Holtwood Dam

Holtwood Dam (also Holtwood Hydroelectric Dam, Holtwood Hydroelectric Plant, McCalls Ferry Dam) is the oldest of three major dams built across the lower Susquehanna River, and the middle location of the three. It was constructed as the McCalls Ferry Dam between 1905 and 1910 by the Pennsylvania Water & Power (PW&P) Company. The dam was renamed Holtwood in honor of two company executives.[1] PW&P merged with Pennsylvania Power & Light (PPL) in 1955. In 2015 Talen Energy took over PPL's generation and immediately sold the Holtwood plant to Brookfield Renewable Energy Partners to comply with federal antitrust requirements.[2]

Holtwood Dam
Official nameHoltwood Hydroelectric Plant
LocationMartic Township, Lancaster County / Lower Chanceford Township, York County, Pennsylvania, USA
Coordinates39°49′36″N 76°20′10″W
Construction began1905
Opening date1910
Operator(s)Talen Energy
Dam and spillways
ImpoundsSusquehanna River
Height55 feet (17 m)
Length2,392 feet (729 m)
Reservoir
CreatesLake Aldred

Holtwood hydroelectric plant

The Holtwood Hydroelectric Plant produces 252 Megawatts of power, using 14 turbine driven generators. The dam consists of a main concrete dam, which is mostly one continuous spillway, with a power house at the eastern end. The water level is raised by wooden flash boards and inflatable dam sections.[3]

The western end of the dam has the original, and ineffective, fish ladder. In the mid 1990s, construction started on a fish lift. The fish lift and dam were damaged by heavy rain and rapid snowmelt from the severe 1996 flood in January of that year. The new fish lift was completed in time for the 1997 season[4] and began lifting american shad and other migratory fish species.

The Kingsbury thrust bearing of Holtwood's Generator No. 5 is designated an International Historic Mechanical Engineering Landmark. Previously used roller bearings would last about 2 months under the generator's 220 ton load, but the Kingsbury bearing has been in use since 1912.[5]

The impounded water, Lake Aldred, was originally dredged for anthracite coal silt, or fines, washed downstream from the Coal Region of Pennsylvania. This coal was used in the adjacent Holtwood Steam Generator station. When Safe Harbor Dam was built upstream, its impoundment was then "mined" for coal as well. More efficient primary mining upstream reduced the availability of fines, and 1972 environmental laws made the dredging impractical, so coal was brought in by train.[5]

Expansion project

In 2008, PPL announced plans to expand the plant with a second powerhouse.[6]

PPL received the approval to add the second powerhouse in November 2009 from the Federal Energy Regulatory Commission. Expansion of the plant started in 2010. Preliminary construction began in January 2010, with full construction beginning in April 2010. The project was completed in December 2013. The second powerhouse added 125 MW of additional capacity, increasing total generating capacity to more than 230 megawatts.[7][8][9]

One worker was killed during construction of the second powerhouse. Bruce Hardy, 59, of Bainbridge, Lancaster County, died after being crushed between a wall and an excavator bucket.[10]

The area below the dam is popular with whitewater kayakers, with eleven named hydraulic features.[11] Scheduled whitewater releases[12] from the dam are made, when conditions permit.

gollark: There are systems to do it automatically nowadays.
gollark: No, we could just use bee milk if it became an issue.
gollark: <:bonk:787781477328355378>
gollark: Not OS ones.
gollark: GREEN threads.

See also

References

  1. "The Conestoga Area Historical Society - Martic Township". Retrieved 2006-07-22.
  2. "Talen Energy sells Holtwood Dam". Retrieved 2016-07-22.
  3. "Lake Aldred Water Level to Drop for Holtwood Dam Maintenance". Archived from the original on 2006-03-15. Retrieved 2006-07-22.
  4. "How Fish Lifts Work". Safe Harbor Water Power Corporation. Archived from the original on 2006-07-16. Retrieved 2006-07-22.
  5. "The Kingsbury Bearing at Holtwood" (PDF). The American Society of Mechanical Engineers. Archived from the original (PDF) on 2013-05-12. Retrieved 2006-07-22.
  6. "Draft FERC Environmental Impact Statement for License Amendment for the Holtwood Hydroelectric Project". July 2008. Retrieved 2008-08-06.
  7. "Construction begins on Holtwood hydropower project expansion". 2010-04-30. Retrieved 2011-05-09.
  8. "Expansions of Holtwood hydropower project complete". www.hydroworld.com. Retrieved 2017-06-11.
  9. Generation, PPL. "PPL Holtwood doubles capacity of hydroelectric facility". www.prnewswire.com. Retrieved 2017-06-11.
  10. "Police Identify Worker Killed At Holtwood Dam". 2010-12-16. Retrieved 2011-05-09.
  11. Laucks, Jeremy. "Susquehanna Surf Guide" (PDF). Archived from the original (PDF) on 2006-06-22. Retrieved 2006-07-22.
  12. "Holtwood - Brookfield Renewable". renewableops.brookfield.com. Retrieved 2017-06-11.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.