Pennant Hills railway station
Pennant Hills railway station is located on the Main Northern line, serving the Sydney suburb of Pennant Hills. It is served by Sydney Trains T9 Northern Line services.
Pennant Hills | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Northbound view | |||||||||||
Location | Railway Street, Pennant Hills | ||||||||||
Coordinates | 33°44′17″S 151°04′21″E | ||||||||||
Owned by | Transport Asset Holding Entity | ||||||||||
Operated by | Sydney Trains | ||||||||||
Line(s) | Main Northern | ||||||||||
Distance | 28.58 kilometres from Central | ||||||||||
Platforms | 1 side, 1 island | ||||||||||
Tracks | 3 | ||||||||||
Connections | Bus | ||||||||||
Construction | |||||||||||
Structure type | Ground | ||||||||||
Disabled access | Yes | ||||||||||
Other information | |||||||||||
Status | Staffed | ||||||||||
Station code | PNT | ||||||||||
Website | Transport for NSW | ||||||||||
History | |||||||||||
Opened | 17 September 1886 | ||||||||||
Rebuilt | 2016 | ||||||||||
Electrified | Yes | ||||||||||
Traffic | |||||||||||
Passengers (2013) | 3,370 (daily)[1] (Sydney Trains, NSW TrainLink) | ||||||||||
Rank | 70 | ||||||||||
Services | |||||||||||
|
History
Pennant Hills station opened on 17 September 1886.[2] In the 1990s, the station received an upgrade being fitted with lifts. Immediately north of Pennant Hills, a short four track section of the Main Northern line begins which runs to the next station at Thornleigh.[3]
As part of the North Sydney Freight Corridor project, an electrified passing loop was built behind the western platform where it joined the existing loop. As part of these works the western platform was converted to an island.[4][5][6][7] The new platform opened on 14 June 2016.[8]
Platforms and services
Platform | Line | Stopping pattern | Notes |
1 | Services to Gordon via Strathfield & North Sydney | [9] | |
---|---|---|---|
2 | services to Hornsby | [9] | |
3 | No booked passenger services |
Trackplan
gollark: Why bother though?
gollark: ~~it's not correct just because you strikethrough and capitalize it~~
gollark: In the real world I think processing power density is mostly limited by power and cooling.
gollark: If you can stick whatever you want into a bird head somehow you can stick it in basically any other design.
gollark: So, overclock it a bit, or…?
References
- Bureau of Transport Statistics. "Train Statistics 2014" (PDF). Transport NSW. Retrieved 12 July 2018.
- Pennant Hills Station NSWrail.net
- State Rail Authority Track Diagram, 1992
- Epping to Thornleigh Third Track Transport for NSW
- Leighton Contractors & TfNSW in Alliance to deliver Epping to Thornleigh Third Track Project Leighton Contractors 8 March 2013
- Leighton & Abigroup win Epping to Thornleigh Third Track contract Rail Express 20 March 2013
- "Northern Sydney Freight Corridor Update" Railway Digest December 2014 pages 28-29
- "Weekly Notice 21" Sydney Trains May 2016 page 5
- "T9: Northern line timetable". Transport for NSW.
External links
Media related to Pennant Hills railway station at Wikimedia Commons - Pennant Hills station details Transport for New South Wales
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.