Dortmund-Kley station
Dortmund-Kley station is in the district of Kley of the city of Dortmund in the German state of North Rhine-Westphalia. It was built on a loop line (line 2190) off the Witten/Dortmund–Oberhausen/Duisburg railway, which was opened on 24 September 1983 from Bochum-Langendreer to Dortmund-Dorstfeld.[5] The station was opened on 24 September 1983[4] and it is classified by Deutsche Bahn as a category 5 station.[1]
Through station | |||||||||||
Location | Kleyer-Weg, Dortmund, North Rhine-Westphalia Germany | ||||||||||
Coordinates | 51°29′22″N 7°21′56″E | ||||||||||
Line(s) | Witten/Dortmund–Oberhausen/Duisburg railway (KBS 450.1) | ||||||||||
Platforms | 2 | ||||||||||
Other information | |||||||||||
Station code | 1311[1] | ||||||||||
DS100 code | EDK[2] | ||||||||||
IBNR | 8004269 | ||||||||||
Category | 5[1] | ||||||||||
Fare zone | VRR: 374[3] | ||||||||||
Website | www.bahnhof.de | ||||||||||
History | |||||||||||
Opened | 24 September 1983[4] | ||||||||||
Services | |||||||||||
|
The station is served by line S 1 of the Rhine-Ruhr S-Bahn (Dortmund–Solingen) on week days every 15 minutes during the day between Dortmund and Essen.[6]
In addition, the station is served by buses on line 470, operated by DSW21 at twenty-minute intervals.[6]
Notes
- "Stationspreisliste 2020" [Station price list 2020] (PDF) (in German). DB Station&Service. 4 November 2019. Retrieved 15 November 2019.
- Eisenbahnatlas Deutschland (German railway atlas) (10 ed.). Schweers + Wall. 2017. ISBN 978-3-89494-146-8.
- "Liniennetzplan/Wabenplan" (PDF). Bochum-Gelsenkirchener Straßenbahnen AG. April 2013. Retrieved 4 November 2019.
- Joost, André. "Dortmund-Kley station operations". NRW Rail Archive (in German). Retrieved 13 May 2020.
- Joost, André. "Line 2190: Bochum - Dortmund". NRW Rail Archive (in German). Retrieved 13 May 2020.
- Joost, André. "Dortmund-Kley station". NRW Rail Archive (in German). Retrieved 13 May 2020.
gollark: I suppose baidicoot thought "hmm, how might I find whether a player is on a tile I'm rendering". Now, you might think "hmm yes, the solution to this is just to maintain a map of coordinates to entities, or something like that". But no! The game ITERATES OVER ALL PLAYERS FOR EVERY SINGLE TILE.
gollark: Wow this is some very not good code.
gollark: Oh, no, 50 still used 70% CPU.
gollark: Huh, it turns out that this might be indirectly O(players²)...
gollark: this code is HIGHLY not good.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.