South East Hampshire Bus Rapid Transit

South East Hampshire Bus Rapid Transit is a 2.8 miles (4.5 km) unguided busway between Gosport and Fareham, Hampshire, sponsored by Hampshire County Council using the route of the former Fareham to Gosport Line to reduce congestion on the parallel A32 between the towns.[1] The scheme was proposed following the collapse of the light rail scheme using the same route and funding was approved in July 2009 for the £20m scheme. The route opened on 22 April 2012 with services provided by First Hampshire & Dorset using specially branded "Eclipse" buses on all routes utilising the busway.

Gosport Eclipse Busway
Redlands Ln
Redlands Lane
Palmerston Drive
Palmerston Dr.
Newgate Ln
Hoeford
Wych Lane
Wych Ln
Gregson Avenue (Southbound)
Gregson Ave.
Gregson Avenue (Northbound)
Cameron Close
Brewers Ln
Tichborne Way
Hutfield Link
Fareham to Gosport Line
    An Eclipse BRT bus calls at Gregson Avenue bus stop, as seen from the road bridge over the busway.
    Inside an Eclipse BRT bus showing the leather seating.
    Inside an Eclipse BRT bus. Note the wood effect flooring.
    Inside an Eclipse BRT bus showing the downward facing under seat lighting and the wood effect flooring.

    Overview

    In 1998 Hampshire County Council and Portsmouth City Council proposed a Light Rail System to link Fareham and Portsmouth via Gosport.[2] Funding of £170m was approved in 2001 but withdrawn in 2004, a decision that was confirmed in 2006.[3] Following this decision, a cheaper, shorted BRT scheme was proposed.

    Route

    The busway follows the route of the disused railway from Redlands Lane to Tichborne Way.

    Services

    Two existing bus routes were replaced by the new Eclipse Bus Rapid Transit network and one was modified to use part of it. Buses on routes 86 and 82 became Eclipse routes E1 and E2 and at peak times route 88 (as the X88 service) was diverted to use part of the busway between Wych Lane and Redlands Lane.[4] On 18 November 2012 service 88 was replaced by service 9 / 9A.

    gollark: Hold on.
    gollark: We have to make turtles at this dedicated facility. Turtles CAN'T automatically configure machines.
    gollark: Unfortunately, that isn't practical.
    gollark: I was thinking that, but turtles are quite æ to work with.
    gollark: I MADE a bunch, but they are in storage.

    References

    1. "Overview of the BRT scheme". 22 October 2012. Retrieved 3 December 2012.
    2. "South Hants LRT". November 2004. Retrieved 3 December 2012.
    3. "South Hants LRT sunk despite high VfM". 27 July 2006. Retrieved 3 December 2012.
    4. "What is the Eclipse Phase 1 Bus Rapid Transit Network?". 7 June 2012. Retrieved 3 December 2012.
    This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.