Hatori Dam

Hatori Dam (羽鳥ダム, Hatori damu) is a dam in Ten'ei, Fukushima Prefecture, Japan.[1][2] Hatori Dam is managed directly by the Ministry of Agriculture, Forestry and Fisheries, and is intended to provide irrigation for the Shirakawa area of the Abukuma River Basin. The dam is an earth dam with a height of 37.1 meters. The reservoir created by the dam is called Lake Hatori, and has been developed as a resort area.

Hatori Dam
Hatori Dam
Location of Hatori Dam in Fukushima Prefecture
Hatori Dam (Japan)
Official name羽鳥ダム
LocationTen'ei, Fukushima, Japan
Coordinates37°16′18″N 140°04′34″E
Construction began1950
Opening date1956
Dam and spillways
Type of damearth-fill dam
ImpoundsTsurunuma River
Height37.1 m
Length169.5 m
Reservoir
CreatesLake Hatori
Total capacity27,321,000 m³
Catchment area42.7 km²
Surface area201 hectares

History

The Abukuma River that flows through the Nakadori region of central Fukushima prefecture was traditionally a strong granary area, due to lack of water in areas not immediately adjacent to the Abukuma River, and due to the fact that the average flow rate of the Abukuma River itself is also small (52.07 tons per second). During the Edo period, even a light drought was enough to result in crop failure. For this reason, efforts were made to take water from the Agano River (called the "Aga River" in Fukushima) which has an abundant flow rate of about eight times (395.86 tons per second) that of the average flow rate of the Abukuma River. In the Meiji period, the Azumi Canal was completed in 1882 bring water to the area from Lake Inawashiro, and momentum began to promote use of the Agano River to open up new agricultural land. A government project started in 1941, which eventually resulted in the Hatori Dam.The project was suspended by World War II, but was revived in 1950, and the dam was completed in 1956. Water stored at the dam crosses the watershead of the Ōu Mountains via tunnel and is led to the Abukuma River. At the time, it was one of the largest irrigation dams in Japan. The irrigation network continued to be expanded through 1964.

gollark: > Collectivization will take place naturally as soon as state coercion is over, the workers themselveswill own their workplaces as the capitalists will no longer have any control over them. This iswhat happened during the Spanish Revolution of 1936, during which workers and farmers seized andmanaged the means of production collectively. For those capitalists who had a good attitude towardsworkers before the revolution, there was also a place - they joined the horizontal labor collectivesUm. This seems optimistic.
gollark: > "Legally anyone can start their own business. Just launch a company!”. These words oftenmentioned by the fans of capitalism are very easy to counter, because they have a huge flaw. Namely,if everyone started a company, who would work for all these companiesThis is a bizarre objection. At the somewhat extreme end, stuff *could* probably still work fine if the majority of people were contracted out for work instead of acting as employees directly.
gollark: The hierarchical direct democracy thing it describes doesn't seem like a very complete or effective coordination mechanism, and it seems like it could easily create unfreedom.
gollark: I disagree with this PDF, for purposes.
gollark: There was that fun time when someone renamed themselves "all active players".

References


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.