Solothurn–Moutier railway

The Solothurn–Moutier railway is a 22 kilometre-long standard-gauge line in Switzerland, connecting Solothurn via the Weissenstein Tunnel to Moutier in the Bernese Jura. At the start of operations in 1908, the Emmentalbahn (Emmental Railway) took over operations of the line, which was owned by the Solothurn-Münster-Bahn (Solothurn-Moutier Railway, SMB). In 1997, it merged with the Emmental-Burgdorf-Thun-Bahn (EBT) and the Vereinigte Huttwil-Bahnen (United Huttwil Railways, VHB)—which already worked together for the operation of trains—to form the Regionalverkehr Mittelland (RM), which then took over the operation of the line. Since a merger in 2006, the line has been part of BLS, while passenger services have been operated by the Swiss Federal Railways (SBB) since 2010.

Solothurn–Moutier railway
Overview
TerminiSolothurn
Moutier
Line number411
Operation
OwnerBLS
Technical
Line length22.09 km (13.73 mi)
Number of tracks1
Track gauge1,435 mm (4 ft 8 12 in)
Minimum radius250 metres (820 ft)
Electrification15 kV  16.7 Hz AC overhead catenary
Maximum incline2.8%
Route map

km
elev
73.8
Solothurn
432 m
to Lyss
Aare bridge (104 m)
74.8
0.0
Solothurn West
433 m
1.9
Langendorf
470 m
Geissloch viaduct (186 m)
5.3
Lommiswil
555 m
8.0
Im Holz
618 m
9.6
Oberdorf SO
655 m
Weissenstein Tunnel (3700 m)
13.6
Gänsbrunnen
719 m
14.6
Crémines-Zoo
695 m
Corcelles viaduct (96 m)
16.6
Corcelles BE
651 m
17.8
Crémines
624 m
18.8
Grandval
601 m
22.1
Moutier
529 m
Source: Swiss railway atlas[1]

History

Geissloch viaduct near Bellach
Oberdorf station in 2012
Share of the Solothurn-Moutier railway, issued 15. October 1906

Construction

The constituent general meeting of the SMB took place on 30 April 1899, but for various reasons including difficulties in securing funding, construction did not begin until 1903.[2] Construction finally started on 28 December 1903.[3] Construction of the line proved to be difficult as, on the one hand, the terrain to be built on was unstable and it was repeatedly affected by landslides, and, on the other hand, the construction of 84 significant structures was required on the short line.[4] The building material for these structures mainly came from the quarries in Lommiswil and Gänsbrunnen.[5] The largest construction site on the line was the future station area in Oberdorf, because the Weissenstein Tunnel was built from there. As occurred at other tunnel construction sites in Switzerland, a temporary settlement was built nearby for the tunnel workers. During the construction of the line there were two fatalities at the Geissloch viaduct construction, but the exact causes are unknown.[6] When operations began in 1908, construction work had not been completed. In particular the problems with the landslides had not been solved, which meant that the work was not completed until 1909.[7]

First years of operation

Because the operation of the line would not have been profitable due to its short length, the Solothurn-Münster-Bahn transferred operations on to the line before the inauguration of the line to the Emmentalbahn, which also terminated in Solothurn. The line was opened on 3 August 1908.[7]

Construction had not been completed due to landslides and various other interruptions to works. Traffic initially developed well, mainly due to freight traffic, which mainly served Von Roll and the Swiss Army. The beginning of the First World War also strongly affected operations on the line, so passenger services had to be severely restricted and the planned freight operations were completely abandoned because more extensive operations were no longer possible due to sharply increased coal prices.[8] Although the timetable of 1921 showed the same number of services as before the war, the frequencies decreased, mainly because road transport was gradually becoming competitive. The line retained a certain importance for through traffic.

Electrification and the Second World War II

Electrical operations under the usual Swiss Federal Railways (SBB) AC system of 15 kV at 16⅔ Hz was recorded on 2 October 1932, leading to an increase in passenger service frequency. The outbreak of the Second World War in 1939 had a major impact on the line from Solothurn to Moutier, as the Swiss Army made great use of the line for passenger and freight traffic. However, international through traffic collapsed in 1940. The war traffic ended from 20 August 1945.[9]

Post-war period

The recommissioning of the line was initially slow and it only regained a certain importance, this time touristic, with the opening of the Oberdorf–Weissenstein chairlift in 1952, the terminal station of which is located in the Oberdorf station area. The further significance of the line at this time was limited to its function as a feeder to the regional centres of Solothurn and Moutier. As a result, operations have focused on commuter traffic since the 1960s.[10]

Rejected closure

In 1978, the final report of the commission for the Swiss transport concept was published, which recommended that the line be converted to bus operation and that the Weissenstein tunnel be converted into a road tunnel. However, the Federal Office of Transport and the Canton of Solothurn rejected these measures in 1984, mainly because the line was still of some importance for through freight traffic and major renewal of the infrastructure was not necessary.[10]

Since 1997

The joint operations with the EBT and the VHB—headed by the EBT as the largest of the three companies—was merged into the Regionalverkehr Mittelland company (RM) on 1 January 1997. The RM merged with the BLS Lötschbergbahn (BLS) on 27 June 2006 to form BLS AG. Since the timetable change of December 2010, the passenger services on the line, which is owned by the BLS, are operated by the SBB. This happened (in conjunction with the provision of regional services between Murten and Payerne) in return for the takeover of SBB services in the Lucerne area by the BLS.[11] Since 2013, the line has been on the Federal Office of Transport's list of lines that have a cost recovery ratio of less than 30 percent.[12] In 2017, the Federal Office of Transport decided that the Weissenstein Tunnel should be rehabilitated from 2020 to ensure operations for a further 25 years.[13]

gollark: "Genius" is far too underwhelming a word to capture our sheer intellect, yes.
gollark: According to me™, stuff is vaguely okay, and by many metrics appears to be improving.
gollark: ···.
gollark: Faster, though.
gollark: If I was forced to write all osmarks.net backend services as highly optimized C or something, they would probably be buggier, slower, less maintainable and lacking features.

References

Footnotes

  1. Eisenbahnatlas Schweiz (Swiss railway atlas). Schweers + Wall. 2012. p. 9. ISBN 978-3-89494-130-7.
  2. Weber & Suter 2008, pp. 14–15.
  3. Weber & Suter 2008, p. 15.
  4. Weber & Suter 2008, p. 16.
  5. Weber & Suter 2008, p. 17.
  6. Weber & Suter 2008, p. 19.
  7. Weber & Suter 2008, p. 39.
  8. Weber & Suter 2008, p. 43.
  9. Weber & Suter 2008, p. 47.
  10. Weber & Suter 2008, p. 49.
  11. 2010 Annual report (in German). BLS. pp. 6, 15.
  12. "Publikation des Bundesamtes für Verkehr" (PDF; 29 kB) (in German). Archived (PDF) from the original on 22 February 2018. Retrieved 21 December 2018.
  13. "Weissenstein-Eisenbahntunnel wird saniert" (Press release) (in German). Federal Office of Transport. 14 February 2017. Archived from the original on 22 February 2018. Retrieved 21 December 2018.

Sources

  • Weber, Werner; Suter, Jürg (2008). Solothurn–Münster-Bahn. Die Linie Solothurn–Moutier der BLS AG (in German). Leissigen: Prellbock Verlag. ISBN 978-3-907579-28-2.CS1 maint: ref=harv (link)
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.