Huizhen Road station
Huizhen Road (simplified Chinese: 汇臻路; traditional Chinese: 匯臻路; pinyin: Huìzhēn Lù) is a station on the Pujiang line of the Shanghai Metro. The station is located at the intersection of Lunan Road and Huizhen Road,[1] and serves as the southern terminus of the line. The preceding station is Dongchengyi Road. It began passenger operations with the rest of the Pujiang Line on March 31, 2018.[3]
Station platform | |||||||||||
Location | Lunan Road at Huizhen Road[1] Minhang District, Shanghai China | ||||||||||
Coordinates | 31.027442°N 121.520311°E | ||||||||||
Operated by | Shanghai Keolis Public Transport Operation Management Co. Ltd.[2] | ||||||||||
Line(s) | Pujiang line | ||||||||||
Platforms | 2 (1 island platform) | ||||||||||
Construction | |||||||||||
Structure type | Elevated | ||||||||||
History | |||||||||||
Opened | March 31, 2018 | ||||||||||
Services | |||||||||||
|
History
This station opened for passenger operations on March 31, 2018, concurrent with the opening of the rest of the Pujiang line.[4]
Description
The station is located at the intersection of Lunan Road and Huizhen Road, in the Minhang District of Shanghai. The station structure is elevated, with the platforms located two levels above the street. The platform level consists of an island layout. Trains disembark passengers on the north platform, then proceed to turnaround at a crossover just west of the station, before returning to pick up passengers on the south platform. One level below the platform is the concourse level, which has a service counter and fare gates to enter the fare-paid area. Washrooms are available at street level, on the north side of the street, beside Exit 1. Like all stations on the Pujiang line, the station is fully accessible. The concourse and platform levels are connected by an elevator within the fare-paid zone. The concourse and street levels are connected by two elevators, one on each side of Lunan Road.[5]
Exits
- Exit 2: Huizhen Road, Lunan Road south side
- Exit 1: Huizhen Road, Lunan Road north side[5]
References
- 轨交8号线三期取名“浦江线” 将与沈杜公路站接驳_大申网_腾讯网. sh.qq.com (in Chinese).
- "Shanghai metro line 8 phase 3 | Shanghai Keolis". shkeolis.com.
- 注意!轨交浦江线预计明年一季度开通试运营! [Pujiang line to begin trial operations in first quarter of 2018]. news.163.com (in Chinese). Archived from the original on 2017-12-28. Retrieved 2017-12-28.
- 全自动无人驾驶!浦江线3月31日通车 全天运营约17小时. CNR.cn (in Chinese).
- Shanghai Shentong Metro Group Co., Ltd. 车站信息. Shanghai Metro (in Chinese). Retrieved 2018-04-08.