Lhasa–Xigazê railway

The Lhasa–Xigazê railway, or La'ri railway (simplified Chinese: 拉日铁路; traditional Chinese: 拉日鐵路; pinyin: Lārì Tiělù; Standard Tibetan: lha gzhis lcags lam ལྷ་གཞིས་ལྕགས་ལམ་), is a high-elevation railway that connects Lhasa to Xigazê, in the Tibet Autonomous Region.[1] The travel time between Lhasa and Xigazê on this line is roughly three hours.

Lhasa–Xigazê railway
The line's eastern terminus at Lhasa railway station
Overview
TypeHeavy rail
LocaleTibet Autonomous Region, China
TerminiLhasa railway station
Xigazê railway station
Operation
Opened16 August 2014 (2014-08-16)
Technical
Line length253 km (157 mi)
Number of tracks2
Track gauge1,435 mm (4 ft 8 12 in) standard gauge
Operating speed120 km/h

History

Inside Lhasa–Xigazê railway train

The line was a spur line of the Qinghai–Tibet railway. The length of the railway is 253 km (157 mi).[2] Construction began in September 2010 and was connected to the Qinghai–Tibet Railway in May 2013. The line was completed in July 2014 and opened for commercial operations on August 16, 2014. Soon after opening, the line became the primary mode of transport between Lhasa and Xigazê; the two destinations were previously only connected by road and air, and air travel was inaccessible at the time to the large majority of local residents.[3]

The exiled Central Tibetan Administration in Dharamsala has claimed that the rail line will dilute the cultural identity of Tibetans by accelerating the movement of Han migrants into Tibet.[4]

Stations

The line includes 14 stations, of which only a few sees regular passenger traffic (Qüxü, Rinbung). The project had a budget of 10.8 billion yuan.[5]

The completion of this project opened up possible extensions of the network further west and south into Nepal and to Yadong County, close to the border with Sikkim, India.[6]

Extension

Although there were plans to extend the line with another 700 km to the Chinese border with Nepal, those plans became delayed due to difficulties on the Nepal side after the April 2015 Nepal earthquake. Feasibility studies were proposed for extension towards Zhangmu, although another border crossing may be chosen due to major Nepali abandonment of the border post.[7]

Stations

  • Lhasa railway station (拉萨)
  • Lhasa South railway station (拉萨南)
  • Baide railway station (白德)
  • Xierong railway station (协荣)
  • Qüxü County railway station (曲水县)
  • Chabala railway station (茶巴拉)
  • Nyêmo railway station (尼木)
  • Karu railway station (卡如)
  • Rinbung railway station (仁布)
  • Dazhuka railway station (大竹卡)
  • Denggu railway station (灯古)
  • Jiqiong railway station (吉琼)
  • Kadui railway station (卡堆)
  • Xigazê railway station (日喀则)
gollark: Don't bother with that, just add a resistance checker thingy into the calculator.
gollark: When you're finished with a page of working, just set it on fire!
gollark: Oh, that piezo igniter *could* be useful for the calculator actually
gollark: Oh, this must be Sparkfun.
gollark: It's off by ONE SECOND per DAY!

See also

References

  1. "视频:青藏铁路延伸线拉日铁路今日开工". CCTV. Retrieved 24 September 2012.
  2. http://news.xinhuanet.com/english/china/2013-03/08/c_132219340.htm
  3. "Tibet railway opens to Xigaze". Railway Gazette. August 15, 2014. Retrieved August 16, 2014.
  4. "Lhasa-Shigatse rail line threatens cultural identity of Tibet". news.biharprabha.com. IANS. 25 July 2014. Retrieved 27 July 2014.
  5. F_493. "Lhasa-Shigatse railway to complete track-laying - People's Daily Online". chinatibet.people.com.cn. Retrieved 20 April 2018.
  6. Extension plans. Retrieved June 28, 2006
  7. "中国尼泊尔研跨境铁路 探索构建中尼印经济走廊". news.sina.com.cn. Retrieved 20 April 2018.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.