Sripada Yellampalli project

Sripada Yellampalli project is an irrigation project located at Yellampalli Village, Ramagundam Rural Mandal, between Peddapalli district (Old Karimnagar district- Mancherial District (Old Adilabad district) in Telangana State, India.[1][2] The project is fourth largest on the Godavari River in Telangana region. It is named after late legislator, D. Sripada Rao.[3]

Sripada Yellampalli project
Yellampalli Barrage at Ramagundam Mandal
Sripada Yellampalli project (India)
LocationYellampalli (village), Ramagundam Godavarikhani
Coordinates18°50′45″N 79°22′05″E
PurposeMulti-purpose (Ntpc Ramagundam power plant uses & supplies Drinking water to Ramagundam Godavarikhani and Hyderabad cities.
StatusOperational
Construction began28 July 2004
Opening date4 August 2016
Construction cost5400 crore rupees
Owner(s)Government of Telangana
Dam and spillways
Type of damBarrage
ImpoundsGodavari River
Height26.3m
Length1180.7m
Spillways62
Reservoir
CreatesYellampalli
Total capacity20 tmcft
Power Station
Operator(s)Telangana State
Commission date2004
TypeBarrage

Project info

Sripada Yellampalli irrigation project foundation was laid by Chief Minister of Andhra Pradesh, Y. S. Rajasekhara Reddy on 28 July 2004.

The project is designed to utilize about 63 tmc of water at a cost of Rs. 900 crores in the first phase. In the second phase, about 49.5 tmc would be lifted to the upland regions of Karimnagar, Adilabad, Nizamabad, Warangal and Medak districts. 6 tmc water allotted for NTPC Ramagundam project.[4] After the flood gates are installed, the project could would store about 20 Tmcft of water.[5]

The project operational requirement is 163 MW power and 469 million KWh of electrical energy annually to pump the water. The project would supply water for NTPC power project reservoir in Ramagundam Mandal in Karimnagar.[6] It is started on 2005 near Mormoor and Yellampalli village at Ramagundam and its mainly supplying drinking water to Ramagundam Godavarikhani city and Hyderabad city.

gollark: I can use my phone, you know.
gollark: Basically, TJ09 has blocked me from accessing DC. Or at least my server and home computer.
gollark: Yep!
gollark: Still, though, a polite "hey, this goes against my ***GRAND VISION***, please stop" would have been okay...
gollark: YAH actually *did* sickness checking.

See also

References

  1. "Sripada Yellampalli project water for NTPC plant". The Hindu. Retrieved 15 September 2014.
  2. "Sripad Sagar(Yellampalli) Major Irrigation Project JI00042". Retrieved 15 September 2015.
  3. "Sripada Yellampalli project by May 2008". The Hindu. Retrieved 15 September 2014.
  4. "YSR lays stone for Yellampalli project". The Hindu. Retrieved 15 September 2014.
  5. "White paper sought on Yellampalli". The Hindu. 23 October 2010. Archived from the original on 10 November 2012. Retrieved 15 September 2014.
  6. "Trial run for supply of water to NTPC in Nov". The Hindu. 16 August 2010. Archived from the original on 3 February 2011. Retrieved 15 September 2014.


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.