Triangle Expressway
The Triangle Expressway (TriEx) is the first modern toll road built in North Carolina, and one of the first toll roads in the United States built to use only electronic toll collection instead of toll booths. The overall freeway consists of two segments called the Triangle Parkway and the Western Wake Freeway. The six-lane Triangle Parkway extends the pre-existing NC 147 3.5 miles (5.6 km) in Durham County to meet NC 540 in Morrisville in Wake County. The Western Wake Freeway extends the total Triangle Expressway to 18.8 miles (30.3 km) long, extending NC 540 where it continues along to Holly Springs.
Triangle Parkway Western Wake Freeway | |
Triangle Expressway highlighted in red | |
Route information | |
Maintained by NCDOT | |
Length | 18.8 mi[1] (30.3 km) |
Existed | 2011–present |
Component highways |
|
Major junctions | |
South end | |
| |
North end | |
Location | |
Counties | Durham, Wake |
Highway system | |
Description of the project
The money for the project comes from $625 million in bonds and a $387 million loan from the federal government. The North Carolina Turnpike Authority deposited this money on July 29, 2009, and on the same day the agency's executive director David W. Joyner signed contracts to pay $584 million of that money to three companies to build the road over the next 42 months, creating 13,800 jobs.
Triangle Parkway
S. T. Wooten Corp. of Wilson, North Carolina built the 3.4-mile (5.5 km) northern section, an extension of NC 147 called Triangle Parkway, at a cost of $137.5 million, including an electronic toll plaza on I-540. The new road opened for traffic on December 8, 2011 and extends from the previously existing section of NC 147 south from I-40 to an 2.8-mile (4.5 km) section of the Northern Wake Expressway. Completed in 2007, the existing section became part of the toll road August 2, 2012[2][3][4] (originally envisioned as part of I-540, because of rules against tolls on interstate highways, this section is now called NC 540.[5][6] When Research Triangle Park (RTP) was created in the late 1950s, a corridor of land was preserved to be available for the Triangle Parkway's eventual construction. Another $230 million was spent on 525 acres (2.12 km2) of additional right-of-way for the entire road.
Actual tolling of the new section of road began January 3, 2012.[2][7]
Western Wake Freeway
Granite Construction of Watsonville, California, and Archer Western Contractors of Atlanta worked together as Raleigh Durham Roadbuilders to complete the 12.6-mile (20.3 km) Western Wake Freeway at a cost of $446.5 million. This section of the Triangle Expressway, which extends from NC 55 at RTP to NC 55 at Holly Springs, will become part of NC 540.[4] In summer 2009, work began on the freeway.[8] On August 1, 2012, the 6.6-mile (10.6 km) second section from NC 55 to US 64 opened,[3] with the remaining six miles south of US 64 to NC 55 in Holly Springs opening December 20, 2012.[9][10][7][11] Tolls and $25 million a year from the North Carolina legislature will finance the project.[4]
Tolls
The Triangle Expressway is built as an all-electronic toll road with billing by license plate,[4] similar to Maryland's Route 200 (InterCounty Connector, largely opened to traffic in 2011).
Drivers can open an account and use a North Carolina Quick Pass transponder, which results in a lower rate. Other drivers will have their license plates photographed, and they will receive a bill.[4] The expected rates are 15 cents per mile (9.3 ¢/km) for those with transponders, and 24 cents per mile (15 ¢/km) for others.[2][12]
On May 4, 2010, the Turnpike Authority signed a contract with TransCore to provide transponders.[13] Drivers can, however, use their existing accounts; North Carolina becomes the only state to offer this option. 350,000 new transponders are expected to be issued in the first five years.[14] Transponder sales began October 11, 2011.[15] In later years, interoperability was established with the following ETC systems: E-ZPass, Peach Pass and SunPass.
At the time of its opening, residents in the area have complained about the tolls, considering that the new highway is the only toll road in North Carolina, and especially since other large sections of 540 have been completed without tolls. Business people who plan to use the highway, however, claim that the time savings will more than balance out the cost.[16]
Toll rates
As of January 1, 2018, the total trip rate is $3.25 with the North Carolina Quick Pass and $5.00 via bill-by-mail.[17] Listed below is the toll rate breakdown, by gantry:
|
|
History
The "Triangle Parkway" was first proposed in 1958, as part of Research Triangle Park. On February 16, 2005, it was one of four roads selected by the Turnpike Authority to be built as toll roads in North Carolina. The estimated cost was $69 million for 3.2 miles (5.1 km) between Davis Drive and NC 54. An additional $29 million could be spent extending that highway 1.3 miles (2.1 km) to McCrimmon Parkway in Morrisville, whose leaders opposed the idea. The original parkway route, however, had no real opponents.[18]
At the groundbreaking ceremony in 2009, Representative David Price pointed out that using tolls to finance this road "was not our first choice." Instead, area governments concluded the road would have taken 15 more years to complete any other way, so the decision to charge tolls came in 2005.[19] The 12.5-mile (20.1 km) Western Wake Expressway from RTP to Holly Springs had been delayed earlier in the year, and the legislature had increased the number of toll projects allowed from four to nine.[20]
In July 2006, the legislature decided to allow the section of I-540 connecting the Triangle Parkway and Western Wake Expressway to be a toll road if the other two roads were also toll roads, even though the road was already being built.[21]
Federal approval for the use of tolls came in January 2007. The Turnpike Authority asked that the new section of road not be called an Interstate.
Just before the July 2007 opening of the 4.5-mile (7.2 km) I-540 section between I-40 and NC 55, I-540 signs came down, replaced with NC 540 signs. Using the designation NC 540, a decision made in May 2007, was less confusing than giving the road an entirely new number.[6]
The name "Triangle Expressway" became official in May 2007, and turnpike board member Perry R. Safran said the committee also wanted the nickname "TriEx".[22]
On November 14, 2007, the board decided toll booths would not be used,[23] and on June 5, 2008, the State House voted to approve $25 million a year for 39 years for the project. This would cover the difference between expected toll collections and actual costs.[24]
Groundbreaking was held on August 12, 2009 at the west end of Interstate 540 (I-540). "A dozen dignitaries" used shovels painted gold as 150 watched.[19]
On December 8, 2011, the first leg of the Triangle Expressway opened to traffic. Toll collection began January 3, 2012.[2][25]
On August 1, 2012, the second section of the Triangle Expressway, from Research Triangle Park to U.S. 64, opened. Toll collection began the following day.[3]
On December 20, 2012, the section from U.S. 64 to NC 55 in Holly Springs opened with toll collection beginning in January.[9]
Toll rates change almost annually as required by the bond covenant created for the funding of the Expressway. Since its initial rate set at 2012, it has increased in 2013, 2015 and 2016.[26][27]
On January 20, 2017, the expressway was chosen as one of 10 testing locations for driverless cars.[28]
Future
Planned as the next phase of the Triangle Expressway and the final segment of the Raleigh Beltway, the Triangle Expressway Southeast Extension (also known as the Southern and Eastern Wake Freeways) will traverse 30 miles (48 km) linking NC 540 and I-540, just south of Knightdale. Planning for the route started in 2010, but was put on hold on March, 2011 by the enactment of North Carolina Session Law 2011-7 (N.C. S.L. 2011-7). This law stated routes to study "shall not be located north of" the Orange Route, shown on maps for 20 years, potentially impacting wetlands and endangered mollusks.[29][30][31][32] The U.S. Army Corps of Engineers opposed the Orange Route unless other potential routes could be found. A map unveiled August 22, 2012 shows the Lilac Route and the Plum Route, which would result in less environmental impact but would cause the loss of more homes. Planners hoped for a final route by 2014.[33] On December 7, 2012, the Federal Highway Administration and the U.S. Army Corps of Engineers replied to NCDOT saying they could not legally evaluate the Orange Route without comparing it to another route expected to cause less environmental harm. Since there is an impasse between the Federal government and the state regarding the issue, the federal funds for the project have been cut, putting the Southeast Extension on hiatus.[34]
A Draft Environmental Impact Statement released in late 2015 included 17 options, the Red Route included. Construction west of Interstate 40 would start in 2018 or later. The Lilac Route avoided the environmental problems of the Orange Route but like the Red Route would result in many homes being lost, and the Raleigh water treatment plant would also be affected. The Blue Route and Purple Route to the south of the others would cause the loss of even more homes. East of Interstate 40, there was no preferred route, and all of the options had problems.[35]
In June 2018, the federal government approved a 28.4 mile (45.71 km) extension of NC-540 which would complete the southern loop of NC-540 around Raleigh from the current terminus in Holly Springs to the Interstate 540 terminus in Knightdale. The project will be completed in multiple phases and cost approximately $2.24 billion.[36]
A new exit is currently under construction that would provide an intersection at Morrisville Parkway. Anticipated completion of this intersection is late 2019.[37]
Exit list
County | Location | mi[1] | km | Exit | Destinations | Notes |
---|---|---|---|---|---|---|
Wake | Apex | 17.5 | 28.2 | 54 | Signed as exits 54A (west) and 54B (east) and current end of NC 540 | |
16.2 | 26.1 | 55 | Veridea Parkway | |||
| 15.4 | 24.8 | 56 | To Harris Lake; signed as exits 56A (north) and 56B (south) | ||
| 14.5 | 23.3 | 57 | South Salem Street | ||
Apex | 11.7 | 18.8 | 59 | To Jordan Lake; signed as exits 59A (east) and 59B (west) | ||
Cary | 9.0 | 14.5 | 62 | Green Level West Road – Cary | ||
7.0 | 11.3 | 64 | Morrisville Parkway | |||
5.0 | 8.0 | 66 | To USA Baseball; signed as exits 66A (east) and 66B (west) | |||
Morrisville | 3.3 | 5.3 | 67 | NC 147 exit 1 | ||
Route transition from | ||||||
Durham | Research Triangle Park | 1.7 | 2.7 | 2 / 3 | Davis Drive / Hopson Road | Signed exit 2 northbound, exit 3 southbound |
0.0 | 0.0 | 5 | Signed as exit 5A (east) and 5B (west) | |||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
Note – Exit numbers are based on NC 147 or NC 540.
See also
United States portal U.S. Roads portal
References
- Google (December 12, 2012). "Triangle Expressway" (Map). Google Maps. Google. Retrieved December 12, 2012.
- Shrader, Brian (January 3, 2012). "State's first toll road starts collecting Tuesday". Raleigh, NC: WRAL-TV. Retrieved January 3, 2012.
- Siceloff, Bruce (August 2, 2012). "Toll collection starts Thursday on 9 miles of 540 Outer Loop". The News & Observer. Raleigh, NC. Archived from the original on August 3, 2012. Retrieved August 2, 2012.
- Siceloff, Bruce (July 30, 2009). "Turnpike board starts spending for toll road". The News & Observer. Raleigh, NC. Archived from the original on January 30, 2013. Retrieved August 12, 2009.
- "Interstate 540 North Carolina". Interstate Guide. AAroads.com. Retrieved September 8, 2009.
- Siceloff, Bruce (July 4, 2007). "New bit of Outer Loop renamed". The News & Observer. Raleigh, NC.
- Staff (December 8, 2010). "Progress Schedule". North Carolina Turnpike Authority. Archived from the original on May 21, 2010. Retrieved January 11, 2011.
- Siceloff, Bruce (March 30, 2010). "Southern Wake loop's roadwork to start in 2014". The News & Observer. Raleigh, NC. Archived from the original on April 2, 2010. Retrieved March 30, 2010.
- "Triangle Expressway to Open 13 Days Early". NCDOT. Archived from the original on March 21, 2013. Retrieved December 17, 2012.
- Mildwurf, Bruce (December 7, 2011). "Stretch of state's first toll road opens in Triangle". WRAL-TV Stretch of state's first toll road opens in Triangle. Retrieved January 3, 2011.
- Staff. "Triangle Expressway". North Carolina Department of Transportation. Archived from the original on November 23, 2011. Retrieved August 5, 2012.
- Mildwurf, Bruce (March 3, 2011). "Toll road to cost 15 to 24 cents a mile to drive". Raleigh, NC: WRAL-TV. Retrieved March 4, 2011.
- Siceloff, Bruce (May 5, 2010). "Toll road won't stop you to pay". The News & Observer. Raleigh, NC. Archived from the original on September 28, 2012. Retrieved May 21, 2010.
- Siceloff, Bruce (May 7, 2010). "Drivers to have options on tolls". The News & Observer. Raleigh, NC. Archived from the original on September 28, 2012. Retrieved May 21, 2010.
- Murawski, John (October 12, 2011). "Sales begin for toll road devices". The News & Observer. Raleigh, NC. Archived from the original on October 14, 2011. Retrieved October 13, 2011.
- Siceloff, Bruce. "The 540 Outer Loop arrives in western Wake". News & Observer. Archived from the original on July 30, 2012. Retrieved July 29, 2012.
- "Triangle Expressway Toll Schedule" (PDF). June 26, 2018.
- Eisley, Matthew (February 17, 2005). "Old RTP plan revived as toll road". The News & Observer. Raleigh, NC. Archived from the original on January 29, 2013. Retrieved September 8, 2009.
- Siceloff, Bruce (August 13, 2009). "Future rides on toll roads". The News & Observer. Raleigh, NC. Archived from the original on September 8, 2012. Retrieved August 14, 2009.
- Siceloff, Bruce (November 24, 2005). "Tolls proposed to finish loop". The News & Observer. Raleigh, NC. Retrieved September 8, 2009.
- Siceloff, Bruce (August 6, 2006). "I-540 toll plan goes to mayors". The News & Observer. Raleigh, NC. Retrieved September 8, 2009.
- Siceloff, Bruce (May 22, 2007). " 'Turnpike' too gritty, but calling it 'TriEx'?". The News & Observer. Raleigh, NC. Retrieved September 8, 2009.
- Siceloff, Bruce (November 15, 2007). "Booths for tolls tossed". The News & Observer. Raleigh, NC. Archived from the original on September 5, 2012. Retrieved November 8, 2009.
- Siceloff, Bruce (June 8, 2008). "NW Wake toll road gets House nod". The News & Observer. Raleigh, NC. Archived from the original on June 16, 2008. Retrieved September 8, 2009.
- Siceloff, Bruce (December 8, 2011). "State's first modern toll road opens today". The News & Observer. Raleigh, NC. Archived from the original on January 9, 2012. Retrieved December 8, 2011.
- "Triangle Expressway Toll Rate Increase Begins Jan. 1; 14-22 cents increase for traveling whole Expressway" (Press release). North Carolina Department of Transportation. December 30, 2014. Archived from the original on January 6, 2015. Retrieved January 5, 2015.
- "Triangle Expressway tolls to rise Jan. 1". News & Observer. December 11, 2015.
- Campbell, Colin (January 20, 2017). "Driverless cars to be tested on N.C. 540 Triangle Expressway toll road". News & Observer. Retrieved February 2, 2017.
- Siceloff, Bruce; Campbell, Colin (January 4, 2011). "Garner protest may kill one highway route". The News & Observer. Raleigh, NC. Archived from the original on January 7, 2011. Retrieved January 4, 2011.
- Staff. "Triangle Expressway Southeast Extension". North Carolina Department of Transportation. Archived from the original on October 30, 2011. Retrieved November 6, 2011.
- Triangle Expressway Southeast Extension Project Map (PDF) (Map). North Carolina Turnpike Authority. Archived from the original (PDF) on November 23, 2011. Retrieved November 6, 2011.
- Siceloff, Bruce (May 22, 2012). "New TriEx proposals may save Garner from Red Route". The News & Observer. Raleigh, NC. Archived from the original on June 3, 2012. Retrieved May 22, 2012.
- Siceloff, Bruce (August 22, 2012). "Planners try restarting TriEx project in southern Wake". The News & Observer. Raleigh, NC. Archived from the original on August 24, 2012. Retrieved August 22, 2012.
- Siceloff, Bruce (December 12, 2012). "Federal funding cut, state law challenged on NC 540 Red Route". The News & Observer. Raleigh, NC. Archived from the original on December 14, 2012. Retrieved December 12, 2012.
- Siceloff, Bruce (November 9, 2015). "Road Worrier: 540 Loop project offers a choice of colors". The News & Observer. Raleigh, NC. Retrieved December 1, 2015.
- Stradling, Richard. "Feds approve route for NC 540 across southern Wake. Will mussels still stand in its way?". News & Observer. Retrieved 27 June 2018.
- Stradling, Richard. "Work to begin on Morrisville Parkway extension, interchange". News Observer. Retrieved 26 June 2018.