Mahindra Susten

Mahindra Susten Pvt. Ltd., formerly Mahindra EPC Services Pvt. Ltd. , is part of the USD 19 billion Mahindra Group. They are a portfolio company under the Cleantech arm of Mahindra Partners.

Mahindra Susten
Formerly
Mahindra EPC Services Pvt. Ltd.
Private
IndustryRenewable energy
Founded2010 (2010)[1]
HeadquartersMarol, Andheri, ,
Area served
Worldwide
ServicesSolar power plants, Solar telecom towers, turnkey EPC solutions
Number of employees
800 (2016-17)
ParentMahindra & Mahindra Limited
Websitewww.mahindrasusten.com
Footnotes / references
Installation: 2499 MWp[3]

In April 2013, Mahindra EPC had its 20 MW solar power project at Bikaner enlisted in the Ministry of New and Renewable Energy's - MNRE (India) merit list for early commissioning for Phase I, Batch II of the National Solar Mission.[4]

On 2 February 2015, the company was renamed Mahindra Susten. Susten is derived from the words - Sustainability and Enabler.[5]

History

Logo of the company when it was known as Mahindra EPC

The company commenced its services in 2011 in the renewable energy space with the turnkey execution of Utility scale, commercial & industrial rooftop Solar PV projects.[6]

In 2011, the company received the highest CRISIL- MNRE rating of SP1A for off-grid solar PV system.[7] The company diversified its business into telecom tower solarization, which are presently run on diesel.[8]

Mahindra Susten has also been named the Utility Solar EPC of the year for 2014 and 2015 by Bridge to India.[9]

Solar power plants

Distributed and Utility scale

Mahindra Susten built utility scale and distributed solar PV plants for clients including Softbank, SunEdison, Infosys, JK Tyres, Tech Mahindras. Some projects include -

Auto Consortium Project, Tamil Nadu, India

Mahindra EPC in November 2013, finished installation of a 3.18 MWp solar PV power plant for an Auto Consortium in the state of Tamil Nadu. With an estimated total project capacity of 50 MWp, this group of India's seven leading auto component manufacturers have pledged an investment of over INR 3.25 billion for captive consumption of clean energy.[10]

30 MW Solar PV Thin Film Plant near Jodhpur, Rajasthan, India

Comprising two separate projects of 10 MW and 20 MW, this installation under the second batch of Phase I of the Jawaharlal Nehru National Solar Mission (JNNSM), was commissioned in February 2013. With an annual generation in excess of 50 million units of energy this installation is expected to generate a carbon offset of nearly 40,000 MT CO2 annually.[11][12]

20 MW Solar PV Thin Film Plant near Bikaner, Rajasthan, India

In January 2013, Mahindra EPC commissioned their 20 MW plant near Bikaner which was then the first installation to have been completed under the Indian government’s JNNSM Phase 1 Batch 2 (JNNSM) initiative. The project utilizes a total of 270,000 thin-film PV modules supplied by First Solar. Spread across an area of 180 acres, the 20MWp solar PV plant is equipped to supply more than 38 million units of energy per year and is expected to displace nearly 30,000 MT of CO2 annually.[13][14][15]

5 MW Solar PV Single Axis Tracker Plant near Jodhpur, Rajasthan, India

Near Jodhpur, this 5 MW installation generates a high output per MW with its single axis tracker technology that maximises energy from the sun. Under the Indian government’s Jawaharlal Nehru National Solar Mission (JNNSM) Phase 1 Batch 1 initiative, the plant was the first to get connected to the state’s electrical grid, having been commissioned in January 2012, under 100 days.[16][17]

2 MW Solar PV Thin Film Plant at Lucknow in Uttar Pradesh, India

The plant at Lucknow was the first megawatt-scale installation in Uttar Pradesh (northern India), and was connected to the grid in January 2012, with a construction period of 71 days.[18]

Single Axis Solar Tracker (MSAT100)

Mahindra Susten has developed products aimed at increasing the efficiency and throughputs of Solar PV plants across all scales.[19] The MSAT100 is an indigenously designed & developed tracker which can help to substantially increase the generation potential of any solar setup. The company has supplied 500+ trackers & installed 226.04+MW tracker at sites in Tamil Nadu, Andhra Pradesh, Telangana& Thailand.

gollark: ... old chest-based storage? Yes, that would make sense.
gollark: ... was this on PB2 when you stole all my items, or...?
gollark: Eh, it's not relevant in creative.
gollark: It uses AE2 for internal fluid flow because *why not*.
gollark: Nope, singleplayer.

References

  1. Ministry of Corporate Affairs, Government of India
  2. "Susten". www.mahindrasusten.com. Retrieved 6 November 2016.
  3. http://www.mahindrasusten.com/key-facts.php
  4. Recognition for three solar projects of Mahindra EPC, The Hindu Business Line, April 3, 2013
  5. "Renewables company Mahindra EPC is now Mahindra Susten". www.mahindra.com. Retrieved 6 November 2016.
  6. KR Iyer,Mahindra’s solar unit to power 60,000 rural homes in Rajasthan Archived 2013-06-30 at Archive.today
  7. List of channel partners accredited by the Ministry of New and Renewable Energy (MNRE) for Off-Grid and Decentralized Solar Applications under JNNSM, Ministry of New and Renewable Energy, Government of India, March 5, 2013
  8. Mahindra Group sees 500-Mw opportunity in solar power, Business Standard, April 1, 2013
  9. Mahindra EPC to execute 50 MW solar consortium project, The Hindu, November 22, 2013
  10. M. Ramesh Kiran Energy commissions 55 MW solar plant in RajasthanThe Hindu Business Line, March 1, 2013
  11. Natalie Obiko Pearson Mahindra, Kiran Energy May Get IFC Loan for India Solar ProjectBloomberg Businessweek, May 2, 2012
  12. PR Fonroche and Mahindra EPC realize first Indo-French solar power investment in IndiaEnergy Next, Jan 10, 2013
  13. Solar PV Project Profile near Bikaner, Rajasthan,India PV-Tech, February 5, 2013
  14. Panchabhutha, PR Fonroche collaborates with Mahindra EPC to commission first solar plant under National Solar Mission Phase I, Batch IIPanchabuta, December 26, 2012
  15. Mahindra Solar commissions 5 MW plant in RajasthanThe Economic Times January 9, 2012
  16. Mahindra Solar Rajasthan Unit on stream The Hindu, January 10, 2012
  17. Sarosh Bana, India gets a solar plant in 100 daysRenewable Energy Focus, February 10, 2012
  18. "Single Axis Solar Tracking System, Photovoltaic Tracking Systems". www.mahindrasusten.com. Retrieved 2018-05-06.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.