Mulago National Specialised Hospital

Mulago National Specialised Hospital,[1] also known as Mulago National Referral Hospital, is a component of Mulago Hospital Complex, the teaching facility of Makerere University College of Health Sciences. It is the largest public hospital in Uganda.[2]

Mulago National Specialised Hospital
Uganda Ministry of Health
Geography
LocationMulago, Kampala, Uganda
Coordinates00°20′16″N 32°34′32″E
Organisation
Care systemPublic
TypeGeneral and Teaching
Affiliated universityMakerere University College of Health Sciences
Services
Emergency departmentI
Beds1,000
History
Opened1913 (1913)
Links
Other linksHospitals in Uganda
Medical education in Uganda

Location

The hospital is on Mulago Hill in the northern part of the city of Kampala, immediately west of the Makerere University College of Health Sciences. It is approximately 5 kilometres (3 mi), by road, north-east of Kampala's central business district. The geographical coordinates of the hospital are 0°20'16.0"N, 32°34'32.0"E (Latitude:0.337786; Longitude:32.575550).[3]

Overview

This hospital, together with adjacent, affiliated hospitals and institutions constitute Mulago Hospital Complex, the teaching facility of the Makerere University College of Health Sciences. The hospital offers services in most medical and surgical subspecialties, in addition to dentistry, emergency medicine,  pediatrics, and intensive care.[4]

History

Old Mulago Hospital was founded in 1913 by Albert Ruskin Cook. New Mulago Hospital was completed in 1962. The hospital has an official capacity of 1,790 beds, although it often houses over 3,000 patients. In 2012, the annual hospital budget was USh33.2 billion. "Apparently, to run effectively, Mulago needs thrice its current budget."[5]

Mulago Hospital Complex

Mulago Hospital Complex is a term used to refer to the hospitals on Mulago Hill and the adjacent and affiliated medical institutions that serve as the teaching entity for Makerere University College of Health Science. As of April 2020, the complex housed an estimated 1,800 hospital beds. These units of the complex include the following:[6]

Note 1*: Infectious Diseases Institute is a component of Makerere University.
Note 2**: Uganda Cancer Institute and Uganda Heart Institute are self-accounting bodies, separate from Mulago Hospital.

Some credible sources reserve the term to refer to only the combination of (a) Old Mulago Hospital (b) Mulago Women's Referral Hospital and (c) Mulago National Specialized Hospital.[1][7][8]

Renovations

In October 2014, major renovations and rehabilitation works commenced at the hospital, the purpose of which was to bring about structural and performance improvements. These works, estimated to last 24 months, were the largest renovation works to the facility since the New Mulago (Lower Mulago) hospital block was completed 52 years earlier.[9]

The work was budgeted to cost US$29 million and the equipment was budgeted to cost US$20 million (sub-total US$49 million), financed by a loan from the African Development Bank. The government of Uganda had to co-fund US$9.5 million, bringing total cost to US$54.5 million. As part of the planned changes, the intensive care unit was enlarged from 7 beds to 41 beds, of which 27 are adult beds and 14 are pediatric beds. The mortuary was expanded from 16 to 160 slots; and, the number of operating theatres were increased from 7 to 22. Other changes include the decrease of total beds from 1,500 to 1,000. Of those, 900 beds are general inpatient beds, 6 are platinum beds for high net-worth individuals, 45 are gold rooms, and 49 are VVIP rooms. There will be a fee for service, the nature and amount to be determined by cabinet.[10][7][8][11]

In May 2019, the Cabinet of Uganda authorized the release of USh35.5 billion (US$9.5 million) to complete the renovations to the hospital. As of that date, the pending work, estimated at 8 percent of the total, included new windows, an ICT network installation, 6 new sub-terrain tanks, and expansion of the road network within the hospital complex. Once the funds are released, work is expected to take five months to completion.[12] Completion is expected later in 2020[1]

gollark: ÆÆÆÆÆÆÆÆÆÆÆÆA
gollark: ?ban <@319753218592866315> ÆÆÆÆÆÆÆÆÆÆÆÆÆÆÆÆÆ
gollark: ESOBOT IS DOWN?!?!?!?!?
gollark: ?tag lyricly projects
gollark: YET.

See also

References

  1. Conrad Ahabwe (27 January 2020). "Government Sets New Date For Opening of Refurbished Mulago hospital". Kampala: PML Daily. Retrieved 11 April 2020.
  2. Visit Kampala (2017). "About Mulago Hospital Uganda". Visitkampala.net. Retrieved 11 April 2020.
  3. Google (11 April 2020). "Location of Mulago National Specialised Hospital" (Map). Google Maps. Google. Retrieved 11 April 2020.
  4. Mulago Hospital (2014). "About Mulago National Referral Hospital". Kampala: Mulago National Referral Hospital. Archived from the original (Archived from the original on 14 July 2014) on 14 July 2014. Retrieved 11 April 2020.
  5. Chris Obore (20 January 2013). "Time bomb: The inside story of Mulago hospital's troubles". Daily Monitor. Kampala. Retrieved 11 April 2020.
  6. The Electives Network (2020). "The Electives Network: Mulago Hospital Complex". Bingham, Nottinghamshire, United Kingdom: The Electives Network. Retrieved 11 April 2020.
  7. Violet Nabatanzi (14 June 2015). "Mulago hospital renovation in high gear". New Vision. Kampala. Retrieved 11 April 2020.
  8. Violet Nabatanzi (17 December 2015). "Mulago to close blocks B and C for renovation". New Vision. Kampala. Archived from the original (Archived from the original on 18 December 2015) on 18 December 2015. Retrieved 11 April 2020.
  9. Agatha Ayebazibwe (11 October 2014). "Mulago Hospital Renovation Starts". Daily Monitor. Kampala. Retrieved 11 April 2020.
  10. Uganda Radio Network (9 December 2015). "Mulago Renovations Progress". The Observer (Uganda) Quoting Uganda Radio Network. Kampala. Retrieved 11 April 2020.
  11. Flavia Nassaka (16 June 2019). "Renovated Mulago to Open in December-Administrator". Kampala: Uganda Radio Network. Retrieved 11 April 2020.
  12. Al-Mahadi Adam Kungu (8 May 2019). "Cabinet Directs Finance To Avail Shs35 Billion Needed For Completion Of Mulago Renovation". Kampala: SoftPower Uganda. Retrieved 11 April 2020.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.