Satish Dhawan Space Centre Third Launch Pad

The Third Launch Pad (TLP) of the Satish Dhawan Space Centre is an under development rocket launch site in Sriharikota, India. When the launch pad will be completely built, it will be the third launch pad in the Satish Dhawan Space Centre, the other two being First Launch Pad and the Second Launch Pad. In 2018, it was reported that the launch of India's first crewed orbital spacecraft "Gaganyaan" is scheduled to be launch from the third launch pad before 2022[1]. However in November 2019, ISRO released tenders for augmentation of second launch pad for Gaganyaan project.[2][3][4][5][6]

Third Launch Pad
Launch siteSatish Dhawan Space Centre
LocationSriharikota
Short nameTLP
Operator ISRO
Human Space Flight Rated
Launch history
StatusUnder construction
Launches0
First launch2020 (planned)
Associated
rockets
PSLV
GSLV
GSLV Mk.III
UMLV
Avatar RLV

Usage

This launch pad is intended to be used for future Indian rockets like the Unified Modular Launch Vehicle, Geosynchronous Satellite Launch Vehicle Mk III and Avatar RLV (Avatar Reusable Launch Vehicle) as well as the older ones like Polar Satellite Launch Vehicle and Geosynchronous Satellite Launch Vehicle.[7] The launch pad will be used for the India's future human space missions.[8] One of the main reasons of building this launch pad is that it will increase the frequency of orbital launches by ISRO.[9]

Facilities

Several facilities have been proposed to be built at the Third Launch Pad. They include a vehicle assembly building, mobile pedestals, umbilical towers, emergency exits, ground escape system, crew ingress and egress systems, safety bunkers, material handling equipment and related electrical systems.[10]

Status

Construction of the launch pad started in September 2012.[11] The total cost of the new launch pad is estimated to be 5 billion (US$70 million).[12]

gollark: Unlike *someone*, I actually have mitigations on.
gollark: ```Flags: fpu vme de pse tsc msr pae mce cx8 apic sep mtrr p ge mca cmov pat pse36 clflush dts acpi mmx fxsr ss e sse2 ss ht tm pbe syscall nx pdpe1gb rdtscp lm c onstant_tsc art arch_perfmon pebs bts rep_good nop l xtopology nonstop_tsc cpuid aperfmperf tsc_known _freq pni pclmulqdq dtes64 monitor ds_cpl vmx est tm2 ssse3 sdbg fma cx16 xtpr pdcm pcid sse4_1 sse4 _2 x2apic movbe popcnt tsc_deadline_timer aes xsav e avx f16c rdrand lahf_lm abm 3dnowprefetch cpuid_ fault epb invpcid_single pti ssbd ibrs ibpb stibp tpr_shadow vnmi flexpriority ept vpid ept_ad fsgsb ase tsc_adjust bmi1 avx2 smep bmi2 erms invpcid mp x rdseed adx smap clflushopt intel_pt xsaveopt xsa vec xgetbv1 xsaves dtherm ida arat pln pts hwp hwp _notify hwp_act_window hwp_epp md_clear flush_l1d```
gollark: Architecture: x86_64CPU op-mode(s): 32-bit, 64-bitByte Order: Little EndianAddress sizes: 39 bits physical, 48 bits virtualCPU(s): 4On-line CPU(s) list: 0-3Thread(s) per core: 2Core(s) per socket: 2Socket(s): 1NUMA node(s): 1Vendor ID: GenuineIntelCPU family: 6Model: 142Model name: Intel(R) Core(TM) i5-7200U CPU @ 2.50GHzStepping: 9CPU MHz: 861.413CPU max MHz: 3100.0000CPU min MHz: 400.0000BogoMIPS: 5426.00Virtualization: VT-xL1d cache: 64 KiBL1i cache: 64 KiBL2 cache: 512 KiBL3 cache: 3 MiBNUMA node0 CPU(s): 0-3Vulnerability L1tf: Mitigation; PTE Inversion; VMX conditional cache f lushes, SMT vulnerableVulnerability Mds: Mitigation; Clear CPU buffers; SMT vulnerableVulnerability Meltdown: Mitigation; PTIVulnerability Spec store bypass: Mitigation; Speculative Store Bypass disabled via prctl and seccompVulnerability Spectre v1: Mitigation; __user pointer sanitizationVulnerability Spectre v2: Mitigation; Full generic retpoline, IBRS_FW, STIBP conditional, RSB filling
gollark: This is highly tetrahedral.
gollark: This is one of the least reliable servers I have ever potatOSed on.

References

  1. Peri, Dinakar (21 September 2018). "ISRO setting up launch pad for Gaganyaan mission". The Hindu. ISSN 0971-751X. Retrieved 22 September 2018.
  2. "SDSC SHAR/Sr.HPS/PT/RO/11/2019-20". www.isro.gov.in. Indian Space Research Organization. 7 November 2019. Retrieved 22 November 2019.
  3. "RFP TO REALISE HYDRANT SYSTEM FOR AUGMENTED FACILITIES AT SLP COMPLEX (ASLP) SDSC, SHAR SRIHARIKOTA" (PDF). www.isro.gov.in. Indian Space Research Organization. 7 November 2019. Retrieved 22 November 2019.
  4. "Work Contract to carry out Video & Still Photography documentation coverage and VIDEO Editing Works of Technical Photography Facility" (PDF). www.isro.gov.in. Indian Space Research Organization. 7 November 2019. Retrieved 22 November 2019.
  5. "SUPPLY OF RAW MATERIAL, FABRICATION, ERECTION AND COMMISSIONING OF STRUCTURAL ELEMENTS FOR GAGANYAAN MISSION AT UMBILICAL TOWER OF SECOND LAUNCH PAD (SLP)" (PDF). www.isro.gov.in. Indian Space Research Organization. 7 November 2019. Retrieved 22 November 2019.
  6. "REALISATION OF NEW HYDRAULIC SYSTEM FOR CREW ACCESS ARM (CAA) & AUGMENTATION/MODIFICATION OF EXISTING SCVRP-3 HYDRAULIC SYSTEM FOR SERVICING GAGANYAAN MISSION AT UMBILICAL TOWER (UT) OF SECOND LAUNCH PAD (SLP)" (PDF). www.isro.gov.in. Indian Space Research Organization. 7 November 2019. Retrieved 22 November 2019.
  7. "Isro to build third launchpad at Sriharikota". PTI. Times of India. 1 July 2012. Retrieved 8 June 2013.
  8. "ISRO to begin process for Human Space Flight Mission". PTI. Hyderabad. India Today. 26 January 2010. Retrieved 8 June 2013.
  9. "ISRO To Build A Third Launch Pad at Spaceport". Indiadefence.com. 2 June 2012. Retrieved 8 June 2013.
  10. This section contains public domain text which were published by the Press Trust of India.
  11. Chandrashekar, Nandini (2 June 2012). "3rd launch pad to be built". Deccan Herald. Bangalore. Retrieved 8 June 2013.
  12. "High-tech third launch pad in Sriharikota soon". Deccan Herald. 29 March 2015. Retrieved 23 July 2019.

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.