HidroAysén
HidroAysén (Pronounced: /ˈiːdroʊ aɪˈsɛn/ EE-droh EYE-sen
The total expected installed power was 2,750 MW, generating an average 18,430 gigawatt-hours (66,300 TJ) per year, which corresponds to 21% of Central Interconnected System's (SIC) demand by 2020.[2] A 3,000 high-voltage direct current line would have been built between Aysén and the capital Santiago to feed the SIC, including a submarine portion between Chaitén and Puerto Montt. The projected cost was estimated at 3.2 billion U.S. dollars (1.5 trillion Chilean pesos), and would have employed 5,000 workers frome Chile and abroad, making it the largest energy project in the country's history.
HidroAysén is owned by a corporation which is a joint venture between Endesa (a subsidiary of Italian conglomerate ENEL), with a 51% stake and by Colbún S.A. which owns the other 49%.[3]
History
The dams were approved on May 9, 2011 under the government of President Sebastián Piñera.[4] The decision was made by eleven counselors on a committee. Ten voted in favor, with one abstention.[5] Twenty-seven days earlier the Foreign Investment Committee was already aware of the decision ahead of time.[6] The transmission line is yet to be approved. If completed these companies would own 80% of the Chilean energy market together establishing a duopoly.[7] The project was placed on hold in early June 2012 due to protests.[8] In June 2014, the project was rejected by the government of Chile, due to calls from environmentalists.[9]
Protests
The lack of transparency in the decision making process was widely criticized by the Chilean public; In fact it elicited nationwide street protests.[10][11] The main detractors hope to initiate legal actions against the project, and have assured that the public demonstrations will be massive.[12]
The planning process has also been harshly criticized by environmentalists and the local population of the Aysén del General Carlos Ibáñez del Campo Region. According to opinion polls in April 2011, the project was opposed by 61% of the population despite a massive public relations campaign in support of it.[13] Later that same month upon government approval of the project opposition climbed to 74%.[14]
The project is opposed by Greenpeace Chile with the slogan "¡Paren el circo, No a hidroaysén!" (Stop the circus, no Hidroaysén!) and "¡Salva la Patagonia!" (Save the Patagonia!).[15] local groups show their opposition to the project with banners and bumper stickers reading, "Patagonia Sin Represas" ("Patagonia without dams").
Court case
Corporación Chile Ambiente (Chile Environmental Corporation) along with private citizens Elizabeth Schindele and Fran Yave Schindele filed a lawsuit against the megaproject based on water rights. They lost their case in the district court and later the supreme court rejected their appeal under the procedural rationale that such water rights cases cannot be appealed beyond the discretion of the lower court[16] In June 2014, the project was rejected by the Chilean government due to its alleged environmental impact, however the decision may be appealed.[9]
Proponents
The project was supported by the business community, conservative president Sebastián Piñera, and former socialist president Ricardo Lagos who stated that the project as necessary in public comments on the issue.[17] A poll conducted in 2011 by La Tercera newspaper showed that the project was supported by 26% of the population, including 13% of self identified leftists and 41% of right wingers. Furthermore, 19% of young people 18 to 34 years old and 34% of older people over age 55 approved of the project. However, 72% of respondents believed the project would become reality.[17]
Environmental impact
The project was estimated to flood 5,900 hectares (15,000 acres) of natural reserves.
Based on study of the project construction and access roads would have impacted 6 national parks, 11 national reserves, 26 conservation priority sites, 16 wetland areas and 32 privately owned protected conservation areas.[7]
This is in addition to six Mapuche communities including four in Toltén and one Lautaro and Victoria.[18]
A portion of the Baker 2 dam was to be located in Laguna San Rafael National Park which would have caused irreversible environmental damage.[19]
- The Baker River.
- San Rafael Lagoon is Laguna San Rafael National Park's main attraction.
Film
At the year 2010 was released the documentary 180 Degrees South: Conquerors of the Useless, which tell the journey of Jeff Johnson at the 2007 from California to the Corcovado Volcano in the Chilean Patagonia. In the film one can see a part of the manifestations of the local people, disgruntled with the project of the dams on the Baker River.
References
- Cooperativa.cl. "Colbún y ENEL ponen fin al proyecto Hidroaysén". Cooperativa.cl (in Spanish). Retrieved 2020-04-10.
- "Hidroaysén" (in Spanish). Retrieved April 29, 2009.
- "HidroAysén retoma trámite ambiental y entrega adenda con respuestas" (in Spanish). Terra Colombia. April 11, 2011. Archived from the original on August 15, 2011. Retrieved April 23, 2011.
- "Biobío Chile: Autoridades aprueban proyecto hidroeléctrico HidroAysén" (in Spanish). May 9, 2011.
- "Biobío Chile: Conoce los votos de quienes participaron en la aprobación del proyecto HidroAysén" (in Spanish). 9 May 2011.
- Biobíochile.cl (May 11, 2011). "HidroAysén: Comité de Inversiones Extranjeras anticipó hace un mes la aprobación" (in Spanish). Retrieved May 11, 2011.
- Elvinculodigital.com (May 10, 2011). "Aprobado polémico megaproyecto hidroeléctrico en la Patagonia chilena" (in Spanish). Archived from the original on March 10, 2014. Retrieved May 11, 2011.
- "Controversial dam project in Chile's Patagonia region on hold". Los Angeles Times. 1 June 2012. Retrieved 2 June 2012.
- https://www.bbc.com/news/world-latin-america-27788286
- "Biobío Chile: Organizan diversas protestas en el país por aprobación de HidroAysén" (in Spanish). 9 May 2011.
- "Biobío Chile: Violentos incidentes se producen en las afueras del SEA luego de aprobación de HidroAysén" (in Spanish). May 9, 2011.
- "Biobío Chile: Batalla judicial anticipan detractores de HidroAysén" (in Spanish). May 10, 2011.
- "Ambientalistas destacan creciente rechazo a HidroAysén pese a enorme campaña publicitaria" (in Spanish). April 18, 2011. Retrieved April 21, 2011.
- La Tercera (May 15, 2011). "74% rechaza HidroAysén" (in Spanish). Retrieved May 16, 2011.
- ¡PAREN EL CIRCO! NO a HidroAysén. Greenpeace Chile. 6 de mayo de 2011.
- Chilean Supreme Court rejects claims of water rights in HidroAysén Archived 2011-10-28 at the Wayback Machine, ILoveChile.cl, October 27, 2011, retrieved October 30, 2011
- Ex presidente Lagos asegura que proyecto Hidroaysén "es necesario", Terra, 15 de Mayo de 2011, retrieved 30 October 2011
- BiobíoChile.cl (11 May 2011). "Comunidades mapuche se opondrán a instalación de torres de alta tensión de Hidroaysén" (in Spanish). Retrieved 11 May 2011.
- CNN Chile (10 February 2011). "Nueva denuncia contra Hidroaysén" (in Spanish). Archived from the original on 27 July 2011. Retrieved 12 May 2011.
External links
- English project website at the Wayback Machine (archived 1 November 2011)
- News
- May, Catalina (12 May 2011). "Chile dams will bring social and environmental destruction". The Guardian.