Mount Kop Tunnel
Mount Kop Tunnel (Turkish: Kop Dağı Tüneli) is a road tunnel under construction located on the province border of Bayburt and Erzurum as part of the route
Overview | |
---|---|
Location | Kop Pass, Maden, Bayburt-Aşkale, Erzurum, Turkey |
Coordinates | 40°02′15″N 40°29′19″E |
Status | Under construction |
Route | |
Operation | |
Work begun | August 23, 2012 |
Opened | End 2015 |
Owner | General Directorate of Highways |
Traffic | automotive |
Character | Twin-tube tunnel |
Technical | |
Length | 6,500 m (21,300 ft) |
Highest elevation | 2,050 m (6,730 ft) |
Situated on the Mount Kop of Pontic Mountains, it is a 6,500 m (21,300 ft)-long twin-tube tunnel.[1] The cost of the construction is estimated to be ₺319 million.[2][3]
It was built to bypass the Kop Pass at 2,409 m (7,904 ft) elevation with hairpin turns.[4] The tunnel will also eliminate the four-month-long traffic inaccessibility during the winter months due to harsh climatic conditions by heavy snow fall, icing and fog.[1][2] It will shorten the route about 6 km (3.7 mi) and reduce the travel time to one hour.[3] The tunnel is situated at 2,050 m (6,730 ft) elevation.[3][5]
The groundbreaking ceremony was held in presence of Minister of Transport, Maritime and Communication Binali Yıldırım on August 23, 2012.[4] Excavation works progress about 20 m (66 ft) daily in each tunnel tube.[5] Opening of the tunnel is scheduled end of 2015.[3]Currently, 150 personnel are at work.[5]
References
- Tekin, Salih (2011-12-22). "Kop Dağı 3 bin 800 metrelik tünelle aşılacak". Hürriyet (in Turkish). Retrieved 2014-04-19.
- Özonur, Nursima & Kerim Burucu (2012-12-21). "Kop Dağı tüneli 100 metre ilerledi". Radikal (in Turkish). Retrieved 2014-04-19.CS1 maint: uses authors parameter (link)
- Özkal, Hasan (2012-12-20). ""Kop Dağı Tüneli"nde Kazı Çalışmaları". Son dakika (in Turkish). Retrieved 2014-04-19.
- "Kop Dağı Tüneli'nin temeli törenle atıldı". Zaman (in Turkish). 2012-08-23. Archived from the original on 2014-04-20. Retrieved 2014-04-19.
- Bozkurt, Orhan & Levent Akpınar (2012-12-21). "Kop Tüneli'nde 24 saat mesai". Erzurum Ajans (in Turkish). Retrieved 2014-04-19.CS1 maint: uses authors parameter (link)