Dry Falls Dam

Dry Falls Dam is a rockfaced earthfill type[4] dam in the U.S. state of Washington. Located in Grant County near Coulee City, it was built as part of the Bureau of Reclamation's Columbia Basin Project. Water from the Columbia River, impounded by Grand Coulee Dam, is pumped into Grand Coulee, a formerly dry canyon, through the short Feeder Canal. Grand Coulee's north end is sealed by North Dam and Dry Falls Dam stretches across the midsection of the Coulee. This allows the water pumped from the Columbia River to fill the upper Grand Coulee, creating a large equalizing reservoir known as Banks Lake. Water from the reservoir is fed into the irrigation project's Main Canal, which runs south from Dry Falls Dam to another reservoir called Billy Clapp Lake, formed by Pinto Dam.

Dry Falls Dam
LocationGrant County, Washington, USA
Coordinates47°37′12″N 119°18′27″W
Opening date1949[1]
Operator(s)United States Bureau of Reclamation
Dam and spillways
ImpoundsGrand Coulee
Height123 feet (37 m)[2]
Length9,800 feet (2,990 m)[2]
Width (base)480 feet (150 m)[2]
Reservoir
CreatesBanks Lake
Total capacity1,275,000 acre feet (1.573 km3)[3]
Catchment area278.3 square miles (721 km2)[3]
Surface area27,000 acres (109 km2)

Works

Both North and Dry Falls Dams are rock-faced, earthfill dams. They were built to create Banks Lake, 27 miles (43 km) long as an equalizing reservoir, with storage capacity of 715,000 acre-feet for irrigation. The reverse flow back to the Columbia River, provides additional electrical power.[5] The feeder canal from Banks Lake has a capacity of 26,000 cubic feet per second, Dry Falls Dam and the Main Canal headworks are near Coulee City. While not a part of the Dry Falls Dam, the Main Canal Headworks was expanded to add a six pump/generating units. The Main Canal was widened from 50 feet (15 m) to 80 feet (24 m).[5]

History

Originally known as the South Coulee Dam, Dry Falls Dam began construction in 1946. Roy L. Blair and Company and James Crick and Sons, were awarded the contract for $2,771,887 to build the dam. Work began in mid-July. Included in the contract was the dam across the Grand Coulee, the approach channel, the headworks and control structure, and the initial reach to the main canal.[5] A cutoff trench was created down to bedrock along the length of the dam. A continuous concrete wall was centered in the trench with footings at least 3 feet (0.91 m). The wall prevents seepage of water under the dam, and is from 5 to 10 feet (1.5 to 3.0 m) high.[5] The construction of the canal head works began in March 1948, and was completed a year later. Designed as a zoned earth embankment structure with an impervious central core, a semi-pervious layer on either side of the core, and a layer of rock fill. The semi-pervious layer was built in 1 foot (0.30 m) layers and compacted. The rock fill laid up in 3 feet (0.91 m) layers without compaction.[5]

gollark: osmarkscalculator™ wouldn't be wrong like that.
gollark: That's just 9^9.
gollark: That is obviously wrong.
gollark: 1.9662705047555292e+77, if you like.
gollark: 196627050475552913618075908526912116283103450944214766927315415537966391196809 is also what I get if I do it left-associatively.

References

  1. United States Bureau of Reclamation (2012-05-17). "Dry Falls Dam: General". Retrieved 2015-01-23.
  2. The Story of the Columbia Basin Project. Washington D.C.: United States Government Printing Office. 1964. p. 59.
  3. United States Bureau of Reclamation (2012-05-17). "Dry Falls Dam: Hydraulics and Hydrology". Archived from the original on 2015-06-16. Retrieved 2015-01-23.
  4. Columbia Basin Project Archived December 6, 2008, at the Wayback Machine, Bureau of Reclamation
  5. https://www.usbr.gov/projects/facilities.php?region=Pacific Northwest
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.