Haltenpipe

Haltenpipe is a gas transport system which consists of a 250 kilometres (160 mi) long pipeline from the Heidrun field to Tjeldbergodden.[1] It started operation in December 1996, and is operated by Gassco. Transport capacity is 2.2. billion cubic metres per year.

Haltenpipe
Location
CountryNorway
FromHeidrun field
Passes throughNorth Sea
ToTjeldbergodden
General information
Typenatural gas
OwnerGassled
OperatorGassco
Technical service providerStatoil
Construction started1994
Commissioned1996
Technical information
Maximum discharge2.2. billion cubic metres per year
Diameter16 in (406 mm)

History

The Haltenpipe PAD (Norwegian: Plan for anlegg og drift) was approved by the Norwegian Parliament in February 1992. The construction of the pipeline started in 1994, and was finished in November 1996.[2] The Haltenpipe Joint Venture was established in June 1995.[3] The operatorship of Haltenpipe has been transferred from Statoil to Gassco. The licence will expire at end of 2020. The current licencees are Petoro, Statoil, ConocoPhilips and Eni.[4]

Gas delivery

Natural gas from the Heidrun field is delivered in part through the Åsgard Transport system to Kårstø, and in part through the Haltenpipe gasline to Tjeldbergodden.[5] A methanol plant built by Statoil and ConocoPhilips is located near the gas terminal at Tjeldbergodden. The annual delivery of Heidrun gas to the methanol plant is approximately 700 million cubic metres.[4] The methanol plant initiated production in June 1997. Gas is also delivered to a nearby gas fractionation and liquefaction plant, which has an annual capacity of 35 million cubic metres.[6] The total recoverable gas reserves at the Heidrun field has been estimated to be 41.6 billion cubic metres, while the estimated remaining amount as of 31 December 2008 was 30.1 billion cubic metres.[5]

gollark: Cloudflare: because who *doesn't* randomly want to have the contents of their website altered?
gollark: So now I just need to rearchitect the entire potatOS update system, since it is now in a folder.
gollark: Hmm, interesting, so apparently the GPL might apply to stuff you dynamically link to GPL stuff (according to its own wording?) but this may not actually stand up legally.
gollark: I would have to to get around your GPLization, in this scenario.
gollark: Make the actual CC-side code a simple GPL-licensed frontend for CC computers running in the cloud™ using CraftOS-PC or something.

References

  1. Lundberg, Nils H. "Haltenpipe". In Henriksen, Petter (ed.). Store norske leksikon (in Norwegian). Oslo: Kunnskapsforlaget. Retrieved 22 May 2010.
  2. "Rørledninger og landanlegg". Fakta 2001. Norsk petroleumsvirksomhet (in Norwegian). Ministry of Petroleum and Energy. 2001. p. 200.
  3. "Haltenpipe". Gassco. Retrieved 22 May 2010.
  4. "Pipelines and onshore facilities". Facts 2009. The Norwegian Petroleum Sector (PDF). Ministry of Petroleum and Energy. 2009. p. 200. Retrieved 22 May 2010.
  5. Facts 2009 p. 113
  6. Facts 2009 p. 205
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.