MV Glen Sannox (2017)
MV Glen Sannox is a dual-fuel car and passenger ferry for Caledonian MacBrayne, currently under construction at Ferguson Marine in Port Glasgow on the Clyde. The ship is expected to be in service from late 2021 after lengthy delays.[4][5]
Glen Sannox after launching at Port Glasgow | |
History | |
---|---|
Name: | Glen Sannox[1] |
Namesake: | MV Glen Sannox (1957) and Glen Sannox on the Isle of Arran. |
Operator: | Caledonian MacBrayne |
Port of registry: | Glasgow |
Route: | Ardrossan - Brodick Late 2021 |
Builder: | Ferguson Marine, Port Glasgow, UK |
Cost: | £97M contract for two ferries |
Yard number: | 801 |
Laid down: | 17 February 2017 |
Launched: | 21 November 2017 |
Christened: | by Nicola Sturgeon |
Identification: | IMO number: 9794513 |
Status: | Under construction |
General characteristics | |
Tonnage: | 1,273 DWT[2] |
Length: | 102.4 m (335 ft 11 in)[2] |
Beam: | 17 m (55 ft 9 in)[2] |
Draught: | 3.4 m (11 ft 2 in)[2] |
Installed power: | 2 × Wärtsilä 34DF diesels.[3] |
Propulsion: |
|
Speed: | 14.5 kn (26.85 km/h)[2] |
Capacity: | 1000 passengers, 127 cars or 16 HGVs[1] |
History
MV Glen Sannox is to be the first of two Scottish ferries capable of operating on either marine diesel oil or liquefied natural gas (LNG), with benefits of a marked reduction in carbon dioxide, sulphur and nitrous oxide emissions.[1] Her name was chosen from a short list by public ballot and recalls an earlier Arran ferry.[6]
The first steel was cut on 7 April 2016 and Glen Sannox was launched on 21 November 2017 by the First Minister Nicola Sturgeon.[7]
In August 2018, new Cabinet Secretary for Transport Michael Matheson said it had been confirmed that the ship was to be delivered in June 2019, followed by two months of crew familiarisation and sea trials.[8] Further dispute over the contract overrun led to the shipyard going into administration and being nationalised by the Scottish Government.[9]
A report produced after nationalisation indicated that Glen Sannox should be handed over to CMAL in the last quarter of 2021 and that completing the two ferries is likely to increase the total cost to over £207M.[10] In April 2020, Ferguson Marine contracted with International Contract Engineering, a marine design consultant, to revise the design and outfitting of Glen Sannox in advance of her eventual delivery.[11]
On 10 August 2020, tugs moved Glen Sannox to the Garvel dry dock in Greenock for remedial work including replacement of her bulbous bow, paintwork repair and removal of marine growth.[12] She is scheduled to return to the Fergusons shipyard in Port Glasgow at the end of the month.[12]
Service
MV Glen Sannox was built for the Ardrossan to Brodick crossing and was originally expected to enter service early in 2018.[1] Construction delays led to her launch being put back to November 2017, with the ship then expected to begin operation in winter 2018/19.[13]
Glen Sannox is now expected to enter service in late 2021, partnering MV Caledonian Isles which will become the second ferry on the Ardrossan-Brodick and the Ardrossan-Campbeltown crossings.[4][5]
References
- "Caledonian Maritime Assets Limited- announces Scottish shipbuilder as preferred tenderer for two large ferries contract". CMAL. 31 August 2015. Retrieved 24 June 2017.
- "Presentation to Arran ferry Committee" (PPT). CMAL. 10 April 2017. Retrieved 23 June 2017.
- "Calmac picks Wärtsilä for two LNG ferries". Retrieved 23 June 2017.
- "Costs double on delayed CalMac ferry contract". BBC News. 18 December 2019. Retrieved 14 January 2020.
- "Ferguson Marine update". Scottish Government. 18 December 2019. Retrieved 14 January 2020.
- "CMAL announces name of first LNG ferry". CMAL. 1 June 2017. Retrieved 24 June 2017.
- "IN Pictures -- Launch Of Ferry Glen Sannox At Port Glasgow". Inverclyde Now. 21 November 2017. Retrieved 21 November 2017.
- Paul Fisher (15 August 2018). "New Arran Ferry set to launch next June - government confirms". Ardrossan Herald. Retrieved 15 August 2018.
- Douglas Fraser (18 August 2019). "Shipyard forecast: Sunshine becoming misty". BBC News. Retrieved 20 August 2019.
- Ferguson Marine: report on cost and programme for vessels 801 and 802, Scottish Government, 9 December 2019, retrieved 23 December 2019
- "Charting a New Course for Scottish Ferry Project". The Motorship. 6 April 2020. Retrieved 11 April 2020.
- "Clyde Shipping - Dry Dock Work For MV Glen Sannox Is 'Major Step' Forward". Inverclyde Now. 10 August 2020. Retrieved 11 August 2020.
- "Ferry MV Glen Sannox ready for launch at Port Glasgow yard". Greenock Telegraph. 19 November 2017. Retrieved 23 November 2017.