Kennedy Town Swimming Pool

The Kennedy Town Swimming Pool (Chinese: 堅尼地城游泳池) is a public swimming complex in Kennedy Town, Hong Kong. There have been two pools of this name. The first opened in 1974 while the current iteration opened in 2011.

Kennedy Town Swimming Pool
Pool complex
Address2 Sai Cheung Street North, Kennedy Town
Opened1974, rebuilt 2011–2017
Operated byLeisure and Cultural Services Department
ArchitectFarrells
CostHK$671 million (second generation)
WebsiteOfficial website

First generation

The first generation pool in 2010

Construction of the Kennedy Town Swimming Pool began in 1971 on the former site of the Kennedy Town cattle quarantine depot on Smithfield.[1] The $7.5 million facility was funded by the Royal Hong Kong Jockey Club and opened on 14 August 1974.[1][2] At the opening ceremony, Jockey Club steward Douglas Laing unveiled a commemorative plaque.[2] The pool was built and managed by the Urban Council and was the first public pool in Western District. The complex comprised two 50 metre pools, a diving pool, a spectator stand as well as smaller children's pools.

The West Island line, a scheme to extend the Island Line railway line to Western District, was gazetted in October 2007 and given final authorisation in March 2009. It was decided to build the terminus of the line, Kennedy Town Station, at Smithfield, necessitating the demolition of the swimming pool.

Second generation

A 2011 photo of the first phase of the second generation pool, taken prior to the construction of the second phase

The new swimming pool complex occupies a 0.8 ha site near the Kennedy Town waterfront.[3] It was designed by architecture firm Farrells, built by Paul Y. Engineering, and cost an estimated HK$671 million.[4] The complex includes two 50 metres pools, a 25-metre training pool, a children's pool and a jacuzzi. The futuristic pool building is clad in zinc, while a translucent insulated membrane roofing system allows diffuse natural light to reach the indoor pool hall.[5][6]

Comprising the outdoor pools only, the first phase of the new complex opened on 11 May 2011.[3]

The second phase of the swimming pool, comprising the indoor pools, was completed in 2016 and opened to the public on 7 February 2017.[7]

gollark: Maybe.
gollark: Except possibly accessibilitywise?
gollark: No.
gollark: It's also somewhat cheaper/higher capacity than normal DRAM.
gollark: And via use of something something memory bus the I/O to it can also be lower latency than NVMe.

References

  1. "Work starts on pool complex". South China Morning Post. 5 July 1971. p. 6.
  2. "Swim complex opens". South China Morning Post. 15 August 1974. p. 7.
  3. "Kennedy Town Swimming Pool to open for public use (with photos)". Hong Kong Government. 9 May 2011.
  4. Myall, Nick (23 May 2016). "Fitting into the neighbourhood". World Architecture News.
  5. "Kennedy Town Swimming Pool". Birdair. Retrieved 10 February 2017.
  6. Mara, Felix (1 November 2012). "Story of a shell: Kennedy Town Swimming Pool". Architects' Journal.
  7. "Heated Kennedy Town pools to open". Hong Kong Government. 3 February 2017.

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.