Fair Zone (Cairo Metro)

Fair Zone or Cairo Fair (Arabic: محطة المعرض / أرض المعارض) is a station on Cairo Metro, part of phase 2 of Line 3.[4] It is located on Salah Salem Street in front of the Cairo International Fair Ground, one of the most important commercial and administrative centers of Cairo.[5]

Cairo Fair Station

محطة المعرض
Cairo Metro Rapid transit
LocationEgypt
Coordinates30.07333°N 31.30091°E / 30.07333; 31.30091
Operated byCairo Metro - The Egyptian Co. for Metro Management & Operation[1]
Line(s)     Line 3
Platforms2 side platforms (Cairo International Airport - Imbaba)
Tracks2
Construction
Structure typeUnderground[2]
Platform levels3
History
Opened7 May 2014 (2014-05-07)[3]
ElectrifiedThird rail
Services
Preceding station   Cairo Metro   Following station
toward Imbaba
Line 3
Cairo Stadium
toward Airport

Overview

Cairo Fair Station was inaugurated on 7 May 2014 as part of phase 2 of Line 3.[3]

In addition, the station has a contactless fare collection system as well as an integrated supervision and communication system supplied by the Thales Group.[6]

Station layout

G Street Level Entrances/Exits
(Elevator)
B1 Underground Level 1 to entrances/exits, fare control
B2 Underground Level 2 Engine Rooms/Maintenance
P
Platform level
Side platform, doors will open on the left
Eastbound Cairo Metro Line 3 toward Airport (Cairo Stadium)
Westbound Cairo Metro Line 3 toward Imbaba (Abassiaa)
Side platform, doors will open on the left

Notable places nearby

gollark: There should really be a gollarious square™, then.
gollark: Oh, but Rust.
gollark: I do not wear programmer socks, I do not have a trans-flag keyboard or a mechanical one, I don't actually use C, I don't use a Thinkpad, I only have one commit per month or so, I do use Linux, I don't drink "monster", I do not have a trans flag either, I do use Arch, I don't use Gentoo, and I don't know what the /g/ - Technology thing means.
gollark: I'm not actually any of these.
gollark: I'm sorry you have to go through this.

See also

References

  1. "About Company". Cairo Metro. Retrieved 11 September 2014.
  2. Redmond, edited by Steve; Romero, Victor (2011). 2011 rapid excavation and tunneling conference proceedings. Englewood, Colo.: Society for Mining, Metallurgy, and Exploration, Inc. p. 881. ISBN 0873353439. Retrieved 12 September 2014.CS1 maint: extra text: authors list (link)
  3. "Cairo metro Line 3 extension opens". railwaygazette.com. railwaygazette.com. 8 May 2014. Retrieved 12 September 2014.
  4. "Phase 2 of Line 3". National Authority for Tunnels. Retrieved 11 September 2014.
  5. "Cairo Fair Station". National Authority for Tunnels. Retrieved 11 September 2014.
  6. "Thales awarded ticketing and supervision system contract for Line 3 of the Cairo Metro". Thales Group. 21 June 2009. Archived from the original on 18 May 2015. Retrieved 9 May 2015.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.