Steventon railway station

Steventon railway station was built when the Great Western Railway extended their main line from Reading to the village of Steventon, opening the line on 1 June 1840.[1] Two months later, on 20 July, it was extended to Faringdon Road,[2] and in December of that year, to Swindon.

Steventon
Location
PlaceSteventon
AreaDistrict of Vale of White Horse
Grid referenceSU472916
Operations
Original companyGreat Western Railway
Pre-groupingGWR
Post-groupingGWR
Western Region of British Railways
Platforms2
History
1 June 1840Opened
7 December 1964Closed
Disused railway stations in the United Kingdom
Closed railway stations in Britain
A B C D–F G H–J K–L M–O P–R S T–V W–Z

Station for Oxford

For four years stagecoaches transported passengers between Steventon and Oxford, until 1844 when a branch was built to the city from Didcot; despite this, mail trains from the West continued to call at Steventon, rather than Didcot, in order to drop off mails for Oxford – this practice did not end until March 1962.[3]

On 7 December 1964 British Railways withdrew passenger services from Steventon and all other intermediate stations between Didcot and Swindon.[3] The station was demolished soon after closure and there is no evidence remaining, except for a house used briefly as the company headquarters of the Great Western Railway which still stands on the "up" (north) side of the line (see next section).

Headquarters of the GWR

Steventon was briefly the headquarters of the GWR: in October 1841, the Board decided to merge the previously-separate London and Bristol committees. Steventon was chosen as a suitable new location because it was close to the half-way point of the line (56 miles 22 chains from the old station at Paddington, 61 miles 71 chains from the old station at Bristol[4]). A building for this purpose was erected: reputedly designed by the Engineer of the GWR, Isambard Kingdom Brunel in the Jacobean style, but modified by the Resident Engineer for the Reading/Swindon section of the line, J.H. Gandell (and subsequently built by him as contractor, after he resigned his post as Resident Engineer),[5] this building still survives on the north side of the line, set back slightly from the site of the station platforms. After a delay of several months, during which the accommodation was made ready, the weekly board meetings were held at Steventon from 21 July 1842 until 5 January 1843, when the permanent headquarters was established at Paddington.[6]

Accidents and incidents

  • On 21 January 1962, 68xx locomotive 6800 Arlington Grange was hauling a freight train that overran signals and was derailed.[7]

Route

Preceding station Historical railways Following station
Didcot
Line and station open
  British Rail
Western Region

Great Western Main Line
  Wantage Road
Line open, station closed

Notes

  1. MacDermot 1927, p. 102.
  2. MacDermot 1927, p. 103.
  3. Gardner 1996, p. 43.
  4. MacDermot 1927, p. 857.
  5. Vaughan 1991, pp. 131–132.
  6. MacDermot 1927, pp. 160–1.
  7. Vaughan 1983, pp. 100–105.
gollark: I've heard fluid mechanics is very complex and hard.
gollark: ↑
gollark: Possibly? I'd expect there's another way.
gollark: EFI, I mean.
gollark: I'm not sure if it actually has drawing commands outside of terminal-ish stuff.

References

  • Gardner, Jack (1996). Brunel's Didcot - Great Western Railway to Great Western Society. Cheltenham: Runpast. ISBN 1-870754-41-7.CS1 maint: ref=harv (link)
  • MacDermot, E.T. (1927). History of the Great Western Railway, vol. I: 1833-1863 (1st ed.). Paddington: Great Western Railway.CS1 maint: ref=harv (link)
  • Vaughan, Adrian (1983). Signalman's Twilight. London: John Murray. ISBN 0-7195-3973-0.CS1 maint: ref=harv (link)
  • Vaughan, Adrian (1991). Isambard Kingdom Brunel Engineering Knight Errant. London: John Murray. ISBN 0-7195-5282-6.CS1 maint: ref=harv (link)

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.