first for Singapore train services.

It has the longest staircase in all stations with 105 steps, and the longest escalator of 17.5m in Singapore's rail network.[3]

The opening of the station was delayed from 2016 to the second quarter of 2017 to make way for the installation of the new signalling system. It entered operations on 18 June 2017. [1][2]

Stations between Gul Circle to Tuas Link were temporary closed between 16 and 19 November 2017 following collision incident happened between Joo Koon and Gul Circle. On 20 November 2017, train service from Gul Circle to Tuas Link was resumed; however, train services between Joo Koon and Gul Circle remained suspended until mid-2018 to facilitate maintenance work on signalling devices. [4]

Tuas Crescent MRT station nearing completion
gollark: `you don't use grammar online you twat` contains grammar, you see.
gollark: this grammar sentence not having?
gollark: the the the word tjwld correct agree I is.
gollark: Aren't the old AMD "heavy machinery"-named ones pretty awful?
gollark: No, they're the same thing, but they make the GPUs into fancy expansion cards and sellotape a few together on the PCB so they have more cores.

References

  1. "Tuas West Extension Opens on 18 June 2017". Land Transport Authority. 27 April 2017.
  2. "Tuas West Extension MRT stations to open Jun 18". Channel NewsAsia. 27 April 2017.
  3. "SMRT". www.facebook.com. Retrieved 2018-01-26.
  4. Tang, Louisa; Ming En, Siau (16 November 2017). "Tuas West Extension suspended until Sun; no service for Joo Koon-Gul Circle for 1 month". Today. Retrieved 18 February 2018.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.