Murillo Flats

Murillo Flats is a three story, formerly seven unit brick apartment building in Des Moines, Iowa. Built in 1903, it was originally located at 531-533 14th at the intersection with High Street in the downtown area of the city. On March 1, 2008, in the largest relocation project scheduled for that year and an event covered by both local & national media, the 705-ton building was moved to a new location so that it could be preserved. It was listed on the National Register of Historic Places in 2009.

Murillo Flats
Location611 16th St.
Des Moines, Iowa
Coordinates41°35′14″N 93°38′20″W
Built1905
Architectural styleClassical Revival
NRHP reference No.09000404[1]
Added to NRHPJune 9, 2009

History

Previous owners of the building included sisters Florence and Helen Wyse from the 1920s through the 1990s and Gary Bowen, who had been trying for several years to sell condominiums prior to the building being purchased by Wellmark Blue Cross & Blue Shield.[2][3]

Move to 16th & High Street

Background

On September 15, 2007 Wellmark Blue Cross & Blue Shield announced plans to build a new company headquarters on three city blocks (6.5 acres) in downtown Des Moines. The land purchased by Wellmark contained several existing buildings, including a row home built in 1880 and the Murillo Building. These two were identified for preservation, and Wellmark indicated that they would give away the buildings on the condition that they were moved from the site by March 2008. Rob McCammon worked on the plan to relocate the buildings, with Phil Kaser agreeing to finance the Murillo Building move. Wellmark gave Kaser the building, along with a portion of the money saved from not having to demolish it. Kinter Construction was hired as the general contractor for both moves, who in turn brought in Patterson Structural Movers of Washington, Iowa to work on the Murillo.[3][4][5]

Preparations

Preparations for the move took 17 days. The building was cut from its foundation using water-lubricated chain saws, then raised using hydraulic equipment before finally being placed upon dollies with a total of 192 wheels, each of which was individually powered and could be turned 90 degrees in order to move a different direction without having to turn the entire building. Power lines were also moved along the planned route to accommodate the building's size.[3][5][6][7]

The Move

The building was to move three blocks along High Street to its new location. Due to concerns that the weight of the building may damage sewer pipes running under the street, Des Moines city officials wanted the relocation to occur during daylight hours on a Saturday. March 1 was the last day that the move could take place, otherwise Wellmark would have demolished the building. The relocation effort began just after dawn, but due to warming temperatures and melting snow the building could not initially be moved as the wheels stuck in the mud. The building eventually rolled onto High Street with the aid of two heavy-duty tow trucks from Hanifen Towing in Des Moines, but this part of the operation took more than four hours instead of the expected one. By Saturday evening the building was located on the street next to its final destination, and on March 2 was positioned over a hole dug in the lot where the new foundations will be built. The entire event was recorded on 9 cameras by Windfall Films for their Monster Moves show, which is broadcast in the United States on the Discovery Channel and National Geographic Channel (under the names Mega Moves & Impossible Moves). The Murillo move features in episode 5 of the third season ("Historic Hulks") [3][8][9][10][11] It is currently being shown on "Massive Moves" on the DIY network.

Future

Phil Kaser indicated that he intends to rent the apartments once the move has been completed, and possibly sell them as condominiums in the future.[3]

gollark: Python probably? It's considered beginner-friendly.
gollark: Boot into a Linux install/live CD of some sort, and try mounting it.
gollark: Because of some design flaws the RGB ended up overheating the SSD's controller, on one of them, making it throttle a lot.
gollark: Mostly they look like generic metal or plastic cuboids with SATA interfaces on them, or just PCBs with a bunch of flash chips and the M.2 connector, but some insane companies added RGB.
gollark: You should use a solid state SSD disk.

References

  1. "National Register Information System". National Register of Historic Places. National Park Service. March 13, 2009.
  2. "Court of Appeals of Iowa - State of Iowa vs. Stephen Blumberg". findlaw.com. 1999-12-17. Retrieved 2008-03-16.
  3. Elbert, David (2008-02-20). "Elbert: Two century-old buildings ready for their big trip". Des Moines Register. Retrieved 2008-03-16.
  4. "Wellmark to Build Headquarters in Downtown Des Moines". Wellmark Blue Cross & Blue Shield. 2007-09-15. Retrieved 2008-03-16.
  5. "Historic Buildings To Make Weekend Move". MSNBC.com. 2008-02-29. Retrieved 2008-03-16.
  6. "Crews Move 705-Ton Downtown Building". KCCI.com. 2008-02-29. Archived from the original on 2011-06-05. Retrieved 2008-03-16.
  7. "Moving the Murillo and Henshie-Briggs Row House". absolutedsm.com. 2008-03-02. Retrieved 2008-03-16.
  8. Leys, Tony (2008-03-02). "Mud messes up moving day for 2 old buildings". Des Moines Register. Retrieved 2008-03-16.
  9. "Cross Traffic Does Not Stop!". focalization.com. 2008-03-02. Retrieved 2008-03-16.
  10. "Historic Buildings Make Way For Downtown Project". whotv.com. 2008-03-01. Archived from the original on 2013-02-09. Retrieved 2008-03-16.
  11. "Productions - Monster Moves". Windfall Films Limited. Archived from the original on 2008-03-09. Retrieved 2008-03-16.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.