INS Vela (S40)

INS Vela (S40) was the lead ship of four diesel-electric Vela-class submarines of the Indian Navy. The submarine was commissioned on 31 August 1973 in Riga, Latvian SSR. Along with her sister ship Vagli, she spent almost 10 years undergoing a protracted refit by Hindustan Shipyard.[1] After 37 years of service, the submarine was decommissioned on 25 June 2010. The submarine was claimed by the Eastern Naval Command to be the oldest operational submarine in the world at the time of her decommissioning.[2][3][4][5]

History
India
Name: INS Vela
Commissioned: 31 August 1973
Decommissioned: 25 June 2010
General characteristics
Class and type: Vela-class submarine
Displacement:
  • 1,952 t (1,921 long tons) surfaced
  • 2,475 t (2,436 long tons) submerged
Length: 91.3 m (299 ft 6 in)
Beam: 7.5 m (24 ft 7 in)
Draught: 6 m (19 ft 8 in)
Speed:
  • 16 knots (30 km/h; 18 mph) surfaced
  • 15 knots (28 km/h; 17 mph) submerged
Range:
  • 20,000 mi (32,000 km) at 8 kn (15 km/h; 9.2 mph) surfaced
  • 380 mi (610 km) at 10 kn (19 km/h; 12 mph) submerged
Test depth: 250 m (820 ft)
Complement: 75 (incl 8 officers)
Armament:
  • 10 x 533 mm (21 in) torpedo tubes with 22 SET-65E/SAET-60 torpedoes
  • 44 mines in lieu of torpedoes

References

  1. Unnithan, Sandeep (17 November 2008). "Navy's sub induction plan suffers blow". India Today.
  2. "Archived copy". Archived from the original on 19 June 2009. Retrieved 6 August 2009.CS1 maint: archived copy as title (link)
  3. "Archived copy". Archived from the original on 28 June 2010. Retrieved 5 July 2010.CS1 maint: archived copy as title (link)
  4. Reporter, Staff. "INS Vela decommissioned". The Hindu. Retrieved 25 January 2017.
  5. Special Correspondent (24 June 2010). "Submarine to be decommissioned". The Hindu. Retrieved 18 June 2018.



This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.