Tehran Metro Line 3

Tehran Metro Line 3 travels from northeast to southwest. Line 3 is one of the most important lines as it connects southwest Tehran to northeast, crosses busy parts of the capital city, and can help to alleviate traffic problems.[2] About 7 kilometers (4.3 mi) of Line 3 became operational in December 2012,[3] followed by 12 kilometers (7.5 mi) in April 2014, and finally, the last section of the line which is 18 kilometers (11 mi) opened on September 22, 2015, increasing the length of the line to a total of 37 kilometers (23 mi).[3]

Tehran Metro Line 3
Overview
Native nameخط ۳ مترو تهران
TypeRapid transit
SystemTehran Metro
LocaleTehran, Tehran Province
TerminiGhaem Station
Azadegan Station
Stations24 (26 when complete)
Operation
OpenedDecember 16, 2012[1]
OwnerTehran Urban and Suburban Railways Organization (Metro)
Operator(s)Tehran Urban and Suburban Railways Organization (Metro)
Depot(s)Azadegan Depot
Technical
Line length38 km (24 mi)
Track gauge1,435 mm (4 ft 8 12 in)
ElectrificationThird rail
Route map
Tehran Metro Line 3
Ghaem
Shahid Mahallati
Aghdasiyeh
Niavaran Branch
Nobonyad
Hossein Abad
Heravi
Shahid Zeyn-o-ddin
Khajeh Abdollah-e Ansari
Shahid Sayyad-e Shirazi
Shahid Ghoddoosi
Sohrevardi
Shahid Beheshti
Mirzaye Shirazi
Meydan-e Jahad
Meydan-e Vali Asr
Teatr-e Shahr
Daneshgah-e Emam Ali
Moniriyeh
Mahdiyeh
Rahahan
Javadiyeh
Zam Zam
Shahrak-e Shari'ati
Abdol Abad
Ne'mat Abad
Azadegan
Azadegan Depot

Route

The line starts from northeastern Tehran at Shahrak-e Qa'em going westward parallel to but 300 m north of Artesh Expressway, passing through Aghdasieh neighbourhood. Then it turns south at the end of Artesh Expressway going to Nobonyad Square. It then turns towards Sayyad Expressway and runs southward along it for about 5.6 kilometers (3.5 mi). At Sabalan square, it then turns west, going under Beheshti Street, intersecting with Line 1 at Shahid Beheshti Station. It then turns towards south, going under Valiasr Street for 7.7 kilometers (4.8 mi), until it reaches Rahahan Square, providing access to Tehran railway station. It then turns towards southwest, passing through Javadiyeh and then going along Cheraghi Expressway and Saidi Expressway. The line then terminates at Azadegan Station at the intersection of Saidi Expressway with Azadegan Expressway.

gollark: If you send me code samples, I'll add it to the PotatOS Code Safety Checker so it won't run.
gollark: ... how do people keep *doing* that?
gollark: Lucasx150, did you SERIOUSLY get a virus or something on your computers?
gollark: pjals, when will you fix your name?
gollark: The day I always feared has arrived. Some DODECAHEDRON spammed potatOS incident logs with 6000 fake messages.

References

  1. Schwandl, Robert (2004). "Tehran". UrbanRail.net. Archived from the original on 2015-10-01.
  2. "Lines 3 and 4 of Tehran Subway Rapidly Developing". Payvand Iran News. December 15, 2010. Retrieved April 23, 2014.
  3. "12km section of Tehran Metro inaugurated". TehranTimes. April 22, 2014. Archived from the original on March 17, 2015. Retrieved April 23, 2014.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.