Thailand Cultural Centre MRT station

Thailand Cultural Centre MRT station (Thai: สถานีศูนย์วัฒนธรรมแห่งประเทศไทย, code BL19) is a Bangkok MRT station on the Blue Line. It is located under Ratchadaphisek Road, near Thailand Cultural Centre and Stock Exchange of Thailand and MRT depot. During construction, the station had been named Thian Ruam Mit.

Thailand Cultural Centre

ศูนย์วัฒนธรรมแห่งประเทศไทย
 MRT 
Blue Line platforms
LocationDin Daeng and Huai Khwang, Bangkok, Thailand
Owned byMass Rapid Transit Authority of Thailand (MRTA)
Operated byBangkok Expressway and Metro Public Company Limited (BEM)
Line(s) MRT  MRT Blue Line
Platforms1 island platform
2 side platforms (under construction)
Tracks4 (2 in operation and 2 under construction)
Construction
Structure typeUnderground
Disabled accessYes
Other information
Station codeBL19
History
Opened3 July 2004 (2004-07-03)
Previous namesThian Ruam Mit
Services
Preceding station   Bangkok Metro   Following station
Phra Ram 9
toward Lak Song
MRT Blue Line
Huai Khwang
toward Tha Phra (via Bang Sue)

Station details

The station uses symbol as color blue.[1] It is underground station, widths 27 meters, lengths 358 meters, depths 20 meters, and uses island platform.

There are MetroMall in the station, but not opened yet.

Future

The under-constructed MRT Orange line will interchange with MRT Blue Line at Thailand Cultural Centre station. Orange line will begin at Thailand Cultural Centre station and run eastward to Suwinthawong. In 2020, cabinet approved the extension of Orange line from Thailand Cultural Centre westward to Bang Khun Non.[2]

Major accident record

On 17 January 2005, just after 09:15, an empty train returning to the depot collided with a peak-hour train filled with passengers at the Thailand Cultural Centre station. 140 people were hurt, most of whom sustained only minor injuries, and the entire Metro network was shut down for two weeks.

After initial investigations, it was found that the empty train had run into problems shortly before the accident, grinding to a halt on a curve leading to the depot. The driver applied its brake and was waiting to be towed to the maintenance center close to Thailand Cultural Centre station.

A rescue train was attempting to connect to the stalled train when the driver was told to release the brake while coupling had not yet been successful. It was then that the empty train began to roll backwards at a speed of ten meters per second, before smashing into the other train, which was carrying passengers. Therefore, it was believed that the incident was caused by negligence due to insufficient training of operation staff.[3] This accident also resulted in two damaged trains with heavily damaged areas limited to the two leading cars. The colliding speed was suspected to be about 60 km/h due to the appearance of damaged areas. However, one train, which was rebuilt from the repair of the minor-damaged cars, was already fitted for operation at the end of 2006 and the remaining one was still under heavy repair until mid of 2007; it was put into service in October, 2007. The cost resulting from the accident might be a much higher figure than BMCL quoted, and it was expected to be at least 400 million baht, which was totally insured by a local insurance company.

The Metro resumed full operation on 1 February 2005, and passenger numbers soon rose back to pre-crash levels, partly due to a temporary promotional fare scheme which allowed passengers to travel any distance on the MRT for only ten baht (~0.33 USD).[4]

gollark: We are not a COUNTRY.
gollark: For users who are citizens of the European Union, we will now be requesting permission before initiating organ harvesting. This software uses an army of frogs that throw cookies in the general direction of your computer. By using it, you agree that these frogs may throw cookies.
gollark: We may use your data for various purposes, such as: responding appropriately to user input/commands providing and managing mandatory software updates communication with users, where necessary - for example to provide notifications about upcoming events and product announcements [LEVEL 5 CLEARANCE REQUIRED] anything PotatOS Things are programmed to do entertainment and/or random messing around helping to deliver, create, develop, improve, design, operate, manage, produce, modernize, complicate, nationalize, placate, evolve, alter, amend, change, obliterate, or worsen our products and services anything whatsoever
gollark: We wish to remind all users that regardless of recent rumors, potatOS is not responsible for and not associated with SCP-3125. SCP-3125 must not be interacted with. “██████ Siri” (PS#ABB85797) must not be interacted with.
gollark: THE SOFTWARE IS PROVIDED “AS IS”, WITHOUT WARRANTY OF ANY KIND, EXPRESS OR IMPLIED, INCLUDING BUT NOT LIMITED TO THE WARRANTIES OF MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE AND NONINFRINGEMENT. IN NO EVENT SHALL THE AUTHORS OR COPYRIGHT HOLDERS BE LIABLE FOR ANY CLAIM, DAMAGES OR OTHER LIABILITY, WHETHER IN AN ACTION OF CONTRACT, TORT OR OTHERWISE, ARISING FROM, OUT OF OR IN CONNECTION WITH THE SOFTWARE OR THE USE OR OTHER DEALINGS IN THE SOFTWARE.

References

  1. จุดเริ่มต้นของคนเดินทาง: ดำดินเดินทาง. คอลัมน์นายรอบรู้ นิตยสารสารคดี เดือนตุลาคม 2548
  2. Limited, Bangkok Post Public Company. "MRT extension approved". https://www.bangkokpost.com. Retrieved 2020-04-28. External link in |website= (help)
  3. "Thai subway shut for safety probe". BBC News. 17 January 2005. Retrieved 13 May 2010.
  4. ข่าวดังข้ามเวลา : บทเรียนใต้พิภพ (21 มี.ค.59)

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.