Drogowa Trasa Średnicowa

Drogowa Trasa Średnicowa (DTŚ, can be translated as diametral highway or central highway) is a controlled-access highway in Silesian Voivodeship, Poland. The DTŚ is entirely a dual carriageway with a minimum of 3 lanes in each direction. It is one of the most important roads of the Upper Silesian Industrial Region.

Drogowa Trasa Średnicowa
Route information
Length31.3 km (19.4 mi)
Major junctions
  Gliwice, ul. Portowa DK 88
...[1]

16.7 km (10.4 mi) Ruda Śląska

18.3 km (11.4 mi) ul. Niedurnego DW 925

21 km (13 mi) Świętochłowice, ul. Bytomska

22.3 km (13.9 mi) ul. Żołnierska, ul. Nomiarki

23.3 km (14.5 mi) Chorzów, ul. Dąbrowskiego

23.8 km (14.8 mi) ul. BoWiD

25 km (16 mi) ul. Gałeczki

26 km (16 mi) Katowice, ul. Mieszka I

bridge over ul. Bracka, 600 m (2,000 ft) long

27.5 km (17.1 mi) DK 79

28.9 km (18.0 mi) ul. Stęślickiego, ul. Grundmanna

29.4 km (18.3 mi) ul. Sokolska

29.7 km (18.5 mi) Jerzy Ziętek Rondo

under Jerzy Ziętek Rondo, northern 657 m (2,156 ft) long, southern 650 m (2,130 ft) long

31.3 km (19.4 mi) al. Roździeńskiego DK 86
Location
RegionsSilesian Voivodeship
Major citiesGliwice, Zabrze, Ruda Śląska, Świętochłowice, Chorzów, Katowice
Highway system
National roads in Poland
Voivodeship roads
DTŚ in the Katowice city center

The DTŚ runs most of its course parallel to the A4 motorway but, unlike the A4, the DTŚ provides access to the congested centers of the Upper Silesian Metropolitan Union with 26 junctions (A4 has 6 junctions in the comparable section).[2]

The DTŚ runs from Katowice through Chorzów and Świętochłowice, Ruda Śląska, Zabrze to Gliwice.

The construction of road resulted in a considerable improvement in the traffic of the highly urbanized area of Upper Silesian Metropolitan Union. It shortened the road distance between Katowice and Gliwice by 26%, travelling time by 76%, consumption of gasoline by 47%, the number of road accidents by 82%, exploitation costs by 39%, and air pollution by 50%.[2]

History of construction

The DTŚ is the largest road investment ever carried out by a local government in Poland. The construction started in 1986. In 1990, due to Polish financial problems, the work practically halted. Since 1994 the budget for construction increased thanks to the European Investment Bank (EIB) that provided a guarantee of funding. Since 1999 the construction of the DTŚ has been a shared responsibility of the Polish government, local government of the Silesian Voivodeship and of the cities through which the road runs, and work progresses steadily. A local organization in Gliwice has been protesting against proposed layout of the road through the city center (on ecological basis).[3] The construction has been completed in 2016.

An eastern extension of the DTŚ is planned for a more distant future. This branch would run from Katowice to Mysłowice, Sosnowiec, Będzin and Dąbrowa Górnicza. The planned length of this section is 22.3 km (13.9 mi).

gollark: I try and detect any evil intentions from the ladder, d6.
gollark: I look around for staircases, d6.
gollark: I conjure a torso, d6.
gollark: Amazing.
gollark: I check for traps, d6.

References

  1. Discontinuity of route
  2. "Roads to Euro 2012. An Analysis of Poland's Road Infrastructure. Current Status and the Development Opportunities." American Chamber of Commerce in Poland, Warszawa, June 2007.
  3. GdG Association (in Polish)

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.