Obulavaripalle–Krishnapatnam section
Obulavaripalle–Krishnapatnam branch line is a railway section project in South Central Railway zone, which connects Obulavaripalle of Kadapa district and Krishnapatnam of Nellore district in the Indian state of Andhra Pradesh.[1][2] Further, this section intersects Howrah-Chennai main line, Guntakal–Renigunta section and Nadikudi–Srikalahasti section.[3] This section has a total length of 33.85 km (21.03 mi) and is administered under Vijayawada railway division of South Coast Railway zone.[1][3] On 2 March 2014, Venkatachalam–Krishnapatnam part of the section was commissioned.[1]
Obulavaripalle–Krishnapatnam branch line | |
---|---|
Overview | |
System | Indian Railways |
Status | Operational |
Locale | Andhra Pradesh |
Termini | Obulavaripalle Krishnapatnam |
Stations | 6 |
Operation | |
Opened | 01-09-2019 |
Owner | Indian Railway |
Operator(s) | Vijayawada division of South Coast Railway zone |
Character | At-grade street running |
Technical | |
Line length | 112 km (70 mi) |
Number of tracks | 1 |
Track gauge | 1,676 mm (5 ft 6 in) Broad gauge |
References
- "Annual Report 2015-16" (PDF). Rail Vikas Nigam Limited. p. 33. Retrieved 30 April 2019.
- Ganguly, Sarthak (28 February 2019). "Plans afoot for passenger trains to chug on Krishnapatnam-Obulavaripalli rail line". The Times of India. Hyderabad. Retrieved 30 April 2019.
- "SCR Railway Map 2018" (PDF). South Central Railway. Retrieved 23 April 2019.
External links
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.