Na Hang Dam

The Na Hang Dam (also known as Tuyên Quang Dam) is a hydroelectric dam on the Gâm River near Pác Tạ Mountain in Tuyên Quang Province, Vietnam.

Na Hang Dam
Na Hang Dam
Location of Na Hang Dam in Vietnam
Official nameĐập Na Hang
CountryVietnam
LocationTuyên Quang Province
Coordinates22°21′36″N 105°23′55″E
StatusOperational
Construction began2002
Opening date2008
Dam and spillways
Type of damRock-fill
ImpoundsGâm River
Height92 m (302 ft)
Length718 m (2,356 ft)
Reservoir
Total capacity2.3 cubic kilometres (1,900,000 acre⋅ft)
Power Station
Turbines3 X 114 MW Francis-type
Installed capacity342 MW
Annual generation1,200 GWh

Construction began on December 22, 2002 and the first unit was commissioned in March 2008 followed by the two other units by end of 2008. The power plant has a capacity of 342 MW (the second largest in the north), and has an energy generating potential of 1,200 GWh per year.[1] The project's estimated approved cost was US$490 million. The project, as built, has a 92 metres (302 ft) rock fill dam and 718 metres (2,356 ft) long (crest length), called the Na Hang Dam. It has a gross storage capacity of 2.3 billion cubic metres (1,900,000 acre⋅ft) (including 1 billion cubic metres (810,000 acre⋅ft) of flood storage) on the Gâm River.[2]

Construction of the dam inundated five communes involving about 4,000 households from an area of almost 8,000 hectares. Tay and Dao indigenous peoples were the majority in the Na Hang district when the dam was constructed. There are human rights concerns about missing compensation for relocation, with claims that infrastructure to support resettlement sites as agreed has been neglected by provincial authorities.[3]

The local government has tried to take advantage of the Na Hang District hydroelectric project for tourism.[4]

References

  • Son La Dam - Vietnam National Committee on Large Dams


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.