Taylors Lane Power Station

Taylors Lane Power Station is situated in Willesden, north-west London. The first power station on the site, known as Willesden power station, was coal-fired and operated from 1903 to 1972 and was subsequently demolished. Taylors Lane is now an open cycle gas turbine (OCGT) power station built in 1979.

Taylors Lane Power Station
Taylors Lane Power Station
CountryEngland
LocationGreater London
Coordinates51.54600°N 0.25750°W / 51.54600; -0.25750
StatusCoal-fired station demolished; OCGT operational
Commission date1903 and 1979
Decommission date1972
Operator(s)Northmet (1904-48), British Electricity Authority (1948-55), Central Electricity Authority (1955-57), Central Electricity Generating Board (1958-72); OCGT CEGB(1979-90), PowerGen (1990-),E.On, Uniper
Thermal power station
Primary fuelCoal, Natural gas
ChimneysOCGT 2
Power generation
Units operationalCoal-fired 2 × 32 MW
Units decommissionedCoal-fired all decommissioned
Nameplate capacity132MW[1]
External links
CommonsRelated media on Commons

grid reference TQ209844

History

The first, coal-fired, station was built in 1903 by Willesden Urban District Council and sold to the North Metropolitan Electric Power Supply Company (Northmet) in 1904.[2] Northmet subsequently supplied Willesden Urban District Council with electricity. It was known as Willesden power station but was later called Taylors Lane to distinguish it from another Willesden power station at Acton Lane. Generating capacity increased from 300 KW in 1903, 20.25 MW in 1923, to 28.6 MW in 1937.[3] By 1961 the installed capacity was 11.5 MW; the station produced 1.076 GWh in that year and had a thermal efficiency of 5.91 per cent.[4]

Coal was delivered to the site by railway. There were two sidings off the Acton Branch (Dudding Hill) railway.[5] The sidings were extant in 1990 although they had been disconnected from the railway by 2005.[6]

This coal-fired power station closed in 1972.[2]

Specification

In 1923 the plant at Willesden (Taylors Lane) comprised 3 × 1,500 kW, 1 × 3,000 kW and 2 × 6,000 kW steam turbines providing a 3-phase AC supply.[7] In addition there was a single 750 kW reciprocating machine producing a 460 & 230V and a 480 & 240V DC supply. The total generating capacity was 20.25 MW. The turbines and reciprocating machines were supplied with 248,000 lb/hr (31.25 kg/s) of steam from the boilers.[7]

By 1963-64 Taylors Lane had 2 × 32 MW generators.[8] The steam capacity of the boilers was 880,000 lb/hr (110.9 kg/s); steam conditions at the turbine stop valves was 190/1350 psi (13.1/93.1 bar) and 343/513°C. The boilers were a mixture of chain grate stoker and pulverised fuel. In 1963-64 the overall thermal efficiency of the B station was 20.95 per cent.[8] The first electrostatic precipitators in the UK were installed in 1929. Dust and grit were given a positive charge in an electric field then deposited on negatively charged screen or wires.[9]

Electricity output from coal-fired power station was as follows.[8][4][10][11][12]

Taylors Lane annual electricity output GWh.

Taylors Lane OCGT station

The current station was opened in 1979 by the Central Electricity Generating Board. It is now operated by Uniper.[13] It can be operated remotely from Enfield Power Station and has two generator units fired on gas-oil with a capacity of 132 MW. Each unit uses 4 gas generators derived from the Rolls-Royce Olympus jet engine.[1]

The station is adjacent to the 132 kV Leicester Road Grid substation with a 132 kV underground connection to the Willesden substation.[14]

In 2011, in the Lost episode of series 14 of the BBC thriller Silent Witness, a body is found in a lane beside the power station.

gollark: I mean, nature makes horrible things like those parasitic wasps, and we humans have nice things like computers and medicine.
gollark: A lot of the time it's just because it's not "natural" or something, which seems stupid and meaningless.
gollark: > >not buying a box of 10,000 BIC blue pens10000, you say? Where can I buy such quantities?
gollark: I bought a box of 100 on Amazon some years back, very helpful.
gollark: I haven't received any information on how they plan to mitigate coronavirus risk.

References

  1. "Taylor's Lane - E.ON". E.ON. Retrieved 30 October 2013.
  2. "'Willesden: Public services'". A History of the County of Middlesex: Volume 7: Acton, Chiswick, Ealing and Brentford, West Twyford, Willesden (1982), pp. 232-236. Victoria County History. Retrieved 18 April 2009.
  3. "LONDON ELECTRICITY BOARD (LEB) PRE-VESTING UNDERTAKINGS (1882 - 1948) LMA/4278/01 1883 - 2003". National Archives. Retrieved 18 April 2009.
  4. "British Power Stations operating at 31 December 1961". Electrical Review. 1 June 1961: 931.
  5. Jacobs, Gerald (1990). London Midland Region Track Diagrams. Exeter: Quail Map Company. p. 1. ISBN 0900609745.
  6. Jacobs, Gerald (2005). Railway Track Diagrams Book 4: Midlands & North West. 2005: Trackmaps. p. 1. ISBN 0954986601.CS1 maint: location (link)
  7. Electricity Commission (1925). Electricity Supply - 1920-1923. London: HMSO. pp. 188–89.
  8. CEGB Statistical Yearbook (various years). CEGB, London.
  9. The Electricity Council (1987). Electricity Supply in the United Kingdom: a Chronology. London: The Electricity Council. p. 47. ISBN 085188105X.
  10. Garrett, Frederick C. (ed) (1959). Garcke's Manual of Electricity Supply. London: Electrical Press. pp. A-135, 136.CS1 maint: extra text: authors list (link)
  11. CEGB Annual Report and Accounts, various years
  12. Electricity Commission, Generation of Electricity in Great Britain year ended 31st December 1946. London: HMSO, 1947.
  13. "Power stations in the United Kingdom, May 2008 (DUKES 5.11)". Department for Business Enterprise and Regulatory Reform. Archived from the original on 28 August 2011. Retrieved 18 April 2009.
  14. "Open Infrastructure Map". Open Infrastructure Map. Retrieved 4 April 2020.


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.